SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
Modeling a Multi-Criteria Decision Support System for Prequalification Assessment of Construction Contractors using CRITIC and EDAS Models
16 references·0 citing·47 second hop
Modeling a Multi-Criteria Decision Support System for Prequalification Assessment of Construction Contractors using CRITIC and EDAS Models (2021)Modeling a Multi-Criteria Decision Suppor…Objective methods for determining criteria weight coefficients: A modification of the CRITIC method (2020)Objective methods for determi…Criticality of Construction Industry Problems in Developing Countries: Analyzing Malaysian Projects (2019)Criticality of Construction I…An Integrated EDAS-ELECTRE Method With Picture Fuzzy Information for Cleaner Production Evaluation in Gold Mines (2018)An Integrated EDAS-ELECTRE Me…INTUITIONISTIC FUZZY EDAS METHOD: AN APPLICATION TO SOLID WASTE DISPOSAL SITE SELECTION (2017)INTUITIONISTIC FUZZY EDAS MET…Critic and Maut Methods for the Contract Manufacturer Selection Problem (2017)Critic and Maut Methods for t…A new hybrid fuzzy MCDM approach for evaluation of construction equipment with sustainability considerations (2017)A new hybrid fuzzy MCDM appro…A comprehensive MCDM-based approach using TOPSIS, COPRAS and DEA as an auxiliary tool for material selection problems (2017)A comprehensive MCDM-based ap…Multi-Criteria Inventory Classification Using a New Method of Evaluation Based on Distance from Average Solution (EDAS) (2015)Multi-Criteria Inventory Clas…A fuzzy multi-criteria decision-making model for construction contractor prequalification (2012)A fuzzy multi-criteria decisi…Assessing contractor selection criteria weights with fuzzy AHP method application in group decision environment (2010)Assessing contractor selectio…Analysis of pre‐qualification criteria in contractor selection and their impacts on project success (2009)Analysis of pre‐qualification…Contractor pre-qualification model: State-of-the-art (2007)Contractor pre-qualification …ANALYSIS OF CRITERIA FOR CONTRACTORS’ QUALIFICATION EVALUATION (2006)ANALYSIS OF CRITERIA FOR CONT…An economic game theory model of subcontractor resource allocation behaviour (2006)An economic game theory model…Applying Evidential Reasoning to Prequalifying Construction Contractors (2002)Applying Evidential Reasoning…Decision Criteria in Contractor Prequalification (1988)Decision Criteria in Contract…A fuzzy extension of Saaty's priority theory (1983)Fuzzy hierarchical analysis (1985)Applications of the extent analysis method on fuzzy AHP (1996)A NEW DETERMINING METHOD FOR THE CRITERIA WEIGHTS IN MULTICRITERIA EVALUATION (2011)A novel approach for combination of individual and group decisions based on fuzzy best-worst method (2017)A comparative study of causes of time overruns in Hong Kong construction projects (1997)Final contractor selection using the analytical hierarchy process (2000)Achieving best value in private finance initiative project procurement (2003)Structural equation model for investigating factors affecting delay in Indian construction projects (2012)Determining Success Factors for a Construction Organization: A Structural Equation Modeling Approach (2017)Investigating design changes in Malaysian building projects (2017)Behavioral Decision Theory: Processes of Judgement and Choice (1981)An evaluation of construction time performance in the building industry (1996)A decision model proposal for construction contractor selection in Turkey (2003)Competitiveness in construction: a critical review of research (2007)Fuzzy sets (1965)Multiple Attribute Decision Making: Methods and Applications (1981)Fuzzy sets (1996)Multi-criteria Assessment of Facades’ Alternatives: Peculiarities of Ranking Methodology (2013)Supplier selection process in an integrated construction materials management model (2014)Solving Civil Engineering Problems by Means of Fuzzy and Stochastic MCDM Methods: Current State and Future Research (2015)Compromise solution by MCDM methods: A comparative analysis of VIKOR and TOPSIS (2003)ABC inventory classification with multiple-criteria using weighted linear optimization (2004)A combined compromise solution (CoCoSo) method for multi-criteria decision-making problems (2018)Sustainable supplier selection in healthcare industries using a new MCDM method: Measurement of alternatives and ranking according to COmpromise solution (MARCOS) (2019)Determination of Objective Weights Using a New Method Based on the Removal Effects of Criteria (MEREC) (2021)Measuring the efficiency of decision making units (1978)Some Models for Estimating Technical and Scale Inefficiencies in Data Envelopment Analysis (1984)A comparison of fuzzy DEA and fuzzy TOPSIS in sustainable supplier selection: Implications for sourcing strategy (2018)Sustainable third-party reverse logistics provider evaluation and selection using fuzzy SWARA and developed fuzzy COPRAS in the presence of risk criteria (2018)A novel hybrid MCDM model for machine tool selection using fuzzy DEMATEL, entropy weighting and later defuzzification VIKOR (2020)Intuitionistic fuzzy sets (1986)A military airport location selection by AHP integrated PROMETHEE and VIKOR methods (2018)Fermatean fuzzy CRITIC-EDAS approach for the selection of sustainable third-party reverse logistics providers using improved generalized score function (2021)The use of multi-criteria decision-making methods in business analytics: A comprehensive literature review (2021)Project management: A systems approach to planning, scheduling and controlling (1982)Causes and effects of delays in Malaysian construction industry (2007)Understanding the key risks in construction projects in China (2007)Capitalising teamwork for enhancing project delivery and management in construction: empirical study in Malaysia (2020)Impact of Work Motivation on Construction Labor Productivity (2020)Identifying Critical Dispute Causes in the Construction Industry: A Cross-Regional Comparative Study between China and the UK (2022)Prioritizing the solutions of reverse logistics implementation to mitigate its barriers: A hybrid modified SWARA and WASPAS approach (2019)Location selection for logistics center with fuzzy SWARA and CoCoSo methods (2020)Application of Fuzzy AHP and Fuzzy MARCOS Approach for the Evaluation of E-Service Quality in the Airline Industry (2021)Assessment of distribution center locations using a multi-expert subjective–objective decision-making approach (2021)Comparative assessment of social sustainability performance: Integrated data-driven weighting system and CoCoSo model (2021)Sustainable cities and communities assessment using the DARIA-TOPSIS method (2022)
this work references cited by second hop

References

  • 2015Multi-Criteria Inventory Classification Using a New Method of Evaluation Based on Distance from Average Solution (EDAS)1,376 cited
  • 2017A comprehensive MCDM-based approach using TOPSIS, COPRAS and DEA as an auxiliary tool for material selection problems369 cited
  • 2017INTUITIONISTIC FUZZY EDAS METHOD: AN APPLICATION TO SOLID WASTE DISPOSAL SITE SELECTION343 cited
  • 1988Decision Criteria in Contractor Prequalification211 cited
  • 2010Assessing contractor selection criteria weights with fuzzy AHP method application in group decision environment194 cited
  • 2017A new hybrid fuzzy MCDM approach for evaluation of construction equipment with sustainability considerations193 cited
  • 2020Objective methods for determining criteria weight coefficients: A modification of the CRITIC method189 cited
  • 2009Analysis of pre‐qualification criteria in contractor selection and their impacts on project success170 cited
  • 2019Criticality of Construction Industry Problems in Developing Countries: Analyzing Malaysian Projects153 cited
  • 2012A fuzzy multi-criteria decision-making model for construction contractor prequalification144 cited
  • 2007Contractor pre-qualification model: State-of-the-art135 cited
  • 2017Critic and Maut Methods for the Contract Manufacturer Selection Problem99 cited
  • 2006An economic game theory model of subcontractor resource allocation behaviour94 cited

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work

2018
An Integrated EDAS-ELECTRE Method With Picture Fuzzy Information for Cleaner Production Evaluation in Gold Mines
87 cited
  • 2002Applying Evidential Reasoning to Prequalifying Construction Contractors85 cited
  • 2006ANALYSIS OF CRITERIA FOR CONTRACTORS’ QUALIFICATION EVALUATION79 cited
  • Cited by

    No citing works inside the corpus for this window.