Optimization model for construction project resource leveling using a novel modified symbiotic organisms search
16 references·0 citing·36 second hop
Optimization model for construction project resource leveling using a novel modified symbiotic organisms search (2018)Optimization model for construction proje…Fuzzy Resource Constraint Project Scheduling Problem Using CBO and CSS Algorithms (2016)Fuzzy Resource Constraint Pro…Optimizing Multiple-Resources Leveling in Multiple Projects Using Discrete Symbiotic Organisms Search (2015)Optimizing Multiple-Resources…A novel Multiple Objective Symbiotic Organisms Search (MOSOS) for time–cost–labor utilization tradeoff problem (2015)A novel Multiple Objective Sy…Construction Project Management: A Practical Guide to Field Construction Management (2010)Construction Project Manageme…An improved ant colony optimization algorithm for nonlinear resource-leveling problems (2010)An improved ant colony optimi…Optimizing Resource Leveling in Construction Projects (2009)Optimizing Resource Leveling …Minimum Moment Method for Resource Leveling Using Entropy Maximization (2009)Minimum Moment Method for Res…Evolutionary resource scheduler for linear projects (2007)Evolutionary resource schedul…Causes of delay in large construction projects (2006)Causes of delay in large cons…Selecting a delay analysis method in resolving construction claims (2005)Selecting a delay analysis me…Resource leveling in construction by genetic algorithm-based optimization and its decision support system application (2000)Resource leveling in construc…Optimization of Resource Allocation and Leveling Using Genetic Algorithms (1999)Optimization of Resource Allo…Multiheuristic Approach for Resource Leveling Problem in Construction Engineering: Hybrid Approach (1999)Multiheuristic Approach for R…Packing Method for Resource Leveling (Pack) (1990)Packing Method for Resource L…Resource Leveling in Construction by Optimization (1989)Resource Leveling in Construc…Resource Management in Construction (1986)Resource Management in Constr…Construction Resource Scheduling with Genetic Algorithms (1996)GA-Based Multicriteria Optimal Model for Construction Scheduling (1999)Optimizing project selection and scheduling problems with time-dependent resource constraints (2011)Solving Resource-Constrained Project Scheduling Problem via Genetic Algorithm (2019)Critical path methods in construction practice (1970)Project Management With Cpm, Pert and Precedence Diagramming (1983)Resource Leveling of Linear Schedules Using Integer Linear Programming (1998)Mixed-integer linear programming for resource leveling problems (2012)Building effective decision support systems (1982)Decision support and expert systems (1993)Using Genetic Algorithms to Solve Construction Time-Cost Trade-Off Problems (1997)Metaheuristics for project and construction management – A state-of-the-art review (2011)The Resource Leveling Problem with multiple resources using an adaptive genetic algorithm (2012)A Comparison of Heuristic and Optimum Solutions in Resource-Constrained Project Scheduling (1975)Time-Cost-Quality Trade-Off Analysis for Highway Construction (2005)Fuzzy critical chain method for project scheduling under resource constraints and uncertainty (2007)Multi-mode resource-constrained discrete time–cost-resource optimization in project scheduling using non-dominated sorting genetic algorithm (2012)Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation (1996)The impact of shift and night work on health (1996)Shift work, safety and productivity (2003)Utility of Genetic Algorithms for Solving Large-Scale Construction Time-Cost Trade-Off Problems (2017)Integrating Quality and Safety in Construction Scheduling Time-Cost Trade-Off Model (2020)Opposition multiple objective symbiotic organisms search (OMOSOS) for time, cost, quality and work continuity tradeoff in repetitive projects (2017)Time–cost–quality trade-off analysis for planning construction projects (2019)Discrete symbiotic organisms search method for solving large-scale time-cost trade-off problem in construction scheduling (2020)Causes and effects of delays in Malaysian construction industry (2007)Delay and cost overruns in Vietnam large construction projects: A comparison with other selected countries (2008)Analysing factors affecting delays in Indian construction projects (2011)Need for Alternative Research Approaches in Construction Management: Case of Delay Studies (2012)Effect of organizational culture on delay in construction (2016)The top 10 universal delay factors in construction projects (2018)Resource Scheduling Using Neural Dynamics Model of Adeli and Park (2001)Use of Genetic Algorithms in Resource Scheduling of Construction Projects (2004)A Study of Risk Management Techniques for Construction Projects in Developing Countries (2013)Strengths and shortcomings of methodologies for production planning and control of construction projects: a systematic literature review and future perspectives (2020)Holistic Study and Analysis of Factors Affecting Collaborative Planning in Construction (2021)
this work references cited by second hop

References

  • 2006Causes of delay in large construction projects1,721 cited
  • 1999Optimization of Resource Allocation and Leveling Using Genetic Algorithms421 cited
  • 2005Selecting a delay analysis method in resolving construction claims212 cited
  • 1989Resource Leveling in Construction by Optimization190 cited
  • 2015A novel Multiple Objective Symbiotic Organisms Search (MOSOS) for time–cost–labor utilization tradeoff problem164 cited
  • 2000Resource leveling in construction by genetic algorithm-based optimization and its decision support system application160 cited
  • 1990Packing Method for Resource Leveling (Pack)141 cited
  • 2010Construction Project Management: A Practical Guide to Field Construction Management126 cited
  • 2009Optimizing Resource Leveling in Construction Projects120 cited
  • 2015Optimizing Multiple-Resources Leveling in Multiple Projects Using Discrete Symbiotic Organisms Search116 cited
  • 1999Multiheuristic Approach for Resource Leveling Problem in Construction Engineering: Hybrid Approach95 cited
  • 2007Evolutionary resource scheduler for linear projects91 cited
  • 1986Resource Management in Construction72 cited
  • 2010An improved ant colony optimization algorithm for nonlinear resource-leveling problems63 cited

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work

2009
Minimum Moment Method for Resource Leveling Using Entropy Maximization
60 cited
  • 2016Fuzzy Resource Constraint Project Scheduling Problem Using CBO and CSS Algorithms59 cited