SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
Integrated Risk of Progress-Based Costs and Schedule Delays in Construction Projects
9 references·1 citing·37 second hop
Integrated Risk of Progress-Based Costs and Schedule Delays in Construction Projects (2018)Integrated Risk of Progress-Based Costs a…Integrated Cost-Schedule Risk Analysis (2016)Integrated Cost-Schedule Risk…Methodology for Integrated Risk Management and Proactive Scheduling of Construction Projects (2008)Methodology for Integrated Ri…Delays in construction projects: The case of Jordan (2007)Delays in construction projec…Construction Project Network Evaluation with Correlated Schedule Risk Analysis Model (2007)Construction Project Network …Causes and effects of delays in Malaysian construction industry (2007)Causes and effects of delays …Causes of delay in large construction projects (2006)Causes of delay in large cons…Reasons for Cost and Schedule Increase for Engineering Design Projects (2002)Reasons for Cost and Schedule…An exploratory study into recurring construction problems (2000)An exploratory study into rec…Scheduling/Cost Optimization and Neural Dynamics Model for Construction (1997)Scheduling/Cost Optimization …Modeling and Analyzing Factors Affecting Project Delays Using an Integrated Social Network-Fuzzy MICMAC Approach (2019)Modeling and Analyzing Factor…Business Research Methods (1984)Analyzing delay causes in Egyptian construction projects (2013)Factors Affecting Schedule Delay, Cost Overrun, and Quality Level in Public Construction Projects (2015)Exploring delay causes of road construction projects in Egypt (2016)Critical factors in successful project implementation (1987)A comparative study of causes of time overruns in Hong Kong construction projects (1997)Beyond the point of no return: On the management of deviations (2007)Contractor management performance evaluation model at prequalification stage (2015)Construction Delays in Indonesia, Malaysia, Thailand, and Vietnam (2019)Research methods for business: A skill building approach (1993)Concurrent Delays in Construction Projects (1987)Building Theories from Case Study Research (1989)Critical Success Factors for Construction Projects (1992)Factors Affecting Construction Cost in Mara Large Construction Project: Perspective of Project Management Consultant (2010)Three-Stage Least-Squares Analysis of Time and Cost Overruns in Construction Contracts (2010)Preliminary Study on Causative Factors Leading to Construction Cost Overrun (2011)Narrow Reliability Bounds for Structural Systems (1979)Project Management for Engineering and Construction (1993)Risk Management and Construction (1993)Schedule risk analysis of infrastructure projects: A hybrid dynamic approach (2018)Bayesian Monte Carlo Simulation–Driven Approach for Construction Schedule Risk Inference (2020)Data-Driven Machine Learning Approach to Integrate Field Submittals in Project Scheduling (2020)Fuzzy sets (1965)Fuzzy sets (1996)Principles and Practice of Structural Equation Modeling (2012)A Guide to the project management body of knowledge (1996)Project Scheduling: A Research Handbook (2002)Robust Project Scheduling (2009)New strategies for stochastic resource-constrained project scheduling (2017)A Systematic Literature Review of MABAC Method and Applications: An Outlook for Sustainability and Circularity (2023)Delay and cost overruns in Vietnam large construction projects: A comparison with other selected countries (2008)Analysing factors affecting delays in Indian construction projects (2011)Resource Scheduling Using Neural Dynamics Model of Adeli and Park (2001)A review of methods and algorithms for optimizing construction scheduling (2013)A Novel Machine Learning Model for Estimation of Sale Prices of Real Estate Units (2015)Probabilistic Control of Project Performance Using Control Limit Curves (2007)An ex ante control chart for project monitoring using earned duration management observations (2017)
this work references cited by second hop

References

  • 2006Causes of delay in large construction projects1,721 cited
  • 2007Causes and effects of delays in Malaysian construction industry1,428 cited
  • 2007Delays in construction projects: The case of Jordan539 cited
  • 1997Scheduling/Cost Optimization and Neural Dynamics Model for Construction224 cited
  • 2002Reasons for Cost and Schedule Increase for Engineering Design Projects133 cited
  • 2008Methodology for Integrated Risk Management and Proactive Scheduling of Construction Projects113 cited
  • 2007Construction Project Network Evaluation with Correlated Schedule Risk Analysis Model96 cited
  • 2000An exploratory study into recurring construction problems53 cited
  • 2016Integrated Cost-Schedule Risk Analysis50 cited

Cited by

  • 2019Modeling and Analyzing Factors Affecting Project Delays Using an Integrated Social Network-Fuzzy MICMAC Approach32 cited

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work