SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
Assessment of the consequences of deficiencies in design documents in Saudi Arabia
16 references·1 citing·44 second hop
Assessment of the consequences of deficiencies in design documents in Saudi Arabia (2018)Assessment of the consequences of deficie…Profiling causative factors leading to construction project delays in the United Arab Emirates (2017)Profiling causative factors l…Factors Affecting Schedule Delay, Cost Overrun, and Quality Level in Public Construction Projects (2015)Factors Affecting Schedule De…Construction delays causing risks on time and cost - a critical review (2012)Construction delays causing r…Factors of Conflict in Construction Industry: A Literature Review (2011)Factors of Conflict in Constr…A system dynamics model for assessing the impacts of design errors in construction projects (2011)A system dynamics model for a…Project Pathogens: The Anatomy of Omission Errors in Construction and Resource Engineering Project (2009)Project Pathogens: The Anatom…Causes, Effects, Benefits, and Remedies of Change Orders on Public Construction Projects in Oman (2009)Causes, Effects, Benefits, an…Causes of delay in large construction projects (2006)Causes of delay in large cons…Design documents quality in the Japanese construction industry: factors influencing and impacts on construction process (2003)Design documents quality in t…Causes of construction delay: traditional contracts (2002)Causes of construction delay:…Small to Medium Contractor Contingency and Assumption of Risk (1999)Small to Medium Contractor Co…Determining the causal structure of rework influences in construction (1999)Determining the causal struct…Total quality management in the construction process (1997)Total quality management in t…Causes of Quality Deviations in Design and Construction (1992)Causes of Quality Deviations …Construction Claims: Frequency and Severity (1985)Construction Claims: Frequenc…Construction Project Administration (1978)Construction Project Administ…An investigation of how stakeholders influence construction project performance: a small and medium sized contractor’s perspective in the Jordanian construction industry (2022)An investigation of how stake…Designing to Reduce Construction Costs (1976)Risk Management Perceptions and Trends of U.S. Construction (1995)Risk and its management in the Kuwaiti construction industry: a contractors’ perspective (2001)Partnering: what is it, when should it be used, and how should it be implemented? (2010)Moving Beyond Optimism Bias and Strategic Misrepresentation: An Explanation for Social Infrastructure Project Cost Overruns (2011)A comparative study of causes of time overruns in Hong Kong construction projects (1997)Factors influencing construction time and cost overruns on high-rise projects in Indonesia (1997)Construction delay: a quantitative analysis (2000)Delay and cost overruns in Vietnam large construction projects: A comparison with other selected countries (2008)Analysing factors affecting delays in Indian construction projects (2011)THE DISCOVERY OF GROUNDED THEORY: STRATEGIES FOR QUALITATIVE RESEARCH. By Barney G. Glaser and Anselm L. Strauss. Chicago: Aldine Publishing Company, 1967. 271 pp. $6.75 (1968)Case Study Research: Design and Methods (1984)Quantifying the causes and costs of rework in construction (2000)Influence of Project Type and Procurement Method on Rework Costs in Building Construction Projects (2002)Simulation in manufacturing and business: A review (2009)The Discovery of Grounded Theory (2017)Causes of delay and cost overruns in Nigerian construction projects (1994)Causes of Delay in Large Building Construction Projects (1995)Total quality control (1961)Total quality control (1961)Out of the Crisis (1982)Trends in productivity improvement in the US construction industry (2000)Partnering Mechanism in Construction: An Empirical Study on the Chinese Construction Industry (2006)Structural Equation Model for Evaluating Factors Affecting Quality of Social Infrastructure Projects (2018)Measuring Design and Construction Quality Costs (1989)An exploration towards a production theory and its application to construction (2000)Designing Complex Organizations (1973)Transaction-Cost Economics: The Governance of Contractual Relations (1979)Exploring the Black Box: An Analysis of Work Group Diversity, Conflict and Performance (1999)Impacts of Different Types of Owner-Contractor Conflict on Cost Performance in Construction Projects (2014)Identification of Causes and Effects of Poor Communication in Construction Industry: A Theoretical Review (2017)Social conflict management framework for project viability: Case studies from Korean megaprojects (2017)Research methods for business: A skill building approach (1993)A framework for quality management research and an associated measurement instrument (1994)Exploring delay causes of road construction projects in Egypt (2016)Analysis of Delay Impact on Construction Project Based on RII and Correlation Coefficient: Empirical Study (2017)Causes of delays on construction projects: a comprehensive list (2019)Causes and effects of delays in Malaysian construction industry (2007)Identification of Risk Paths in International Construction Projects Using Structural Equation Modeling (2011)Need for Alternative Research Approaches in Construction Management: Case of Delay Studies (2012)Risk Paths in International Construction Projects: Case Study from Chinese Contractors (2016)Impact of Change Orders on Labor Efficiency for Electrical Construction (1999)Causes of delays in Saudi Arabian public sector construction projects (2009)Risk assessment of construction projects (2010)
this work references cited by second hop

References

  • 2006Causes of delay in large construction projects1,781 cited
  • 2002Causes of construction delay: traditional contracts833 cited
  • 1992Causes of Quality Deviations in Design and Construction446 cited
  • 1997Total quality management in the construction process428 cited
  • 2015Factors Affecting Schedule Delay, Cost Overrun, and Quality Level in Public Construction Projects412 cited
  • 2009Causes, Effects, Benefits, and Remedies of Change Orders on Public Construction Projects in Oman234 cited
  • 1999Determining the causal structure of rework influences in construction211 cited
  • 1978Construction Project Administration191 cited
  • 2011Factors of Conflict in Construction Industry: A Literature Review182 cited
  • 2003Design documents quality in the Japanese construction industry: factors influencing and impacts on construction process168 cited
  • 2011A system dynamics model for assessing the impacts of design errors in construction projects165 cited
  • 2009Project Pathogens: The Anatomy of Omission Errors in Construction and Resource Engineering Project154 cited
  • 2012Construction delays causing risks on time and cost - a critical review146 cited
  • 2017Profiling causative factors leading to construction project delays in the United Arab Emirates146 cited

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work

  • 1999Small to Medium Contractor Contingency and Assumption of Risk145 cited
  • 1985Construction Claims: Frequency and Severity138 cited
  • Cited by

    • 2022An investigation of how stakeholders influence construction project performance: a small and medium sized contractor’s perspective in the Jordanian construction industry26 cited