Exploring the Causes of Delays in Construction Industry Using a Cause-and-Effect Diagram: Case Study for Iran
16 references·5 citing·23 second hop
Exploring the Causes of Delays in Construction Industry Using a Cause-and-Effect Diagram: Case Study for Iran (2020)Exploring the Causes of Delays in Constru…Causes of delays on construction projects: a comprehensive list (2019)Causes of delays on construct…Structural Equation Model of the Factors Affecting Construction Labor Productivity (2018)Structural Equation Model of …Risk Paths in International Construction Projects: Case Study from Chinese Contractors (2016)Risk Paths in International C…Social procurement in UK construction projects (2015)Social procurement in UK cons…Implementation of lean construction techniques for minimizing the risks effect on project construction time (2013)Implementation of lean constr…Quantification of Delay Factors Using the Relative Importance Index Method for Construction Projects in Turkey (2012)Quantification of Delay Facto…Delay causes in Iran gas pipeline projects (2012)Delay causes in Iran gas pipe…Analysing factors affecting delays in Indian construction projects (2011)Analysing factors affecting d…Causes and effects of delays in Malaysian construction industry (2007)Causes and effects of delays …Causes of delay in large construction projects (2006)Causes of delay in large cons…Robust estimation of Cronbach's alpha (2005)Robust estimation of Cronbach…Causes of delay and cost overruns in construction of groundwater projects in a developing countries; Ghana as a case study (2003)Causes of delay and cost over…Causes of construction delay: traditional contracts (2002)Causes of construction delay:…Construction delay: a quantitative analysis (2000)Construction delay: a quantit…A comparative study of causes of time overruns in Hong Kong construction projects (1997)A comparative study of causes…Construction delays in a fast-growing economy: Comparing Thailand with other economies (1996)Construction delays in a fast…Using extreme gradient boosting (XGBoost) machine learning to predict construction cost overruns (2023)Using extreme gradient boosti…Statistical Analysis of Delay-Causing Factors in Indian Highway Construction Projects under Hybrid Annuity Model (2023)Statistical Analysis of Delay…Development of delay mitigation measures in construction projects: a combined interpretative structural modeling and MICMAC analysis approach (2023)Development of delay mitigati…Impact of Construction Delay-Controlling Parameters on Project Schedule: DEMATEL-System Dynamics Modeling Approach (2022)Impact of Construction Delay-…Risk analysis of gas leakage in gas pressure reduction station and its consequences: A case study for Zahedan (2021)Risk analysis of gas leakage …The Theory of the Estimation of Test Reliability (1937)Coefficient Alpha and the Internal Structure of Tests (1951)Estimating the reliability of continuous measures with cronbach's alpha or the intraclass correlation coefficient: Toward the integration of two traditions (1991)A simulation approach on Cronbach's alpha statistical significance (2006)Robust Coefficients Alpha and Omega and Confidence Intervals With Outlying Observations and Missing Data (2015)The role of capabilities in shaping sustainable supply chain flexibility and enhancing circular economy-target performance: an empirical study (2021)An Index of Factorial Simplicity (1974)Cost Overruns and Failure in Project Management: Understanding the Roles of Key Stakeholders in Construction Projects (2012)Factors Affecting Schedule Delay, Cost Overrun, and Quality Level in Public Construction Projects (2015)Exploring delay causes of road construction projects in Egypt (2016)Research methods for business: A skill building approach (1993)Delay and cost overruns in Vietnam large construction projects: A comparison with other selected countries (2008)Large construction projects in developing countries: a case study from Vietnam (2004)Construction Delays and Their Causative Factors in Nigeria (2006)Taxonomy for change causes and effects in construction projects (2008)Significant factors causing delay in the UAE construction industry (2006)Delays in construction projects: The case of Jordan (2007)The significant factors causing delay of building construction projects in Malaysia (2007)Cost and time control of construction projects: inhibiting factors and mitigating measures in practice (2010)The effect of relationship management on project performance in construction (2011)Criteria of project success: an exploratory re-examination (1999)Factors Affecting the Success of a Construction Project (2004)Ranking of delay factors in construction projects after Egyptian revolution (2013)
this work references cited by second hop

References

  • 2006Causes of delay in large construction projects1,721 cited
  • 2007Causes and effects of delays in Malaysian construction industry1,428 cited
  • 1997A comparative study of causes of time overruns in Hong Kong construction projects831 cited
  • 2002Causes of construction delay: traditional contracts819 cited
  • 2003Causes of delay and cost overruns in construction of groundwater projects in a developing countries; Ghana as a case study799 cited
  • 2011Analysing factors affecting delays in Indian construction projects748 cited
  • 2000Construction delay: a quantitative analysis555 cited
  • 2012Quantification of Delay Factors Using the Relative Importance Index Method for Construction Projects in Turkey444 cited
  • 2005Robust estimation of Cronbach's alpha429 cited
  • 1996Construction delays in a fast-growing economy: Comparing Thailand with other economies390 cited
  • 2019Causes of delays on construction projects: a comprehensive list247 cited
  • 2016Risk Paths in International Construction Projects: Case Study from Chinese Contractors203 cited
  • 2012Delay causes in Iran gas pipeline projects192 cited
  • 2015Social procurement in UK construction projects161 cited
  • 2018Structural Equation Model of the Factors Affecting Construction Labor Productivity

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work

158 cited
  • 2013Implementation of lean construction techniques for minimizing the risks effect on project construction time149 cited
  • Cited by

    • 2022Impact of Construction Delay-Controlling Parameters on Project Schedule: DEMATEL-System Dynamics Modeling Approach46 cited
    • 2023Development of delay mitigation measures in construction projects: a combined interpretative structural modeling and MICMAC analysis approach43 cited
    • 2023Statistical Analysis of Delay-Causing Factors in Indian Highway Construction Projects under Hybrid Annuity Model42 cited
    • 2023Using extreme gradient boosting (XGBoost) machine learning to predict construction cost overruns41 cited
    • 2021Risk analysis of gas leakage in gas pressure reduction station and its consequences: A case study for Zahedan30 cited