SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
METHODS FOR CAPITAL PROGRAMMING AND PROJECT SELECTION
0 references·2 citing·6 second hop
METHODS FOR CAPITAL PROGRAMMING AND PROJECT SELECTION (1997)METHODS FOR CAPITAL PROGRAMMING AND PROJE…Optimal Decision Making of Interdependent Tollway Capital Investments Incorporating Risk and Uncertainty (2013)Optimal Decision Making of In…Performance Measurement in the Road Sector (2012)Performance Measurement in th…Performance measures of operational effectiveness for highway segments and systems (2003)Urban Transport Trends and Policies in China and India: Impacts of Rapid Economic Growth (2007)Performance-based contracting for preservation and improvement of road assets (2009)Life Cycle Cost Analysis in Pavement Design: In Search of Better Investment Decisions (1998)Risk-based Life-cycle Costing of Infrastructure Rehabilitation and Construction Alternatives (2003)Highway Project Level Life-Cycle Benefit/Cost Analysis under Certainty, Risk, and Uncertainty: Methodology with Case Study (2009)
this work references cited by second hop

References

No references inside the corpus for this window.

Cited by

  • 2012Performance Measurement in the Road Sector9 cited
  • 2013Optimal Decision Making of Interdependent Tollway Capital Investments Incorporating Risk and Uncertainty8 cited

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work