Integrating Schedule Risk Analysis with Multi-Skilled Resource Scheduling to Improve Resource-Constrained Project Scheduling Problems
16 references·0 citing·52 second hop
Integrating Schedule Risk Analysis with Multi-Skilled Resource Scheduling to Improve Resource-Constrained Project Scheduling Problems (2021)Integrating Schedule Risk Analysis with M…Priority-based heuristics for the multi-skill resource constrained project scheduling problem (2016)Priority-based heuristics for…Solving stochastic resource-constrained project scheduling problems by closed-loop approximate dynamic programming (2015)Solving stochastic resource-c…Cost and Schedule Risk Analysis of Bridge Construction in Pakistan: Establishing Risk Guidelines (2014)Cost and Schedule Risk Analys…Optimizing linear project scheduling with multi-skilled crews (2012)Optimizing linear project sch…Augmented heuristic algorithm for multi-skilled resource scheduling (2011)Augmented heuristic algorithm…Time slack-based techniques for robust project scheduling subject to resource uncertainty (2010)Time slack-based techniques f…Resource‐Constrained Project Scheduling for Timely Project Completion with Stochastic Activity Durations (2009)Resource‐Constrained Project …Scheduling projects with multi-skilled personnel by a hybrid MILP/CP benders decomposition algorithm (2008)Scheduling projects with mult…Construction Project Network Evaluation with Correlated Schedule Risk Analysis Model (2007)Construction Project Network …Impact of Budget Uncertainty on Project Time-Cost Tradeoff (2005)Impact of Budget Uncertainty …Evaluating Risk in Construction–Schedule Model (ERIC–S): Construction Schedule Risk Model (2003)Evaluating Risk in Constructi…Assignment and Allocation Optimization of Partially Multiskilled Workforce (2002)Assignment and Allocation Opt…Defining Triangular Probability Distributions from Historical Cost Data (2000)Defining Triangular Probabili…Algorithm for Scheduling with Multiskilled Constrained Resources (2000)Algorithm for Scheduling with…Multiskilled Labor Utilization Strategies in Construction (1998)Multiskilled Labor Utilizatio…Risk analysis and management in construction (1997)Risk analysis and management …PSPLIB - A project scheduling problem library (1997)Resource-constrained project scheduling: Notation, classification, models, and methods (1999)Project Scheduling: A Research Handbook (2002)Multi-mode resource constrained project scheduling under resource disruptions (2016)Resource constrained project scheduling with uncertain activity durations (2017)A classification and review of approaches and methods for modeling uncertainty in projects (2019)Scheduling Projects with Repeating Activities (1998)Optimal Planning and Scheduling for Repetitive Construction Projects (2005)The Multimode Resource‐Constrained Project Scheduling Problem for Repetitive Activities in Construction Projects (2018)A new algorithm for resource-constrained project scheduling with breadth and depth of skills (2020)Multi-skilling in scheduling problems: A review on models, methods and applications (2020)Scheduling project networks with resource constraints and time windows (1988)Project scheduling : recent models, algorithms, and applications (1999)An improved MIP-based approach for a multi-skill workforce scheduling problem (2011)A knowledge-guided multi-objective fruit fly optimization algorithm for the multi-skill resource constrained project scheduling problem (2017)A genetic programming hyper-heuristic approach for the multi-skill resource constrained project scheduling problem (2019)Application of a Technique for Research and Development Program Evaluation (1959)Orthogonal Array-Based Latin Hypercubes (1993)New strategies for stochastic resource-constrained project scheduling (2017)Efficient priority rules for the stochastic resource-constrained project scheduling problem (2018)Trading financial indices with reinforcement learning agents (2018)The reflective practitioner: How professionals think in action (1984)The Reflective Practitioner: How Professionals Think in Action (1985)Project risk management in the Queensland engineering construction industry: a survey (2003)Towards a better modelling and assessment of construction risk: Insights from a literature review (2013)Impact of risk management on project performance: the importance of soft skills (2014)Reliability and Validity Assessment (1979)A comparative study of causes of time overruns in Hong Kong construction projects (1997)Reliability and Validity Assessment (2011)System Dynamics Approach for Investigating the Risk Effects on Schedule Delay in Infrastructure Projects (2016)Schedule risk analysis of infrastructure projects: A hybrid dynamic approach (2018)Study the delays and conflicts for construction projects and their mutual relationship: A review (2022)Redundant, Overlapping Organization: A Japanese Approach to Managing the Innovation Process (1990)ORGANIZATIONAL INTEGRATION AND PROCESS INNOVATION. (1992)Planning and analysis of construction operations (1992)Fundamental Principles of Workforce Management (2005)Modeling Construction Labor Productivity (1990)THE CONSTRUCTION INDUSTRY INSTITUTE (1990)Optimization of Resource Allocation and Leveling Using Genetic Algorithms (1999)A review of methods and algorithms for optimizing construction scheduling (2013)Engineering Approach Using ANN to Improve and Predict Construction Labor Productivity under Different Influences (2017)Causes of Quality Deviations in Design and Construction (1992)Critical Success Factors for Construction Projects (1992)Project management : a systems approach to planning, scheduling, and controlling (1995)Risk assessment of international construction projects using the analytic network process (2009)Managing project risk using combined analytic hierarchy process and risk map (2010)Bayesian network based decision support for predicting and mitigating delay risk in TBM tunnel projects (2021)Inventory management and production planning and scheduling (1999)The Sample Average Approximation Method for Stochastic Discrete Optimization (2002)New competitive results for the stochastic resource-constrained project scheduling problem: exploring the benefits of pre-processing (2009)Robust optimization for resource-constrained project scheduling with uncertain activity durations (2012)Operational Research: methods and applications (2023)
this work references cited by second hop

References

  • 1997Risk analysis and management in construction758 cited
  • 2008Scheduling projects with multi-skilled personnel by a hybrid MILP/CP benders decomposition algorithm173 cited
  • 2002Assignment and Allocation Optimization of Partially Multiskilled Workforce169 cited
  • 2014Cost and Schedule Risk Analysis of Bridge Construction in Pakistan: Establishing Risk Guidelines158 cited
  • 2003Evaluating Risk in Construction–Schedule Model (ERIC–S): Construction Schedule Risk Model149 cited
  • 2009Resource‐Constrained Project Scheduling for Timely Project Completion with Stochastic Activity Durations131 cited
  • 2010Time slack-based techniques for robust project scheduling subject to resource uncertainty124 cited
  • 2015Solving stochastic resource-constrained project scheduling problems by closed-loop approximate dynamic programming118 cited
  • 1998Multiskilled Labor Utilization Strategies in Construction109 cited
  • 2012Optimizing linear project scheduling with multi-skilled crews103 cited
  • 2007Construction Project Network Evaluation with Correlated Schedule Risk Analysis Model96 cited
  • 2000Defining Triangular Probability Distributions from Historical Cost Data93 cited
  • 2016Priority-based heuristics for the multi-skill resource constrained project scheduling problem90 cited
  • 2000Algorithm for Scheduling with Multiskilled Constrained Resources

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work

76 cited
  • 2011Augmented heuristic algorithm for multi-skilled resource scheduling64 cited
  • 2005Impact of Budget Uncertainty on Project Time-Cost Tradeoff52 cited