Rethinking the Construction Schedule Risk of Infrastructure Projects Based on Dialectical Systems and Network Theory
16 references·0 citing·24 second hop
Rethinking the Construction Schedule Risk of Infrastructure Projects Based on Dialectical Systems and Network Theory (2020)Rethinking the Construction Schedule Risk…Managing public–private megaprojects: Paradoxes, complexity, and project design (2007)Managing public–private megap…Delays in construction projects: The case of Jordan (2007)Delays in construction projec…Causes and effects of delays in Malaysian construction industry (2007)Causes and effects of delays …Causes of delay in large construction projects (2006)Causes of delay in large cons…How (In)accurate Are Demand Forecasts in Public Works Projects?: The Case of Transportation (2005)How (In)accurate Are Demand F…A study on project success factors in large construction projects in Vietnam (2004)A study on project success fa…Social Research Methods (2003)Social Research MethodsCauses of delay and cost overruns in construction of groundwater projects in a developing countries; Ghana as a case study (2003)Causes of delay and cost over…Causes of construction delay: traditional contracts (2002)Causes of construction delay:…Use and benefits of tools for project risk management (2001)Use and benefits of tools for…Construction delay: a quantitative analysis (2000)Construction delay: a quantit…An analysis of success factors and benefits of partnering in construction (2000)An analysis of success factor…A comparative study of causes of time overruns in Hong Kong construction projects (1997)A comparative study of causes…The concept of project complexity—a review (1996)The concept of project comple…Questionnaire design, interviewing and attitude measurement (1994)Questionnaire design, intervi…A New Status Index Derived from Sociometric Analysis (1953)A New Status Index Derived fr…Prospect Theory: An Analysis of Decision under Risk (1979)Heuristics and Biases (2002)Megaprojects and Risk (2003)From Nobel Prize to Project Management: Getting Risks Right (2006)Survival of the unfittest: why the worst infrastructure gets built--and what we can do about it (2009)Should we build more large dams? The actual costs of hydropower megaproject development (2014)Research methods for business: A skill building approach (1993)Delay and cost overruns in Vietnam large construction projects: A comparison with other selected countries (2008)Analysing factors affecting delays in Indian construction projects (2011)Significant factors causing delay in the UAE construction industry (2006)Factoring and weighting approaches to status scores and clique identification (1972)A computational model of trust and reputation (2003)Dynamics of Dyads in Social Networks: Assortative, Relational, and Proximity Mechanisms (2010)The significant factors causing delay of building construction projects in Malaysia (2007)Cost and time control of construction projects: inhibiting factors and mitigating measures in practice (2010)The effect of relationship management on project performance in construction (2011)Criteria of project success: an exploratory re-examination (1999)Factors Affecting the Success of a Construction Project (2004)The need for new paradigms for complex projects (1999)Grasping project complexity in large engineering projects: The TOE (Technical, Organizational and Environmental) framework (2010)Now, let's make it really complex (complicated) (2011)Integrating quantitative and qualitative research: how is it done? (2006)Mixing methods in a qualitatively driven way (2006)Doing Mixed Methods Research Pragmatically: Implications for the Rediscovery of Pragmatism as a Research Paradigm (2009)
this work references cited by second hop

References

  • 1953A New Status Index Derived from Sociometric Analysis3,877 cited
  • 2003Social Research Methods2,543 cited
  • 2006Causes of delay in large construction projects1,721 cited
  • 2007Causes and effects of delays in Malaysian construction industry1,428 cited
  • 1996The concept of project complexity—a review1,198 cited
  • 1997A comparative study of causes of time overruns in Hong Kong construction projects831 cited
  • 2002Causes of construction delay: traditional contracts819 cited
  • 2003Causes of delay and cost overruns in construction of groundwater projects in a developing countries; Ghana as a case study799 cited
  • 2005How (In)accurate Are Demand Forecasts in Public Works Projects?: The Case of Transportation731 cited
  • 2000Construction delay: a quantitative analysis555 cited
  • 2007Delays in construction projects: The case of Jordan539 cited
  • 2007Managing public–private megaprojects: Paradoxes, complexity, and project design519 cited
  • 2000An analysis of success factors and benefits of partnering in construction505 cited
  • 1994Questionnaire design, interviewing and attitude measurement483 cited
  • 2004A study on project success factors in large construction projects in Vietnam

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work

415 cited
  • 2001Use and benefits of tools for project risk management405 cited
  • Cited by

    No citing works inside the corpus for this window.