SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
DEVELOPMENT OF AN APPROXIMATE CONSTRUCTION DURATION PREDICTION MODEL DURING THE PROJECT PLANNING PHASE FOR GENERAL OFFICE BUILDINGS
10 references·0 citing·45 second hop
DEVELOPMENT OF AN APPROXIMATE CONSTRUCTION DURATION PREDICTION MODEL DURING THE PROJECT PLANNING PHASE FOR GENERAL OFFICE BUILDINGS (2018)DEVELOPMENT OF AN APPROXIMATE CONSTRUCTIO…Estimation of Costs and Durations of Construction of Urban Roads Using ANN and SVM (2017)Estimation of Costs and Durat…Duration prediction models for construction projects: In terms of cost or physical characteristics? (2016)Duration prediction models fo…CAUSES AND EFFECT OF DELAY ON PROJECT CONSTRUCTION DELIVERY TIME (2014)CAUSES AND EFFECT OF DELAY ON…DEVELOPING A CONSTRUCTION-DURATION MODEL BASED ON A HISTORICAL DATASET FOR BUILDING PROJECT / STATYBŲ PROJEKTO REALIZAVIMO TRUKMĖS MODELIO, PAGRĮSTO ISTORINIAIS DUOMENIMIS, KŪRIMAS (2011)DEVELOPING A CONSTRUCTION-DUR…A CBR-based hybrid model for predicting a construction duration and cost based on project characteristics in multi-family housing projects (2010)A CBR-based hybrid model for …Estimating Performance Time for Construction Projects (2007)Estimating Performance Time f…Time–Cost Relationships in Australian Building Construction Projects (2005)Time–Cost Relationships in Au…The predictive ability of Bromilow's timecost model (2001)The predictive ability of Bro…Estimation of project total cost and duration for housing projects in the U.K. (1996)Estimation of project total c…Relationship between value and duration of construction projects (1991)Relationship between value an…Neural Network Model for Parametric Cost Estimation of Highway Projects (1998)Performance Measurement in Construction (2004)Predicting Construction Cost Using Multiple Regression Techniques (2006)MRA-based revised CBR model for cost prediction in the early stage of construction projects (2011)The development of a construction cost prediction model with improved prediction capacity using the advanced CBR approach (2011)HYBRID FORECASTING SYSTEM BASED ON CASE-BASED REASONING AND ANALYTIC HIERARCHY PROCESS FOR COST ESTIMATION (2013)The survey research handbook (1990)Book Review: Questionnaire Design, Interviewing and Attitude Measurement (1993)Influence of Project Type and Procurement Method on Rework Costs in Building Construction Projects (2002)Time‐cost model for building projects in Nigeria (2006)Identifying the key process factors affecting project performance (2016)A comparative study of causes of time overruns in Hong Kong construction projects (1997)FACTORS AFFECTING THE PERFORMANCE OF CONSTRUCTION PROJECTS IN THE GAZA STRIP (2009)Risk assessment of construction projects (2010)USING SOFT PRECEDENCE RELATIONS FOR REDUCTION OF THE CONSTRUCTION PROJECT DURATION (2012)AN EARLY COST ESTIMATION MODEL FOR HYDROELECTRIC POWER PLANT PROJECTS USING NEURAL NETWORKS AND MULTIPLE REGRESSION ANALYSIS (2015)Improvement in Estimating Durations for Building Projects Using Artificial Neural Network and Sensitivity Analysis (2021)Economics: principles and policy (1963)Economics--principles and policy (1979)Compressing construction durations: lessons learned from Hong Kong building projects (2002)Analysis of the Design-Build Delivery Method in Air Force Construction Projects (2009)PCIM: Project Control and Inhibiting-Factors Management Model (2012)Risk and Value in Privately Financed Health Care Projects (2012)Critical path methods in construction practice (1970)Modelling and predicting construction durations in Hong Kong public housing (1999)Developing a benchmark model for project construction time performance in Hong Kong (2003)The role of managerial actions in the cost, time and quality performance of high-rise commercial building projects (1985)An investigation into construction time performance (1995)Trends in productivity improvement in the US construction industry (2000)Investigation on the Factors Influencing Construction Time and Cost Overrun for High-Rise Building Projects In Penang (2018)Prediction of cost and duration of building construction using artificial neural network (2022)Factors influencing construction time and cost overruns on high-rise projects in Indonesia (1997)Causes of construction delay: traditional contracts (2002)Impact of Construction Delay-Controlling Parameters on Project Schedule: DEMATEL-System Dynamics Modeling Approach (2022)Investigation of Project Delays: Towards a Sustainable Construction Industry (2023)Reasons for delays in public projects in Turkey (1985)Conceptual estimation of construction duration and cost of public highway projects (2022)A neural network approach for early cost estimation of structural systems of buildings (2004)Comparison of construction cost estimating models based on regression analysis, neural networks, and case-based reasoning (2004)Machine learning model for delay risk assessment in tall building projects (2020)Developing an Integrative Data Intelligence Model for Construction Cost Estimation (2022)Advancement of Artificial Intelligence in Cost Estimation for Project Management Success: A Systematic Review of Machine Learning, Deep Learning, Regression, and Hybrid Models (2025)Determinants of construction duration (1995)Analysis of cost and schedule performance of international development projects (2009)Using Intelligent Techniques in Construction Project Cost Estimation: 10-Year Survey (2014)
this work references cited by second hop

References

  • 2005Time–Cost Relationships in Australian Building Construction Projects136 cited
  • 1991Relationship between value and duration of construction projects126 cited
  • 2010A CBR-based hybrid model for predicting a construction duration and cost based on project characteristics in multi-family housing projects119 cited
  • 2007Estimating Performance Time for Construction Projects95 cited
  • 2014CAUSES AND EFFECT OF DELAY ON PROJECT CONSTRUCTION DELIVERY TIME91 cited
  • 2017Estimation of Costs and Durations of Construction of Urban Roads Using ANN and SVM79 cited
  • 2001The predictive ability of Bromilow's timecost model77 cited
  • 1996Estimation of project total cost and duration for housing projects in the U.K.71 cited
  • 2011DEVELOPING A CONSTRUCTION-DURATION MODEL BASED ON A HISTORICAL DATASET FOR BUILDING PROJECT / STATYBŲ PROJEKTO REALIZAVIMO TRUKMĖS MODELIO, PAGRĮSTO ISTORINIAIS DUOMENIMIS, KŪRIMAS39 cited
  • 2016Duration prediction models for construction projects: In terms of cost or physical characteristics?32 cited

Cited by

No citing works inside the corpus for this window.

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work