SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
Construction Management
2 references·16 citing·47 second hop
Construction Management (1997)Construction ManagementModern Construction Management (2013)Modern Construction ManagementModern Construction Management (2012)Modern Construction ManagementBoard Structure and Directors’ Role in Preventing Corporate Misconduct in the Construction Industry (2017)Board Structure and Directors…Resource scheduling and planning for tunneling with a new resource model of the Decision Aids for Tunneling (DAT) (2015)Resource scheduling and plann…Two-Stage Scheduling Model for Resource Leveling of Linear Projects (2014)Two-Stage Scheduling Model fo…Schedule control model for linear projects based on linear scheduling method and constraint programming (2013)Schedule control model for li…Web-based concession period analysis system (2011)Web-based concession period a…Optimizing Cash Flows for Linear Schedules Modeled with Singularity Functions by Simulated Annealing (2010)Optimizing Cash Flows for Lin…Construction cost analysis under uncertainty with correlated cost risk analysis model (2010)Construction cost analysis un…Managing Construction Projects Using the Advanced Programmatic Risk Analysis and Management Model (2009)Managing Construction Project…Float Types in Linear Schedule Analysis with Singularity Functions (2009)Float Types in Linear Schedul…Exploring the Potential of SME Alliances in the Construction Sector (2009)Exploring the Potential of SM…Materials Handling System Simulation in Precast Viaduct Construction: Modeling, Analysis, and Implementation (2008)Materials Handling System Sim…Critical Path Scheduling under Resource Calendar Constraints (2007)Critical Path Scheduling unde…Organisational culture profiles of construction enterprises in China (2006)Organisational culture profil…Predicting completed project cost using bidding data (2002)Predicting completed project …UK and US construction management contracting procedures and practices: a comparative study (2001)UK and US construction manage…Team-Building in Construction (2000)Team-Building in ConstructionPricing Construction Risk: Fuzzy Set Application (1993)Project Management for Engineering and Construction (1993)Risk Management and Construction (1993)Spotlight on construction cost overrun research: superficial, replicative and stagnated. (2015)A system dynamics approach to conceptualise causes of cost overrun of construction projects in developing countries (2020)Improving the Results of the Earned Value Management Technique Using Artificial Neural Networks in Construction Projects (2020)Leadership Is an Art (1987)Principle-Centered Leadership (1989)Incorporating Employee Resourcing Requirements into Deployment Decision Making (2009)Impact of Employee Empowerment on Job Satisfaction: An Empirical Analysis of Pakistani Service Industry (2010)Managing in a Time of Great Change (2012)Dimensions for improvement of construction management practice in Ethiopian construction industry (2019)Project management: A systems approach to planning, scheduling and controlling (1982)Project management : a systems approach to planning, scheduling, and controlling (1995)Key performance indicators for measuring construction success (2004)Cognitive Psychological Approach for Risk Assessment in Construction Projects (2015)Modification of Advanced Programmatic Risk Analysis and Management Model for the Whole Project Life Cycle’s Risks (2015)From project risk to complexity analysis: a systematic classification (2018)Studying Information Technology in Organizations: Research Approaches and Assumptions (1991)What Makes Teams Work: Group Effectiveness Research from the Shop Floor to the Executive Suite (1997)Communication and Trust in Global Virtual Teams (1999)Theory to practice: A typology of supply chain management in construction (2014)Firm size implications for environmental sustainability of supply chains: evidence from the UAE (2020)Interenterprise Collaboration Network in International Construction Projects: Evidence from Chinese Construction Enterprises (2021)Scheduling Projects with Repeating Activities (1998)Optimization of Resource Allocation and Leveling Using Genetic Algorithms (1999)Experimental investigation of heuristics for resource-constrained project scheduling: An update (2005)Survey of quantitative methods in construction (2017)Resource Leveling Based on Line of Balance and Constraint Programming (2018)Schedule optimization for scattered repetitive projects (2021)Applied systems analysis (1990)Approximately predicting the cost and duration of school reconstruction projects in Taiwan (2006)Statistical Analysis on the Cost and Duration of Public Building Projects (2010)Artificial Neural Networks for Construction Management: A Review (2017)Inequity In Social Exchange (1965)Cultures and Organizations: Software of the Mind. (1993)Organizational culture and leadership (1993)Construction management research at the individual level of analysis: current status, gaps and future directions (2012)The impact of organizational culture on international bidding decisions: Malaysia context (2014)Exploring the relationships of the culture of competitiveness and knowledge development to sustainable supply chain management and organizational performance (2019)Contributors to construction delays (1998)Which contractor selection methodology? (1998)Governmental role in BOT-led infrastructure development (2001)Project understanding, planning, flexibility of management action and construction time performance: two Australian case studies (2002)‘It’s good to be angry’: Enacting anger in construction project management to achieve perceived leader effectiveness (2010)A Critical Examination of the Relationship between Emotional Intelligence and Transformational Leadership (2010)A Parallel Branch and Bound Algorithm for the Resource Leveling Problem with Minimal Lags (2016)
this work references cited by second hop

References

  • 2012Modern Construction Management314 cited
  • 2013Modern Construction Management156 cited

Cited by

  • 2009Exploring the Potential of SME Alliances in the Construction Sector65 cited
  • 2013Schedule control model for linear projects based on linear scheduling method and constraint programming60 cited
  • 2006Organisational culture profiles of construction enterprises in China60 cited
  • 2002Predicting completed project cost using bidding data55 cited
  • 2010Construction cost analysis under uncertainty with correlated cost risk analysis model51 cited
  • 2009Managing Construction Projects Using the Advanced Programmatic Risk Analysis and Management Model48 cited
  • 2014Two-Stage Scheduling Model for Resource Leveling of Linear Projects44 cited
  • 2000Team-Building in Construction41 cited
  • 2007Critical Path Scheduling under Resource Calendar Constraints38 cited
  • 2009Float Types in Linear Schedule Analysis with Singularity Functions35 cited
  • 2010Optimizing Cash Flows for Linear Schedules Modeled with Singularity Functions by Simulated Annealing35 cited
  • 2008Materials Handling System Simulation in Precast Viaduct Construction: Modeling, Analysis, and Implementation34 cited

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work

2015
Resource scheduling and planning for tunneling with a new resource model of the Decision Aids for Tunneling (DAT)
31 cited
  • 2001UK and US construction management contracting procedures and practices: a comparative study28 cited
  • 2011Web-based concession period analysis system24 cited
  • 2017Board Structure and Directors’ Role in Preventing Corporate Misconduct in the Construction Industry23 cited