Time-cost optimization in repetitive project scheduling with limited resources
16 references·0 citing·44 second hop
Time-cost optimization in repetitive project scheduling with limited resources (2021)Time-cost optimization in repetitive proj…Optimizing time–cost in generalized construction projects using multiple-objective social group optimization and multi-criteria decision-making methods (2020)Optimizing time–cost in gener…Resource-constrained project scheduling problem: review of past and recent developments (2018)Resource-constrained project …Optimizing linear project scheduling with multi-skilled crews (2012)Optimizing linear project sch…Mixed-integer linear programming for resource leveling problems (2012)Mixed-integer linear programm…LOB and CPM Integrated Method for Scheduling Repetitive Projects (2012)LOB and CPM Integrated Method…Multiobjective Optimization of Resource Leveling and Allocation during Construction Scheduling (2011)Multiobjective Optimization o…GA optimization model for repetitive projects with soft logic (2011)GA optimization model for rep…A genetic algorithm-based method for scheduling repetitive construction projects (2009)A genetic algorithm-based met…Genetic algorithm-based multi-objective model for scheduling of linear construction projects (2008)Genetic algorithm-based multi…A multi-mode resource-constrained discrete time–cost tradeoff problem and its genetic algorithm based solution (2008)A multi-mode resource-constra…The discrete time/cost trade-off problem: extensions and heuristic procedures (2007)The discrete time/cost trade-…Work Continuity Constraints in Project Scheduling (2005)Work Continuity Constraints i…Optimal Planning and Scheduling for Repetitive Construction Projects (2005)Optimal Planning and Scheduli…Challenges in Line-of-Balance Scheduling (2002)Challenges in Line-of-Balance…Optimal Repetitive Scheduling Model with Shareable Resource Constraint (2001)Optimal Repetitive Scheduling…Cost Optimization in Projects with Repetitive Nonserial Activities (2001)Cost Optimization in Projects…Critical-Path Planning and Scheduling: Mathematical Basis (1961)Multiproject Scheduling with Limited Resources: A Zero-One Programming Approach (1969)Project Scheduling: A Research Handbook (2002)The Resource Leveling Problem with multiple resources using an adaptive genetic algorithm (2012)A genetic algorithm for the robust resource leveling problem (2015)Tactical capacity planning in a real-world ETO industry case: An action research (2015)Decision analysis and behavioral research (1986)Scheduling Projects with Repeating Activities (1998)Time-Cost-Quality Trade-Off Analysis for Highway Construction (2005)Schedule risk analysis of infrastructure projects: A hybrid dynamic approach (2018)Assignment and Allocation Optimization of Partially Multiskilled Workforce (2002)The Multimode Resource‐Constrained Project Scheduling Problem for Repetitive Activities in Construction Projects (2018)A new algorithm for resource-constrained project scheduling with breadth and depth of skills (2020)Multi-skilling in scheduling problems: A review on models, methods and applications (2020)Linear Scheduling Model: Development of Controlling Activity Path (1998)Delay Risk Assessment of Repetitive Construction Projects Using Line-of-Balance Scheduling and Monte Carlo Simulation (2018)Survey Comparing Critical Path Method, Last Planner System, and Location-Based Techniques (2019)Critical-path planning and scheduling (1959)Characterization and Generation of a General Class of Resource-Constrained Project Scheduling Problems (1995)A practical approach to project scheduling: considering the potential quality loss cost in the time–cost tradeoff problem (2011)Project Management with Dynamic Scheduling (2012)Discrete particle swarm optimization method for the large-scale discrete time–cost trade-off problem (2016)Scheduling/Cost Optimization and Neural Dynamics Model for Construction (1997)Fuzzy critical chain method for project scheduling under resource constraints and uncertainty (2007)Metaheuristics for project and construction management – A state-of-the-art review (2011)Using Genetic Algorithms to Solve Construction Time-Cost Trade-Off Problems (1997)Using Improved Genetic Algorithms to Facilitate Time-Cost Optimization (1997)Optimization of construction time-cost trade-off analysis using genetic algorithms (1999)Professional Construction Management (1976)Scheduling project networks with resource constraints and time windows (1988)Automated trade‐off between time and cost in planning repetitive construction projects (2009)Optimised scheduling for weather sensitive offshore construction projects (2016)Opposition multiple objective symbiotic organisms search (OMOSOS) for time, cost, quality and work continuity tradeoff in repetitive projects (2017)Line‐of‐Balance Scheduling in Pavement Construction (1986)RPM: Repetitive Project Modeling (1990)CPM/LOB Scheduling Method for Project Deadline Constraint Satisfaction (2014)Multipurpose linear programming optimization model for repetitive activities scheduling in construction projects (2019)Strengths and shortcomings of methodologies for production planning and control of construction projects: a systematic literature review and future perspectives (2020)Activity networks: Project planning and control by network models (1977)Fuzzy sets (1996)A survey of variants and extensions of the resource-constrained project scheduling problem (2009)The sustainable project management: A review and future possibilities (2018)A mathematical model for project scheduling and material ordering problem with sustainability considerations: A case study in Iran (2019)Latin hypercube sampling-based NSGA-III optimization model for multimode resource constrained time–cost–quality–safety trade-off in construction projects (2020)
this work references cited by second hop

References

  • 2002Challenges in Line-of-Balance Scheduling167 cited
  • 2005Optimal Planning and Scheduling for Repetitive Construction Projects166 cited
  • 2018Resource-constrained project scheduling problem: review of past and recent developments148 cited
  • 2001Cost Optimization in Projects with Repetitive Nonserial Activities147 cited
  • 2007The discrete time/cost trade-off problem: extensions and heuristic procedures132 cited
  • 2009A genetic algorithm-based method for scheduling repetitive construction projects129 cited
  • 2012Mixed-integer linear programming for resource leveling problems117 cited
  • 2005Work Continuity Constraints in Project Scheduling105 cited
  • 2012Optimizing linear project scheduling with multi-skilled crews103 cited
  • 2012LOB and CPM Integrated Method for Scheduling Repetitive Projects100 cited
  • 2008A multi-mode resource-constrained discrete time–cost tradeoff problem and its genetic algorithm based solution93 cited
  • 2001Optimal Repetitive Scheduling Model with Shareable Resource Constraint86 cited
  • 2008Genetic algorithm-based multi-objective model for scheduling of linear construction projects78 cited
  • 2011GA optimization model for repetitive projects with soft logic76 cited
  • 2020

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work

Optimizing time–cost in generalized construction projects using multiple-objective social group optimization and multi-criteria decision-making methods
71 cited
  • 2011Multiobjective Optimization of Resource Leveling and Allocation during Construction Scheduling70 cited