SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
Combining Monte Carlo Simulation and Bayesian Networks Methods for Assessing Completion Time of Projects under Risk
16 references·0 citing·49 second hopsampled
Combining Monte Carlo Simulation and Bayesian Networks Methods for Assessing Completion Time of Projects under Risk (2019)Combining Monte Carlo Simulation and Baye…Risk analysis of emergent water pollution accidents based on a Bayesian Network (2015)Risk analysis of emergent wat…Developing a risk assessment method for complex pipe jacking construction projects (2015)Developing a risk assessment …A method for the evaluation of risk in IT projects (2015)A method for the evaluation o…Project cost risk analysis: A Bayesian networks approach for modeling dependencies between cost items (2014)Project cost risk analysis: A…Bayesian-network-based safety risk analysis in construction projects (2014)Bayesian-network-based safety…A new approach for quantitative risk analysis (2013)A new approach for quantitati…Using fuzzy multiple criteria decision making approach to enhance risk assessment for metropolitan construction projects (2012)Using fuzzy multiple criteria…Risk assessment for enterprise resource planning (ERP) system implementations: a fault tree analysis approach (2012)Risk assessment for enterpris…Risk and uncertainty in development (2012)Risk and uncertainty in devel…Risk assessment of construction projects (2010)Risk assessment of constructi…Fuzzy Monte Carlo Simulation and Risk Assessment in Construction (2009)Fuzzy Monte Carlo Simulation …Assessing new product development project risk by Bayesian network with a systematic probability generation methodology (2009)Assessing new product develop…Quantifying schedule risk in construction projects using Bayesian belief networks (2008)Quantifying schedule risk in …Using fuzzy risk assessment to rate cost overrun risk in international construction projects (2007)Using fuzzy risk assessment t…Application of a fuzzy based decision making methodology to construction project risk assessment (2007)Application of a fuzzy based …Assessing risk in ERP projects: identify and prioritize the factors (2004)Assessing risk in ERP project…Multiple Attribute Decision Making (1981)Multiple Attribute Decision Making: Methods and Applications (1981)Compromise solution by MCDM methods: A comparative analysis of VIKOR and TOPSIS (2003)Flexible contracts to cope with uncertainty in public–private partnerships (2012)A modified TOPSIS with a different ranking index (2016)A systematic review and meta-Analysis of SWARA and WASPAS methods: Theory and applications with recent fuzzy developments (2017)A scaling method for priorities in hierarchical structures (1977)The Analytic Hierarchy Process (1985)Current research trends and application areas of fuzzy and hybrid methods to the risk assessment of construction projects (2017)A review of occupational health and safety risk assessment approaches based on multi-criteria decision-making methods and their fuzzy versions (2018)A review of artificial intelligence based risk assessment methods for capturing complexity-risk interdependencies (2019)Fuzzy sets (1965)Fuzzy sets (1996)Modelling global risk factors affecting construction cost performance (2003)Risk assessment model selection in construction industry (2010)Towards a better modelling and assessment of construction risk: Insights from a literature review (2013)Energy investment risk assessment for nations along China’s Belt & Road Initiative (2017)Decision making for leaders (1985)Putting the enterprise into the enterprise system. (1998)The critical success factors for ERP implementation: an organizational fit perspective (2002)An application of data envelopment analytic hierarchy process for supplier selection: a case study of BEKO in Turkey (2006)A review of applications of Analytic Hierarchy Process in operations management (2012)ERP system implementation in large enterprises – a systematic literature review (2017)A comparative study of causes of time overruns in Hong Kong construction projects (1997)Causes of construction delay: traditional contracts (2002)Causes of delay in large construction projects (2006)Ranking of delay factors in construction projects after Egyptian revolution (2013)The top 10 universal delay factors in construction projects (2018)Towards integrating construction risk management and stakeholder management: A systematic literature review and future research agendas (2018)A fuzzy extension of Saaty's priority theory (1983)Fuzzy hierarchical analysis (1985)Applications of the extent analysis method on fuzzy AHP (1996)Fuzzy analytic hierarchy process with interval type-2 fuzzy sets (2014)Fuzzy Multicriteria Decision-Making: A Literature Review (2015)A novel spherical fuzzy analytic hierarchy process and its renewable energy application (2019)Do Data Characteristics Change According to the Number of Scale Points Used? An Experiment Using 5-Point, 7-Point and 10-Point Scales (2008)Improved Fuzzy Bayesian Network-Based Risk Analysis With Interval-Valued Fuzzy Sets and D–S Evidence Theory (2019)Predicting supply chain risks using machine learning: The trade-off between performance and interpretability (2019)Application of Machine Learning in Supply Chain Management: A Comprehensive Overview of the Main Areas (2021)Risk Analysis: A Quantitative Guide (2000)Causes of delay and cost overruns in construction of groundwater projects in a developing countries; Ghana as a case study (2003)A guide to the project management body of knowledge (PMBOK guide) (2004)A Bayesian network framework for project cost, benefit and risk analysis with an agricultural development case study (2016)Project risk management: A deterministic quantitative technique for assessment and mitigation (2017)Decision making with dependence and feedback : the analytic network process (1996)A case-based reasoning approach to cost estimation of new product development (2017)Design concept evaluation using soft sets based on acceptable and satisfactory levels: an integrated TOPSIS and Shannon entropy (2019)Regularization Neural Network for Construction Cost Estimation (1998)A Hybrid MCDM Technique for Risk Management in Construction Projects (2018)
this work references cited by second hop· second hop is a sample of the most-cited connections

References

  • 2007Application of a fuzzy based decision making methodology to construction project risk assessment537 cited
  • 2010Risk assessment of construction projects454 cited
  • 2007Using fuzzy risk assessment to rate cost overrun risk in international construction projects374 cited
  • 2014Bayesian-network-based safety risk analysis in construction projects298 cited
  • 2004Assessing risk in ERP projects: identify and prioritize the factors285 cited
  • 2008Quantifying schedule risk in construction projects using Bayesian belief networks265 cited
  • 2009Fuzzy Monte Carlo Simulation and Risk Assessment in Construction204 cited
  • 2012Using fuzzy multiple criteria decision making approach to enhance risk assessment for metropolitan construction projects199 cited
  • 2009Assessing new product development project risk by Bayesian network with a systematic probability generation methodology185 cited
  • 2014Project cost risk analysis: A Bayesian networks approach for modeling dependencies between cost items164 cited
  • 2015Developing a risk assessment method for complex pipe jacking construction projects87 cited
  • 2012Risk and uncertainty in development81 cited
  • 2015Risk analysis of emergent water pollution accidents based on a Bayesian Network65 cited
  • 2015A method for the evaluation of risk in IT projects

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work

62 cited
  • 2013A new approach for quantitative risk analysis51 cited
  • 2012Risk assessment for enterprise resource planning (ERP) system implementations: a fault tree analysis approach48 cited
  • Cited by

    No citing works inside the corpus for this window.