SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
EVALUASI MANAJEMEN RISIKO TEKNOLOGI INFORMASI PADA PERUSAHAAN DAERAH AIR MINUM KOTA SALATIGA MENGGUNAKAN FRAMEWORK COBIT 5.0
4 references·0 citing·10 second hop
EVALUASI MANAJEMEN RISIKO TEKNOLOGI INFORMASI PADA PERUSAHAAN DAERAH AIR MINUM KOTA SALATIGA MENGGUNAKAN FRAMEWORK COBIT 5.0 (2021)EVALUASI MANAJEMEN RISIKO TEKNOLOGI INFOR…Evaluasi Manajemen Risiko Teknologi Informasi Menggunakan Framework Cobit 5 (Studi Kasus : Pt.Kimia Farma (Persero) Tbk –Plant Watudakon) (2017)Evaluasi Manajemen Risiko Tek…COBIT 5: Enabling Processes (2012)COBIT 5: Enabling ProcessesCOSO Enterprise Risk Management (2011)COSO Enterprise Risk Manageme…Project Risk Management Guidelines: Managing Risk in Large Projects and Complex Procurements (2004)Project Risk Management Guide…Large engineering project risk management using a Bayesian belief network (2008)Preferred risk allocation in China’s public–private partnership (PPP) projects (2009)Occupational risk assessment in construction industry – Overview and reflection (2011)Explaining IT governance disclosure through the constructs of IT governance maturity and IT strategic role (2017)The impact of an IT governance framework on the internal control environment (2017)Achieving strategic benefits from business IT projects: The critical importance of using the business case across the entire project lifetime (2019)PENGUKURAN TINGKAT KAPABILITAS MANAJEMEN RISIKO SISTEM INFORMASI KOPERASI SYARIAH MENGGUNAKAN FRAMEWORK COBIT 5 (2020)Sustainability and Risk Disclosure: An Exploratory Study on Sustainability Reports (2017)The Hazards of Expert Control: Chief Risk Officers and Risky Derivatives (2017)Controlling as a tool for SME management with an emphasis on innovations in the context of Industry 4.0 (2019)
this work references cited by second hop

References

  • 2004Project Risk Management Guidelines: Managing Risk in Large Projects and Complex Procurements295 cited
  • 2012COBIT 5: Enabling Processes129 cited
  • 2011COSO Enterprise Risk Management74 cited
  • 2017Evaluasi Manajemen Risiko Teknologi Informasi Menggunakan Framework Cobit 5 (Studi Kasus : Pt.Kimia Farma (Persero) Tbk –Plant Watudakon)9 cited

Cited by

No citing works inside the corpus for this window.

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work