SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
Planning Recovery and Reconstruction After the 2010 Maule Earthquake and Tsunami in Chile
9 references·0 citing·32 second hop
Planning Recovery and Reconstruction After the 2010 Maule Earthquake and Tsunami in Chile (2018)Planning Recovery and Reconstruction Afte…Factors Affecting the Speed and Quality of Post-Disaster Recovery and Resilience (2017)Factors Affecting the Speed a…Speed or deliberation: a comparison of post‐disaster recovery in Japan, Turkey, and Chile (2016)Speed or deliberation: a comp…Planning Resettlement After Disasters (2014)Planning Resettlement After D…Chile’s 2010 M8.8 Earthquake and Tsunami: Initial Observations on Resilience (2010)Chile’s 2010 M8.8 Earthquake …Planning After Hurricane Katrina (2006)Planning After Hurricane Katr…The Disaster Recovery Process: What We Know And Do Not Know From Research (1999)The Disaster Recovery Process…The Integration of Housing Recovery into Reconstruction Planning (1996)The Integration of Housing Re…Post-Earthquake Rehabilitation and Reconstruction (1996)Post-Earthquake Rehabilitatio…Decision-Making for Recovery and Reconstruction Following a Strong Earthquake (1996)Decision-Making for Recovery …Reconstruction following disaster (1977)Reconstruction following disaster (1978)Disasters: Theory and Research (1979)Planning for Post-Disaster Recovery and Reconstruction (1998)Enabling Participatory Planning After Disasters: A Case Study of the World Bank's Housing Reconstruction in Turkey (2008)A framework for community participation in post-disaster housing reconstruction projects: A case of Afghanistan (2016)What is ‘social resilience’? Perspectives of disaster researchers, emergency management practitioners, and policymakers in New Zealand (2016)The Prosperous Community: Social Capital and Public Life (1993)Case study research: design and methods (2011)Yin, R. K. (2009). Case study research: Design and methods (4th Ed.). Thousand Oaks, CA: Sage. (2013)Black feminism and radical planning: New directions for disaster planning research (2018)Identifying local needs for post-disaster recovery in Nepal (2019)Agendas, Alternatives, and Public Policies (1985)Perception of Risk (1987)The Meaning of ‘Build Back Better’: Evidence From Post‐Tsunami Aceh and Sri Lanka (2008)A matter of speed: The impact of material choice in post-disaster reconstruction (2018)“Build back better” approach to disaster recovery: Research trends since 2006 (2019)Capacity planning and reconfiguration for disaster-resilient health infrastructure (2019)Safer Homes, Stronger Communities (2010)Safer Homes, Stronger Communities: A Handbook for Reconstructing after Natural Disasters (2010)Agendas, alternatives, and public policies (1984)Social Capital and Community Resilience (2014)Speed and quality of recovery after the Gorkha Earthquake 2015 Nepal (2020)Natural Disasters—Origins, Impacts, Management (2021)Disasters and Development (1983)Human System Responses to Disaster: An Inventory of Sociological Findings. (1988)After disaster: agenda setting, public policy, and focusing events (1998)Longer View: Planning for the Rebuilding of New Orleans (2008)Towards a critical geography of disaster recovery politics: Perspectives on crisis and hope (2017)Social media data and post-disaster recovery (2018)Multi-objective probabilistically constrained programs with variable risk: Models for multi-portfolio financial optimization (2016)Technical–Social Tandem in Restoration of Buildings under Emergency Conditions: 40 Homes in Spain (2019)
this work references cited by second hop

References

  • 2006Planning After Hurricane Katrina200 cited
  • 1999The Disaster Recovery Process: What We Know And Do Not Know From Research170 cited
  • 2014Planning Resettlement After Disasters76 cited
  • 2016Speed or deliberation: a comparison of post‐disaster recovery in Japan, Turkey, and Chile75 cited
  • 2017Factors Affecting the Speed and Quality of Post-Disaster Recovery and Resilience53 cited
  • 1996Post-Earthquake Rehabilitation and Reconstruction20 cited
  • 2010Chile’s 2010 M8.8 Earthquake and Tsunami: Initial Observations on Resilience14 cited
  • 1996Decision-Making for Recovery and Reconstruction Following a Strong Earthquake9 cited
  • 1996The Integration of Housing Recovery into Reconstruction Planning5 cited

Cited by

No citing works inside the corpus for this window.

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work