The antecedents of construction project change: an analysis of design and build procurement application
14 references·0 citing·52 second hop
The antecedents of construction project change: an analysis of design and build procurement application (2021)The antecedents of construction project c…Post-occupancy evaluation: a review of literature (2019)Post-occupancy evaluation: a …Analysis of semi structured interviews (2019)Analysis of semi structured i…Introduction to positivism, interpretivism and critical theory (2018)Introduction to positivism, i…Identification of Causes and Effects of Poor Communication in Construction Industry: A Theoretical Review (2017)Identification of Causes and …Rework Causation: Emergent Theoretical Insights and Implications for Research (2016)Rework Causation: Emergent Th…Analysis of Trend and Convergence for Science and Technology using the VOSviewer (2016)Analysis of Trend and Converg…Investigating the client-related rework in building projects: The case of Singapore (2013)Investigating the client-rela…Engineering change: an overview and perspective on the literature (2010)Engineering change: an overvi…Research Validation: Challenges and Opportunities in the Construction Domain (2009)Research Validation: Challeng…Case Study: A Strategic Research Methodology (2008)Case Study: A Strategic Resea…Quantified Impacts of Project Change (2006)Quantified Impacts of Project…Influence of Project Type and Procurement Method on Rework Costs in Building Construction Projects (2002)Influence of Project Type and…Auditing the indirect consequences of rework in construction: a case based approach (2002)Auditing the indirect consequ…Quantitative Impacts of Project Change: Size Issues (1997)Quantitative Impacts of Proje…Mixing Qualitative and Quantitative Methods: Triangulation in Action (1979)Case Study Research: Design and Methods (1984)A comparative study of causes of time overruns in Hong Kong construction projects (1997)Benchmarking, Benchaction, and Benchlearning: Rework Mitigation in Projects (2003)Learning to Reduce Rework in Projects: Analysis of Firm's Organizational Learning and Quality Practices (2003)Standardizing Housing Defects: Classification, Validation, and Benefits (2012)Product development performance: strategy, organization, and management in the world auto industry (1991)The role of product architecture in the manufacturing firm (1995)A method to assess the effects of engineering change propagation (2012)Change impact on a product and its redesign process: a tool for knowledge capture and reuse (2012)Perspectives on iteration in design and development (2016)PRODUCT DESIGN AND DEVELOPMENT (2018)Handbook of Qualitative Research (1994)Case Study Research (2004)Qualitative research method-interviewing and observation (2014)Social media metrics and analytics in marketing – S3M: A mapping literature review (2017)Operationalising AI ethics: barriers, enablers and next steps (2021)Comparison of U.S. Project Delivery Systems (1998)Significant factors causing delay in the UAE construction industry (2006)Likert scales, levels of measurement and the “laws” of statistics (2010)APPLICATION OF DELPHI METHOD IN CONSTRUCTION ENGINEERING AND MANAGEMENT RESEARCH: A QUANTITATIVE PERSPECTIVE (2016)Collaborative model: Managing design changes with reusable project experiences through project learning and effective communication (2017)Factors Affecting Rework Costs in Construction (2017)The survey research handbook (1990)Questionnaire Design, Interviewing and Attitude Measurement (1993)Quantifying the causes and costs of rework in construction (2000)A seamless supply chain management model for construction (2004)Taxonomy for change causes and effects in construction projects (2008)Measuring the Impact of Rework on Construction Cost Performance (2009)Coefficient Alpha and the Internal Structure of Tests (1951)Determining Sample Size for Research Activities (1970)Practical Research: Planning and Design (1990)The Delphi Method: Review and Use in Construction Management Research (2014)Applying Artificial Neural Networks for Measuring and Predicting Construction-Labor Productivity (2015)Construction Claims and Disputes: Causes and Cost/Time Overruns (1994)Statistical analysis of causes for change orders in metropolitan public works (2004)Quality and Change Management Model for Large Scale Concurrent Design and Construction Projects (2005)Managing complex projects in the infrastructure sector — A structural equation model for flexibility-focused project management (2017)Competing paradigms in qualitative research. (1994)Research Paradigms and Meaning Making: A Primer (2015)Discriminating among grounded theory approaches (2018)Strengths and weaknesses of qualitative research in social science studies (2022)The Interpretivist Research Paradigm: A Subjective Notion of a Social Context (2022)Software survey: VOSviewer, a computer program for bibliometric mapping (2009)Science mapping software tools: Review, analysis, and cooperative study among tools (2011)Visualizing Bibliometric Networks (2014)An investigation into the role of the quantity surveyor in the value management workshop process (2020)Reverse supply chain conceptual model for construction and demolition waste (2021)Review of risk management studies in public-private partnerships: a scientometric analysis (2022)Curling linearity into circularity: The benefits of formal scavenging in closed-loop settings (2021)Unleashing the Barriers to CSR Implementation in the SME Sector of a Developing Economy: A Thematic Analysis Approach (2021)How to manage the Circular Economy Rebound effect: A proposal for contingency-based guidelines (2022)
this work references cited by second hop

References

  • 2008Case Study: A Strategic Research Methodology1,045 cited
  • 2002Influence of Project Type and Procurement Method on Rework Costs in Building Construction Projects464 cited
  • 2010Engineering change: an overview and perspective on the literature420 cited
  • 2018Introduction to positivism, interpretivism and critical theory380 cited
  • 2009Research Validation: Challenges and Opportunities in the Construction Domain245 cited
  • 2019Analysis of semi structured interviews189 cited
  • 1997Quantitative Impacts of Project Change: Size Issues143 cited
  • 2013Investigating the client-related rework in building projects: The case of Singapore134 cited
  • 2019Post-occupancy evaluation: a review of literature125 cited
  • 2002Auditing the indirect consequences of rework in construction: a case based approach119 cited
  • 2017Identification of Causes and Effects of Poor Communication in Construction Industry: A Theoretical Review118 cited
  • 2006Quantified Impacts of Project Change106 cited
  • 2016Rework Causation: Emergent Theoretical Insights and Implications for Research88 cited
  • 2016Analysis of Trend and Convergence for Science and Technology using the VOSviewer66 cited

Cited by

No citing works inside the corpus for this window.

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work