No open-access location is known for this record yet.
No open-access location is known for this record yet.
This study considers a multi-product multi-machine economic production quantity inventory problem in an imperfect production system that produces two types of defective items: items that require rework and scrapped items. The shortage is allowed and fully backordered. The scrapped items are disposed with a disposal cost and the rework is done at the end of the normal production period. Moreover, a potential set of available machines for utilization is considered such that each has a specific production rate per item. Each machine has its own utilization cost, setup time and production rate per item. The considered constraints are initial capital to utilize machines and production floor space. The proposed inventory model is a mixed integer non-linear programing mathematical model. The problem is solved using a bi-level approach, first, the set of machines to be utilized and the production allocation of items on each machine are obtained thru a genetic algorithm. Then, using the convexity attribute of the second level problem the optimum cycle length per machine is determined. The proposed hybrid genetic algorithm outperformed conventional genetic algorithm and a GAMS solver, considering solution quality and solving time. Finally, a sensitivity analysis is also given.
Loading…
Stored only when both papers are in the corpus — 16 citations exist upstream.
Papers that cite the same references — the relational fallback while embeddings are still backfilling.
Imported from OpenAlex (CC0) — nothing here is generated.