SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
DESIGNING TO REDUCE CONSTRUCTION COSTS
0 references·16 citing·48 second hop
DESIGNING TO REDUCE CONSTRUCTION COSTS (1976)DESIGNING TO REDUCE CONSTRUCTION COSTSAn adaptation of reference class forecasting for the assessment of large-scale urban planning vision, a SEM-ANN approach to the case of Hong Kong Lantau tomorrow (2021)An adaptation of reference cl…Identifying and Measuring Engineering, Procurement, and Construction (EPC) Key Performance Indicators and Management Strategies (2019)Identifying and Measuring Eng…Coordination of teams, meetings, and managerial processes in construction projects: using a lean and complex adaptive mechanism (2019)Coordination of teams, meetin…Phase-based analysis of key cost and schedule performance causes and preventive strategies (2018)Phase-based analysis of key c…A Technique to Capture Multi-Disciplinary Tacit Knowledge During the Conceptual Design Phase of a Building Project (2014)A Technique to Capture Multi-…Improving Dynamic Knowledge Movements with a Knowledge-Based Framework during Conceptual Design of a Green Building Project (2013)Improving Dynamic Knowledge M…Overcoming the Hurdle of First Cost: Action Research in Target Costing (2009)Overcoming the Hurdle of Firs…Discontinuity in organisations: identifying business environments affecting efficiency of knowledge flows in Product Lifecycle Management (2008)Discontinuity in organisation…Organizing Constructability Knowledge for Design (2005)Organizing Constructability K…Evaluating Design-Build-Operate-Maintain Delivery as a Tool for Sustainability (2005)Evaluating Design-Build-Opera…Work Structuring to Achieve Integrated Product–Process Design (2004)Work Structuring to Achieve I…Master Builder Project Delivery System and Designer Construction Knowledge (2003)Master Builder Project Delive…Project Management Actions to Improve Design Phase Cost Performance (2002)Project Management Actions to…Achieving Multiple Project Objectives through Contingency Management (2002)Achieving Multiple Project Ob…Management-Driven Integration (2000)Management-Driven IntegrationCompetence and timing dilemma in construction planning (1988)Competence and timing dilemma…Case Study Research: Design and Methods (1984)The Knowledge-Creating Company (1995)Case study research: design and methods (2011)Enhancing Design Management by Partnering in Delivery of International EPC Projects: Evidence from Chinese Construction Companies (2015)Investigating the Impact of Project Definition Clarity on Project Performance: Structural Equation Modeling Study (2015)Constructability: Outline of Past, Present, and Future Research (2017)Characteristics of Organizational Environments and Perceived Environmental Uncertainty (1972)The Nature of Managerial Work (1974)The Structure of "Unstructured" Decision Processes (1976)Process of Planning during Construction (1994)The planning and control process of refurbishment projects (1997)Planning and control processes and techniques for refurbishment management (1998)Differentiation and Integration in Complex Organizations (1967)Designing Complex Organizations (1973)Information Processing as an Integrating Concept in Organizational Design (1978)Involvement of key design participants in refurbishment design process (2008)Client recommendations for financial incentives on construction projects (2010)The Effect of Public–Private Partnerships on Innovation in Infrastructure Delivery (2023)Building operations management theory through case and field research (1998)Toyota production system: beyond large-scale production (1998)An exploration towards a production theory and its application to construction (2000)A design structural matrix approach displaying structural and assembly requirements in construction: a timber case study (2006)Using Digital Socialization to Support Geographically Dispersed AEC Project Teams (2007)Improving construction workflow- The role of production planning and control (2009)Critical factors in successful project implementation (1987)Critical Success Factors for Construction Projects (1992)Critical Success Factors for Different Project Objectives (1999)Effectiveness of Coordination Methods in Construction Projects (2013)Impact of Design Cost on Project Performance of Design-Bid-Build Road Projects (2013)Designing to Reduce Construction Costs (1976)Relationship between Project Interaction and Performance Indicators (1996)Comparison of U.S. Project Delivery Systems (1998)Early Contractor Design Involvement to Expedite Delivery of Emergency Highway Projects (2013)Business Dynamics: Systems Thinking and Modeling for a Complex World (2000)System Dynamics: Systems Thinking and Modeling for a Complex World (2002)Modeling the Impact of Design Rework on Transportation Infrastructure Construction Project Performance (2014)Contingency modelling for construction projects using fuzzy-set theory (2015)Estimated Cost at Completion: Integrating Risk into Earned Value Management (2016)Integrating Concurrent Engineering Concepts in a Steelwork Construction Project (2000)Project management: cost, time and quality, two best guesses and a phenomenon, its time to accept other success criteria (1999)Underestimating Costs in Public Works Projects: Error or Lie? (2002)Causes of delay in large construction projects (2006)Critical risk factors in international construction projects (2020)Supply chain risk management research in construction: a systematic review (2022)Causes and effects of delays in Malaysian construction industry (2007)Statistical Analysis of Delay-Causing Factors in Indian Highway Construction Projects under Hybrid Annuity Model (2023)Value network and firm performance: the role of knowledge distance and environmental uncertainty (2023)Optimizing time, cost, environmental impact, and client satisfaction in sustainable construction projects using LHS-NSGA-III: a multi-objective approach (2024)
this work references cited by second hop

References

No references inside the corpus for this window.

Cited by

  • 2002Achieving Multiple Project Objectives through Contingency Management89 cited
  • 2004Work Structuring to Achieve Integrated Product–Process Design81 cited
  • 2005Organizing Constructability Knowledge for Design76 cited
  • 2000Management-Driven Integration76 cited
  • 2018Phase-based analysis of key cost and schedule performance causes and preventive strategies61 cited
  • 2019Identifying and Measuring Engineering, Procurement, and Construction (EPC) Key Performance Indicators and Management Strategies60 cited
  • 1988Competence and timing dilemma in construction planning46 cited
  • 2002Project Management Actions to Improve Design Phase Cost Performance44 cited
  • 2003Master Builder Project Delivery System and Designer Construction Knowledge40 cited
  • 2005Evaluating Design-Build-Operate-Maintain Delivery as a Tool for Sustainability35 cited
  • 2009Overcoming the Hurdle of First Cost: Action Research in Target Costing30 cited
  • 2019Coordination of teams, meetings, and managerial processes in construction projects: using a lean and complex adaptive mechanism30 cited
  • 2008Discontinuity in organisations: identifying business environments affecting efficiency of knowledge flows in Product Lifecycle Management25 cited
  • 2014

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work

A Technique to Capture Multi-Disciplinary Tacit Knowledge During the Conceptual Design Phase of a Building Project
16 cited
  • 2013Improving Dynamic Knowledge Movements with a Knowledge-Based Framework during Conceptual Design of a Green Building Project14 cited
  • 2021An adaptation of reference class forecasting for the assessment of large-scale urban planning vision, a SEM-ANN approach to the case of Hong Kong Lantau tomorrow13 cited