Monitoring of Time and Cost Variances of Schedule Using Simple Earned Value Method Indicators
12 references·0 citing·50 second hop
Monitoring of Time and Cost Variances of Schedule Using Simple Earned Value Method Indicators (2021)Monitoring of Time and Cost Variances of …Project Duration Forecasting Using Earned Duration Management with Exponential Smoothing Techniques (2016)Project Duration Forecasting …Time and Cost Performance of Design–Build Projects (2015)Time and Cost Performance of …Earned value project management: Improving the predictive power of planned value (2015)Earned value project manageme…Application of Earned Value Method to Progress Control of Construction Projects (2014)Application of Earned Value M…Combination of Growth Model and Earned Schedule to Forecast Project Cost at Completion (2013)Combination of Growth Model a…Cost Controlling Using Earned Value Analysis in Construction Industries (2012)Cost Controlling Using Earned…Project cash flow analysis in the presence of uncertainty in activity duration and cost (2011)Project cash flow analysis in…The Project Scheduling Game (PSG): Simulating Time/Cost Trade-Offs in Projects (2005)The Project Scheduling Game (…A comparison of different project duration forecasting methods using earned value metrics (2005)A comparison of different pro…Monitoring systems and their effectiveness for project cost control in construction (2002)Monitoring systems and their …Is the Earned-Value Method an Enemy of Work Flow? (2000)Is the Earned-Value Method an…Improving the performance of Earned Value Analysis as a construction project management tool (2000)Improving the performance of …A comparative study of causes of time overruns in Hong Kong construction projects (1997)Underestimating Costs in Public Works Projects: Error or Lie? (2002)Causes of delay in large construction projects (2006)Critical factors affecting cost performance: a case of Ethiopian public construction projects (2017)Impact of Design Risk on the Performance of Design-Build Projects (2017)Collaboration and Integration in Project-Based Supply Chains in the Construction Industry (2018)Case Study Research: Design and Methods (1984)Case study research: Design and methods (1986)A Guide to the project management body of knowledge (1996)Conditions of success for earned value analysis in projects (2017)Grey Earned Value Management: Theory and Applications (2019)Multiple Linear Regression Model for Improved Project Cost Forecasting (2022)Critical-path planning and scheduling (1959)Critical-Path Planning and Scheduling (1959)Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation (1996)Examining the Relationship between Organizational Learning Styles and Project Performance (2009)Monitoring project duration and cost in a construction project by applying statistical quality control charts (2012)Earned value‐based performance monitoring of facility construction projects (2013)Earned value in project management (2003)Earned Value Project Management Method and Extensions (2003)A simulation and evaluation of earned value metrics to forecast the project duration (2006)A review of analytical models, approaches and decision support tools in project monitoring and control (2014)Six decades of project management research: Thematic trends and future opportunities (2016)Fuzzy sets (1965)Fuzzy sets (1996)Project scheduling under uncertainty: Survey and research potentials (2004)Measuring Project Management Performance: Case of Construction Industry (2017)A classification and review of approaches and methods for modeling uncertainty in projects (2019)A knowledge-based expert system to assess power plant project cost overrun risks (2019)Project management in construction (2007)Construction Project Management: An Integrated Approach (2012)Methodology of Planning the Course of the Cumulative Cost Curve in Construction Projects (2020)The S-Curve as a Tool for Planning and Controlling of Construction Process—Case Study (2020)A New Product Growth for Model Consumer Durables (1969)A New Product Growth for Model Consumer Durables (2004)Estimation at Completion in Civil Engineering Projects: Review of Regression and Soft Computing Models (2021)A Machine Learning Study to Enhance Project Cost Forecasting (2022)A machine learning study to improve the reliability of project cost estimates (2023)A guide to the project management body of knowledge (PMBOK guide) (2004)Forecasting seasonals and trends by exponentially weighted moving averages (2004)Earned Schedule min-max: Two new EVM metrics for monitoring and controlling projects (2019)A centralised cost management system: exploiting EVM and ABC within IPD (2020)Explainable machine learning for project management control (2023)Critical-Path Planning and Scheduling: Mathematical Basis (1961)Resource-constrained project scheduling: Notation, classification, models, and methods (1999)Project Scheduling: A Research Handbook (2002)Project execution game (PEG): training towards managing unexpected events (2007)A Blended Learning Approach to Teaching Project Management: A Model for Active Participation and Involvement: Insights from Norway (2015)The hierarchy of public project governance frameworks (2018)Structural risk of diversified project financing of city investment company in China based on the best worst method (2019)
this work references cited by second hop

References

  • 2005A comparison of different project duration forecasting methods using earned value metrics343 cited
  • 2002Monitoring systems and their effectiveness for project cost control in construction134 cited
  • 2015Time and Cost Performance of Design–Build Projects121 cited
  • 2011Project cash flow analysis in the presence of uncertainty in activity duration and cost110 cited
  • 2015Earned value project management: Improving the predictive power of planned value106 cited
  • 2016Project Duration Forecasting Using Earned Duration Management with Exponential Smoothing Techniques63 cited
  • 2014Application of Earned Value Method to Progress Control of Construction Projects57 cited
  • 2013Combination of Growth Model and Earned Schedule to Forecast Project Cost at Completion52 cited
  • 2005The Project Scheduling Game (PSG): Simulating Time/Cost Trade-Offs in Projects52 cited
  • 2000Improving the performance of Earned Value Analysis as a construction project management tool49 cited
  • 2000Is the Earned-Value Method an Enemy of Work Flow?43 cited
  • 2012Cost Controlling Using Earned Value Analysis in Construction Industries37 cited