No open-access location is known for this record yet.
No open-access location is known for this record yet.
This paper presents a simultaneous multi-criteria optimization approach for scheduling linear infrastructure projects. The proposed model provides planners with sets of non-dominated alternatives and their corresponding tradeoffs. The associated research methodology includes: (1) developing a resource driven scheduling module; (2) applying a multi-criteria optimization technique to optimize the multi-objective scheduling problem; (3) integrating the proposed model with a commercial project management software; and (4) applying the developed model on two literature-drawn case studies. The developed multi-criteria optimization approach utilizes Genetic Algorithms and Pareto Front sorting. The resulting sets of schedules are based on the multiple inter-conflicting objectives of simultaneously minimizing project duration, minimizing cost, minimizing interruptions, and minimizing unit delivery delays. The results indicate that the proposed approach can explore a greater range of solutions compared to existing models. The developed multi-criteria optimization approach can aid planners with proposing optimal set of schedules.
Loading…
Stored only when both papers are in the corpus — 34 citations exist upstream.
Papers that cite the same references — the relational fallback while embeddings are still backfilling.
Imported from OpenAlex (CC0) — nothing here is generated.