this work references cited by second hopReferences
- 1986Optimal Lot Sizing, Process Quality Improvement and Setup Cost Reduction1,161 cited
- 2000Economic production quantity model for items with imperfect quality1,049 cited
- 1986Economic Production Cycles with Imperfect Production Processes1,049 cited
- 1967A deterministic inventory model for reparable items379 cited
- 2001Production lot sizing with the reworking of imperfect quality items produced287 cited
- 2010A production-inventory model of imperfect quality products in a three-layer supply chain270 cited
- 2009Economic production quantity with rework process at a single-stage manufacturing system with planned backorders259 cited
- 2004Optimal manufacturing batch size with rework process at a single-stage production system249 cited
- 2003Determining the optimal lot size for the finite production model with random defective rate, the rework process, and backlogging222 cited
- 2009An economic production lot size model in an imperfect production system208 cited
- 2010An economic order quantity (EOQ) for items with imperfect quality and inspection errors203 cited
- 2009A production–inventory model in an imperfect production process196 cited
- 2009Economic production quantity model with imperfect-quality items, two-way imperfect inspection and sales return166 cited
- 2013An EOQ model with imperfect quality items, inspection errors, shortage backordering, and sales returns
Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work