SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
LOOKAHEAD PLANNING: THE MISSING LINK IN PRODUCTION CONTROL
0 references·16 citing·42 second hop
LOOKAHEAD PLANNING: THE MISSING LINK IN PRODUCTION CONTROL (1997)LOOKAHEAD PLANNING: THE MISSING LINK IN P…Adaptive control of resource flow to optimize construction work and cash flow via online deep reinforcement learning (2023)Adaptive control of resource …Survey Comparing Critical Path Method, Last Planner System, and Location-Based Techniques (2019)Survey Comparing Critical Pat…Identifying and Managing Critical Waste Factors for Lean Construction Projects (2019)Identifying and Managing Crit…Creating social value within the delivery of construction projects: the role of lean approach (2019)Creating social value within …The relationship between the last planner® system and collaborative planning practice in UK construction (2017)The relationship between the …Understanding the theory behind the Last Planner System using the Language-Action Perspective: two case studies (2016)Understanding the theory behi…How can ‘tasks made ready’ during lookahead planning impact reliable workflow and project duration? (2015)How can ‘tasks made ready’ du…A survey on production planning system in construction projects based on Last Planner System (2015)A survey on production planni…Understanding the role of “tasks anticipated” in lookahead planning through simulation (2014)Understanding the role of “ta…Is the Last Planner System applicable to design? A case study (2009)Is the Last Planner System ap…Improving construction workflow- The role of production planning and control (2009)Improving construction workfl…Evaluation of the Impact of the Last Planner System on the Performance of Construction Projects (2009)Evaluation of the Impact of t…Investigating the relationship between planning reliability and project performance (2008)Investigating the relationshi…Improving Labor Productivity Through Production Control (2008)Improving Labor Productivity …Improving construction work flow–The connective role of look ahead planning (2008)Improving construction work f…Logistics Centers to Support Project-Based Production in the Construction Industry (2007)Logistics Centers to Support …Simulation Modeling and Analysis. (1983)Project management : a systems approach to planning, scheduling, and controlling (1995)Research Design: Qualitative, Quantitative, and Mixed Methods Approaches (2009)Advanced Metrics for Construction Planning (2019)The Population Ecology of Organizations (1977)Case Study Research: Design and Methods (1984)The machine that changed the world (1992)Effects of the Last Planner System on Social Networks among Construction Trade Crews (2015)Case Study Research: Design and Methods (1991)Lean Thinking—Banish Waste and Create Wealth in your Corporation (1997)Project team resilience: The effect of group potency and interpersonal trust (2021)Shielding Production: Essential Step in Production Control (1998)An exploration towards a production theory and its application to construction (2000)THE LAST PLANNER SYSTEM OF PRODUCTION CONTROL (2000)Empirical Research on the Success of Production Control in Building Construction Projects (2009)Factors Affecting Labor Productivity in the Construction Industry (2020)The Toyota way : 14 management principles from the world's greatest manufacturer (2004)Lean management methods for complex projects (2012)Organizations in Action (2017)The Use of Knowledge in Society (1996)Qualitative Data Analysis (2008)Holistic Study and Analysis of Factors Affecting Collaborative Planning in Construction (2021)Implementation of continuous improvement cells: a case study from the civil infrastructure sector in the UK (2021)An Introduction to Qualitative Research (2023)Coefficient Alpha and the Internal Structure of Tests (1951)A Second Generation Little Jiffy (1970)International Journal of Business and Social Science (2018)"Low-Income Housing Backlogs and Deficits “Blues” in South Africa. What Solutions Can a Lean Construction Approach Proffer? " (2019)Inefficiencies in the delivery of low-income housing in South Africa: is governance the missing link? A review of literature (2022)Qualitative evaluation and research methods (1990)Survey research in operations management: a process‐based perspective (2002)A guide to the project management body of knowledge (PMBOK guide) (2004)Utilizing Large Language Models to Illustrate Constraints for Construction Planning (2024)Building operations management theory through case and field research (1998)SOCIAL NETWORK ANALYSIS OF INFORMATION FLOW IN AN IPD-PROJECT DESIGN ORGANIZATION (2013)Design Management in the Building Process - A Review of Current Literature (2015)Success Factors and Barriers of Last Planner System Implementation in the Gaza Strip Construction Industry (2018)Management of production in construction: A theoretical view (1999)Resource-constrained project scheduling: Notation, classification, models, and methods (1999)Causes of delays on construction projects: a comprehensive list (2019)Automated construction scheduling using deep reinforcement learning with valid action sampling (2024)Leveraging Artificial Intelligence in Project Management: A Systematic Review of Applications, Challenges, and Future Directions (2025)
this work references cited by second hop

References

No references inside the corpus for this window.

Cited by

  • 2008Investigating the relationship between planning reliability and project performance105 cited
  • 2008Improving construction work flow–The connective role of look ahead planning99 cited
  • 2009Improving construction workflow- The role of production planning and control79 cited
  • 2015How can ‘tasks made ready’ during lookahead planning impact reliable workflow and project duration?78 cited
  • 2019Identifying and Managing Critical Waste Factors for Lean Construction Projects76 cited
  • 2009Is the Last Planner System applicable to design? A case study73 cited
  • 2017The relationship between the last planner® system and collaborative planning practice in UK construction70 cited
  • 2019Survey Comparing Critical Path Method, Last Planner System, and Location-Based Techniques68 cited
  • 2008Improving Labor Productivity Through Production Control56 cited
  • 2023Adaptive control of resource flow to optimize construction work and cash flow via online deep reinforcement learning54 cited
  • 2015A survey on production planning system in construction projects based on Last Planner System54 cited
  • 2007Logistics Centers to Support Project-Based Production in the Construction Industry52 cited
  • 2019Creating social value within the delivery of construction projects: the role of lean approach52 cited

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work

  • 2014Understanding the role of “tasks anticipated” in lookahead planning through simulation47 cited
  • 2009Evaluation of the Impact of the Last Planner System on the Performance of Construction Projects38 cited
  • 2016Understanding the theory behind the Last Planner System using the Language-Action Perspective: two case studies36 cited