SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
material requirements planning
0 references·5 citing·16 second hop
material requirements planning (2000)material requirements planningMitigating forecast errors by lot-sizing rules in ERP-controlled manufacturing systems (2011)Mitigating forecast errors by…Models for evaluating the performance of serial and assembly MRP systems (1993)Models for evaluating the per…Using Vendor Capacity Planning In Supplier Evaluation (1988)Using Vendor Capacity Plannin…Purchase Quantity Discount Procedures and MRP (1983)Purchase Quantity Discount Pr…Performance of Lot-Sizing Rules In an MRP System With Different Operating Conditions (1980)Performance of Lot-Sizing Rul…MATERIAL REQUIREMENTS PLANNING UNDER UNCERTAINTY (1976)Aggregate Safety Stock Levels and Component Part Commonality (1982)Manufacturing Planning and Control Systems (1984)THE EFFECT AND COST OF FORECAST ERROR BIAS FOR MULTIPLE‐STAGE PRODUCTION‐INVENTORY SYSTEMS (1982)Production and inventory management (1983)A Technique for Order Placement and Sizing (1990)Interaction effects on MRP nervousness (1990)Dynamic Version of the Economic Lot Size Model (2004)Journal of Industrial Engineering (2017)Analysis of Inventory Systems. (1964)Decision Systems for Inventory Management and Production Planning (1979)Optimal Policies for a Multi-Echelon Inventory Problem (2004)Evaluating Alternative Quantity Discounts (1977)Production Planning and Inventory Control (1985)An Experimental Comparison of MRP Purchase Discount Methods (1991)Impact of the supplier certification program in US firms (1996)
this work references cited by second hop

References

No references inside the corpus for this window.

Cited by

  • 1980Performance of Lot-Sizing Rules In an MRP System With Different Operating Conditions21 cited
  • 2011Mitigating forecast errors by lot-sizing rules in ERP-controlled manufacturing systems15 cited
  • 1988Using Vendor Capacity Planning In Supplier Evaluation15 cited
  • 1983Purchase Quantity Discount Procedures and MRP15 cited
  • 1993Models for evaluating the performance of serial and assembly MRP systems14 cited

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work