SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
Effective Risk Management in Innovative Projects: A Case Study of the Construction of Energy-efficient, Sustainable Building of the Laboratory of Intelligent Building in Cracow
4 references·2 citing·21 second hop
Effective Risk Management in Innovative Projects: A Case Study of the Construction of Energy-efficient, Sustainable Building of the Laboratory of Intelligent Building in Cracow (2017)Effective Risk Management in Innovative P…Risk Analysis in Construction Project - Chosen Methods (2015)Risk Analysis in Construction…The quantitative risk assessment of MINI, MIDI and MAXI Horizontal Directional Drilling Projects applying Fuzzy Fault Tree Analysis (2014)The quantitative risk assessm…Uncertainty and Ground Conditions: A Risk Management Approach (2006)Uncertainty and Ground Condit…Diagnosing risks in product-innovation projects (1994)Diagnosing risks in product-i…Human and Equipment Risk Factors Evaluation in Horizontal Directional Drilling Technology Using Failure Mode and Effect Analysis (2021)Human and Equipment Risk Fact…Comprehensive Risk Management in Horizontal Directional Drilling Projects (2020)Comprehensive Risk Management…A proposal for construction project risk assessment using fuzzy logic (2000)Use and benefits of tools for project risk management (2001)Risk assessment of construction projects (2010)An application of WASPAS method in risk qualitative analysis: a case study of a road construction project in Iran (2019)Delay Causes and Emerging Digital Tools: A Novel Model of Delay Analysis, Including Integrated Project Delivery and PMBOK (2019)Qualitative and quantitative project risk assessment using a hybrid PMBOK model developed under uncertainty conditions (2020)Fuzzy sets (1965)Fuzzy sets (1996)Modified Bayesian Network–Based Risk Analysis of Construction Projects: Case Study of South Pars Gas Field Development Projects (2018)Combining Monte Carlo Simulation and Bayesian Networks Methods for Assessing Completion Time of Projects under Risk (2019)New Products: What Separates Winners from Losers? (1987)Project management — A managerial approach (1989)Diagnosing Constraints in Knowledge of SMEs (1998)Predicting and Managing Supply Chain Risks (2008)Risks in major innovation projects, a multiple case study within a world's leading company in the fast moving consumer goods (2009)The Strategic Management of Technology and Innovation (2020)Fuzzy Reliability Analyzer: Quantitative Assessment of Risk Events in the Construction Industry Using Fuzzy Fault-Tree Analysis (2010)Risk management. Guidelines (2018)Development of a fuzzy FMEA based product design system (2007)Failure mode and effects analysis (FMEA) for risk assessment based on interval type-2 fuzzy evidential reasoning method (2020)The consistency analysis of failure mode and effect analysis (FMEA) in information technology risk assessment (2020)
this work references cited by second hop

References

  • 2015Risk Analysis in Construction Project - Chosen Methods118 cited
  • 2006Uncertainty and Ground Conditions: A Risk Management Approach56 cited
  • 1994Diagnosing risks in product-innovation projects56 cited
  • 2014The quantitative risk assessment of MINI, MIDI and MAXI Horizontal Directional Drilling Projects applying Fuzzy Fault Tree Analysis34 cited

Cited by

  • 2020Comprehensive Risk Management in Horizontal Directional Drilling Projects28 cited
  • 2021Human and Equipment Risk Factors Evaluation in Horizontal Directional Drilling Technology Using Failure Mode and Effect Analysis8 cited

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work