Updating ground conditions and time-cost scatter-gram in tunnels during excavation
8 references·0 citing·35 second hop
Updating ground conditions and time-cost scatter-gram in tunnels during excavation (2019)Updating ground conditions and time-cost …Risk evaluation of tunneling projects (2012)Risk evaluation of tunneling …Design a new intelligence expert decision making using game theory and fuzzy AHP to risk management in design, construction, and operation of tunnel projects (case studies: Resalat tunnel) (2010)Design a new intelligence exp…Quantitative risk evaluation based on event tree analysis technique: Application to the design of shield TBM (2008)Quantitative risk evaluation …Simulation modeling techniques for underground infrastructure construction processes (2007)Simulation modeling technique…Bayesian Updating Application into Simulation in the North Edmonton Sanitary Trunk Tunnel Project (2006)Bayesian Updating Application…Model for Estimation of Time and Cost for Tunnel Projects Based on Risk Evaluation (2005)Model for Estimation of Time …What Causes Cost Overrun in Transport Infrastructure Projects? (2004)What Causes Cost Overrun in T…Updating the Decision Aids for Tunneling (2002)Updating the Decision Aids fo…Operations Research: Principles and Practice (1977)A Guide to the project management body of knowledge (1996)Simulation with Visual SLAM and AweSim (1997)Evaluation of Disturbances in Mechanized Tunneling Using Process Simulation (2015)Probabilistic Risk Analysis of Diversion Tunnel Construction Simulation (2017)Fuzzy sets (1965)Multiple Attribute Decision Making: Methods and Applications (1981)Fuzzy sets (1996)THE USE OF AHP AND RANK CORRELATION METHODS FOR DETERMINING THE SIGNIFICANCE OF THE INTERACTION BETWEEN THE ELEMENTS OF A TRANSPORT SYSTEM HAVING A STRONG INFLUENCE ON TRAFFIC SAFETY (2013)PROPOSING A NEW METHODOLOGY BASED ON FUZZY LOGIC FOR TUNNELLING RISK ASSESSMENT (2014)Risk management of hydropower projects for sustainable development: a review (2020)Decision Making for Leaders: The Analytical Hierarchy Process for Decisions in a Complex World (1982)Fuzzy hierarchical analysis (1985)Decision support systems and intelligent systems (1997)Improved fuzzy AHP based game-theoretic model for shipyard selection (2021)Probability Concepts in Engineering Planning and Design (1975)Probabilistic assessment of tunnel construction performance based on data (2013)Bayesian Analytics for Estimating Risk Probability in PPP Waste-to-Energy Projects (2018)Applications of Bayesian approaches in construction management research: a systematic review (2021)Guidelines for tunnelling risk management: International Tunnelling Association, Working Group No. 2 (2004)Fuzzy comprehensive Bayesian network-based safety risk assessment for metro construction projects (2017)Multi-classifier information fusion in risk analysis (2020)Fuzzy Bayesian network based on an improved similarity aggregation method for risk assessment of storage tank accident (2021)Probability, statistics, and decision for civil engineers (1970)Structural Reliability Theory and Its Applications (1982)Cost Overruns in Tunnelling Projects: Investigating the Impact of Geological and Geotechnical Uncertainty Using Case Studies (2020)A comparative study of causes of time overruns in Hong Kong construction projects (1997)Underestimating Costs in Public Works Projects: Error or Lie? (2002)Megaprojects and Risk (2003)From Nobel Prize to Project Management: Getting Risks Right (2006)Curbing Optimism Bias and Strategic Misrepresentation in Planning: Reference Class Forecasting in Practice (2007)Some stylized facts about high-speed rail: A review of HSR experiences around the world (2009)Planning level tunnel cost estimation based on statistical analysis of historical data (2012)Using Simulation to Plan Tunnel Construction (2012)Construction Cost and Duration Uncertainty Model: Application to High-Speed Rail Line Project (2016)
this work references cited by second hop

References

  • 2004What Causes Cost Overrun in Transport Infrastructure Projects?649 cited
  • 2008Quantitative risk evaluation based on event tree analysis technique: Application to the design of shield TBM176 cited
  • 2012Risk evaluation of tunneling projects128 cited
  • 2006Bayesian Updating Application into Simulation in the North Edmonton Sanitary Trunk Tunnel Project80 cited
  • 2002Updating the Decision Aids for Tunneling69 cited
  • 2005Model for Estimation of Time and Cost for Tunnel Projects Based on Risk Evaluation52 cited
  • 2010Design a new intelligence expert decision making using game theory and fuzzy AHP to risk management in design, construction, and operation of tunnel projects (case studies: Resalat tunnel)43 cited
  • 2007Simulation modeling techniques for underground infrastructure construction processes40 cited