Robust resource-constrained max-NPV project scheduling with stochastic activity duration
16 references·2 citing·34 second hop
Robust resource-constrained max-NPV project scheduling with stochastic activity duration (2018)Robust resource-constrained max-NPV proje…A survey of variants and extensions of the resource-constrained project scheduling problem (2009)A survey of variants and exte…Proactive heuristic procedures for robust project scheduling: An experimental analysis (2007)Proactive heuristic procedure…The trade-off between stability and makespan in resource-constrained project scheduling (2005)The trade-off between stabili…An investigation of buffer sizing techniques in critical chain scheduling (2005)An investigation of buffer si…The use of buffers in project management: The trade-off between stability and makespan (2004)The use of buffers in project…Stability and resource allocation in project planning (2004)Stability and resource alloca…Simulated annealing and tabu search for multi-mode resource-constrained project scheduling with positive discounted cash flows and different payment models (2004)Simulated annealing and tabu …Project scheduling under uncertainty: Survey and research potentials (2004)Project scheduling under unce…The construction of stable project baseline schedules (2003)The construction of stable pr…Insertion techniques for static and dynamic resource-constrained project scheduling (2003)Insertion techniques for stat…A new efficient simulated annealing algorithm for the resource-constrained project scheduling problem and its multiple mode version (2003)A new efficient simulated ann…On the merits and pitfalls of critical chain scheduling (2001)On the merits and pitfalls of…Project network models with discounted cash flows a guided tour through recent developments (1997)Project network models with d…A Branch-and-Bound Procedure for the Multiple Resource-Constrained Project Scheduling Problem (1992)A Branch-and-Bound Procedure …Scheduling a Project to Maximize Its Present Value: A Zero-One Programming Approach (1977)Scheduling a Project to Maxim…Cash Flows in Networks (1970)Cash Flows in NetworksTabu search for proactive project scheduling problem with flexible resources (2023)Tabu search for proactive pro…The integration of resource allocation and time buffering for bi-objective robust project scheduling (2019)The integration of resource a…PSPLIB - A project scheduling problem library (1997)Resource-constrained project scheduling: Notation, classification, models, and methods (1999)Robust scheduling and robustness measures for the discrete time/cost trade-off problem (2010)A purely proactive scheduling procedure for the resource-constrained project scheduling problem with stochastic activity durations (2015)An adjustable robust optimization model for the resource-constrained project scheduling problem with uncertain activity durations (2016)Activity networks: Project planning and control by network models (1977)Project Scheduling: A Research Handbook (2002)Project Scheduling—Theory and Practice (2005)A two-stage-priority-rule-based algorithm for robust resource-constrained project scheduling (2007)Proactive and reactive strategies for resource-constrained project scheduling with uncertain resource availabilities (2007)Simulation Modeling and Analysis. (1983)Simulation modeling and analysis (1999)Experimental evaluation of state-of-the-art heuristics for the resource-constrained project scheduling problem (2000)A process framework for theoretically grounded prescriptive research in the project management field (2012)Theory of constraints: review and bibliometric analysis (2018)Out of the Crisis (1982)Resource-constrained project scheduling: A survey of recent developments (1998)A bi-objective model for robust resource-constrained project scheduling (2004)Robust and reactive project scheduling: a review and classification of procedures (2004)The evolution of a management philosophy: The theory of constraints (2006)Critical-Path Planning and Scheduling: Mathematical Basis (1961)Solving Project Scheduling Problems by Minimum Cut Computations (2003)Robust Discrete Optimization and Its Applications (1997)Robust Discrete Optimization and Its Applications. (1998)Characterization and Generation of a General Class of Resource-Constrained Project Scheduling Problems (1995)Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation (1996)A hybrid scatter search/electromagnetism meta-heuristic for project scheduling (2004)A genetic algorithm for the preemptive and non-preemptive multi-mode resource-constrained project scheduling problem (2009)A competitive genetic algorithm for resource-constrained project scheduling (1998)A hybrid genetic algorithm for the resource-constrained project scheduling problem (2007)Event-based MILP models for resource-constrained project scheduling problems (2009)Resource-constrained multi-project scheduling: Priority rule performance revisited (2010)A survey of hybrid metaheuristics for the resource-constrained project scheduling problem (2019)An updated survey of variants and extensions of the resource-constrained project scheduling problem (2021)
this work references cited by second hop

References

  • 2004Project scheduling under uncertainty: Survey and research potentials976 cited
  • 2009A survey of variants and extensions of the resource-constrained project scheduling problem901 cited
  • 1992A Branch-and-Bound Procedure for the Multiple Resource-Constrained Project Scheduling Problem606 cited
  • 2003A new efficient simulated annealing algorithm for the resource-constrained project scheduling problem and its multiple mode version511 cited
  • 2001On the merits and pitfalls of critical chain scheduling350 cited
  • 2003Insertion techniques for static and dynamic resource-constrained project scheduling294 cited
  • 2007Proactive heuristic procedures for robust project scheduling: An experimental analysis244 cited
  • 2004The use of buffers in project management: The trade-off between stability and makespan232 cited
  • 2005An investigation of buffer sizing techniques in critical chain scheduling230 cited
  • 1970Cash Flows in Networks230 cited
  • 2003The construction of stable project baseline schedules186 cited
  • 2004Simulated annealing and tabu search for multi-mode resource-constrained project scheduling with positive discounted cash flows and different payment models174 cited
  • 1997Project network models with discounted cash flows a guided tour through recent developments173 cited
  • 1977Scheduling a Project to Maximize Its Present Value: A Zero-One Programming Approach

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work

147 cited
  • 2004Stability and resource allocation in project planning145 cited
  • 2005The trade-off between stability and makespan in resource-constrained project scheduling142 cited
  • Cited by

    • 2023Tabu search for proactive project scheduling problem with flexible resources32 cited
    • 2019The integration of resource allocation and time buffering for bi-objective robust project scheduling30 cited