No open-access location is known for this record yet.
No open-access location is known for this record yet.
Abstract In this paper, we study and compare several integer and mixed‐integer linear programming formulations for the multi‐skill resource‐constrained project scheduling problem. This is a problem characterized by a set of activities to be executed that in addition to the usual precedence constraints require several resources for each skill needed for their execution. A set of multi‐skill resources is assumed. The objective is to minimize the project's makespan. We revisit two existing models for the problem and propose two new ones. Additionally, we perform a theoretical comparison between the lower bounds provided by the linear programming relaxations of the models. Furthermore, a numerical experiment is performed on a set of instances from the literature to evaluate the suitability of an off‐the‐shelf solver to compute optimal solutions and lower bounds to the studied problem, using the aforementioned models.
Loading…
Stored only when both papers are in the corpus — 44 citations exist upstream.
Papers that cite the same references — the relational fallback while embeddings are still backfilling.
Imported from OpenAlex (CC0) — nothing here is generated.