A resource investment problem based on project splitting with time windows for aircraft moving assembly line
16 references·1 citing·25 second hopsampled
A resource investment problem based on project splitting with time windows for aircraft moving assembly line (2019)A resource investment problem based on pr…Multi-mode resource-constrained project scheduling problem with alternative project structures (2018)Multi-mode resource-constrain…Combining Monte-Carlo and hyper-heuristic methods for the multi-mode resource-constrained multi-project scheduling problem (2016)Combining Monte-Carlo and hyp…Multi-mode resource-constrained project scheduling problems with non-preemptive activity splitting (2014)Multi-mode resource-constrain…Resource-constrained multi-project scheduling: Priority rule performance revisited (2010)Resource-constrained multi-pr…A heuristic solution framework for the resource constrained (multi-)project scheduling problem with sequence-dependent transfer times (2008)A heuristic solution framewor…A genetic algorithm for the resource constrained multi-project scheduling problem (2007)A genetic algorithm for the r…Priority rule-based heuristic for multi-mode resource-constrained project scheduling problems with resource vacations and activity splitting (2006)Priority rule-based heuristic…A genetic algorithm for resource investment project scheduling problem, tardiness permitted with penalty (2006)A genetic algorithm for resou…Properties of multi-mode resource-constrained project scheduling problems with resource vacations and activity splitting (2005)Properties of multi-mode reso…Hybrid genetic algorithm with adaptive abilities for resource-constrained multiple project scheduling (2005)Hybrid genetic algorithm with…Scatter search for project scheduling with resource availability cost (2004)Scatter search for project sc…Optimization guided lower and upper bounds for the resource investment problem (2001)Optimization guided lower and…Resource-constrained project scheduling: Notation, classification, models, and methods (1999)Resource-constrained project …Project Scheduling under Limited Resources (1999)Project Scheduling under Limi…Resource-constrained project scheduling: A survey of recent developments (1998)Resource-constrained project …Minimizing Costs of Resource Requirements in Project Networks Subject to a Fixed Completion Time (1984)Minimizing Costs of Resource …An updated survey of variants and extensions of the resource-constrained project scheduling problem (2021)An updated survey of variants…Multiproject Scheduling with Limited Resources: A Zero-One Programming Approach (1969)Characterization and Generation of a General Class of Resource-Constrained Project Scheduling Problems (1995)PSPLIB - A project scheduling problem library (1997)Ant colony optimization for resource-constrained project scheduling (2002)Critical-Path Planning and Scheduling: Mathematical Basis (1961)On Uncertainty, Ambiguity, and Complexity in Project Management (2002)Experimental investigation of heuristics for resource-constrained project scheduling: An update (2005)A multi-agent system for decentralized multi-project scheduling with resource transfers (2013)Resource-constrained multi-project scheduling problem: A survey (2022)Multi-Project Scheduling: Categorization of Heuristic Rules Performance (1982)A multicriteria heuristic method to improve resource allocation in multiproject scheduling (2000)Artificial intelligence in renewable energy: A comprehensive bibliometric analysis (2022)A survey of variants and extensions of the resource-constrained project scheduling problem (2009)Resource-constrained project scheduling problem: review of past and recent developments (2018)Project management with CPM and PERT (1965)Intransitive Indifference in Preference Theory: A Survey (1970)Activity networks: Project planning and control by network models (1977)An integrated survey of deterministic project scheduling (2001)Project scheduling under uncertainty: Survey and research potentials (2004)On the use of genetic programming to evolve priority rules for resource constrained project scheduling problems (2017)Robust optimization models for project scheduling with resource availability cost (2006)Solving the resource availability cost problem in project scheduling by path relinking and genetic algorithm (2007)A new tabu search-based hyper-heuristic algorithm for solving construction leveling problems with limited resource availabilities (2013)A classification and new benchmark instances for the multi-skilled resource-constrained project scheduling problem (2022)Extensions of the resource-constrained project scheduling problem (2023)
this work references cited by second hop· second hop is a sample of the most-cited connections

References

  • 1999Resource-constrained project scheduling: Notation, classification, models, and methods1,501 cited
  • 1998Resource-constrained project scheduling: A survey of recent developments562 cited
  • 2007A genetic algorithm for the resource constrained multi-project scheduling problem341 cited
  • 2010Resource-constrained multi-project scheduling: Priority rule performance revisited263 cited
  • 1984Minimizing Costs of Resource Requirements in Project Networks Subject to a Fixed Completion Time204 cited
  • 2006A genetic algorithm for resource investment project scheduling problem, tardiness permitted with penalty124 cited
  • 2008A heuristic solution framework for the resource constrained (multi-)project scheduling problem with sequence-dependent transfer times120 cited
  • 2016Combining Monte-Carlo and hyper-heuristic methods for the multi-mode resource-constrained multi-project scheduling problem113 cited
  • 2001Optimization guided lower and upper bounds for the resource investment problem110 cited
  • 2005Hybrid genetic algorithm with adaptive abilities for resource-constrained multiple project scheduling108 cited
  • 2005Properties of multi-mode resource-constrained project scheduling problems with resource vacations and activity splitting96 cited
  • 2014Multi-mode resource-constrained project scheduling problems with non-preemptive activity splitting96 cited
  • 2004Scatter search for project scheduling with resource availability cost

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work

94 cited
  • 2006Priority rule-based heuristic for multi-mode resource-constrained project scheduling problems with resource vacations and activity splitting91 cited
  • 2018Multi-mode resource-constrained project scheduling problem with alternative project structures77 cited
  • 1999Project Scheduling under Limited Resources77 cited
  • Cited by

    • 2021An updated survey of variants and extensions of the resource-constrained project scheduling problem367 cited