A two-phase approach for solving the multi-skill resource-constrained multi-project scheduling problem: a case study in construction industry
16 references·0 citing·35 second hop
A two-phase approach for solving the multi-skill resource-constrained multi-project scheduling problem: a case study in construction industry (2021)A two-phase approach for solving the mult…A genetic programming hyper-heuristic approach for the multi-skill resource constrained project scheduling problem (2019)A genetic programming hyper-h…Hybrid Differential Evolution and Greedy Algorithm (DEGR) for solving Multi-Skill Resource-Constrained Project Scheduling Problem (2017)Hybrid Differential Evolution…Combining Monte-Carlo and hyper-heuristic methods for the multi-mode resource-constrained multi-project scheduling problem (2016)Combining Monte-Carlo and hyp…A multi-objective invasive weeds optimization algorithm for solving multi-skill multi-mode resource constrained project scheduling problem (2016)A multi-objective invasive we…Multi-mode resource constrained multi-project scheduling and resource portfolio problem (2014)Multi-mode resource constrain…A multi-agent system for decentralized multi-project scheduling with resource transfers (2013)A multi-agent system for dece…A multi-agent system for distributed multi-project scheduling: An auction-based negotiation approach (2012)A multi-agent system for dist…Resource-constrained multi-project scheduling: Priority rule performance revisited (2010)Resource-constrained multi-pr…Phase I Statistical Process Control Charts: An Overview and Some Results (2008)Phase I Statistical Process C…A heuristic solution framework for the resource constrained (multi-)project scheduling problem with sequence-dependent transfer times (2008)A heuristic solution framewor…A multi‐agent system for the decentralized resource‐constrained multi‐project scheduling problem (2007)A multi‐agent system for the …A genetic algorithm for the resource constrained multi-project scheduling problem (2007)A genetic algorithm for the r…Multi-project scheduling using an heuristic and a genetic algorithm (2006)Multi-project scheduling usin…A market-based multi-agent system model for decentralized multi-project scheduling (2006)A market-based multi-agent sy…PSPLIB - A project scheduling problem library (1997)PSPLIB - A project scheduling…Multiple Attribute Decision Making (1981)Multiple Attribute Decision M…Auctions and Bidding (1986)Auction Theory: A Guide to the Literature (1999)Resource-constrained project scheduling: Notation, classification, models, and methods (1999)Simulation-Based Multiagent Approach for Scheduling Modular Construction (2012)Resource-constrained multi-project scheduling problem: A survey (2022)Introduction to Statistical Quality Control (1992)Statistical Methods for Quality Improvement (2000)Introduction to Statistical Quality Control (2005)A New Distribution‐free Control Chart for Joint Monitoring of Unknown Location and Scale Parameters of Continuous Distributions (2013)Control Charts for Joint Monitoring of Mean and Variance: An Overview (2013)Another Look at the EWMA Control Chart with Estimated Parameters (2015)Multiproject Scheduling with Limited Resources: A Zero-One Programming Approach (1969)Algorithm for optimal winner determination in combinatorial auctions (2002)A Semisupervised Multiagent System Model to Support Consensus-Reaching Processes (2013)A survey of variants and extensions of the resource-constrained project scheduling problem (2009)Efficient priority rules for the stochastic resource-constrained project scheduling problem (2018)Resource-constrained project scheduling problem: review of past and recent developments (2018)A new efficient simulated annealing algorithm for the resource-constrained project scheduling problem and its multiple mode version (2003)Latin hypercube sampling-based NSGA-III optimization model for multimode resource constrained time–cost–quality–safety trade-off in construction projects (2020)Time-Cost-Quality Trade-Off Analysis for Highway Construction (2005)Introduction to Quality Engineering (2008)Introduction to quality engineering.... (2014)Multi-skilled project scheduling with level-dependent rework risk; three multi-objective mechanisms based on cuckoo search (2017)Multi-skilling in scheduling problems: A review on models, methods and applications (2020)Extensions of the resource-constrained project scheduling problem (2023)A Branch-and-Bound Procedure for the Multiple Resource-Constrained Project Scheduling Problem (1992)Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation (1996)A decomposition-based multi-objective genetic programming hyper-heuristic approach for the multi-skill resource constrained project scheduling problem (2021)Multi-objective multi-mode resource-constrained project scheduling with fuzzy activity durations in prefabricated building construction (2021)Ant colony optimization for resource-constrained project scheduling (2002)Project scheduling under uncertainty: Survey and research potentials (2004)A state of the art review of intelligent scheduling (2018)Compromise solution by MCDM methods: A comparative analysis of VIKOR and TOPSIS (2003)GIS‐based multicriteria decision analysis: a survey of the literature (2006)A state-of the-art survey of TOPSIS applications (2012)
this work references cited by second hop

References

  • 1981Multiple Attribute Decision Making8,633 cited
  • 1997PSPLIB - A project scheduling problem library1,309 cited
  • 2007A genetic algorithm for the resource constrained multi-project scheduling problem334 cited
  • 2010Resource-constrained multi-project scheduling: Priority rule performance revisited263 cited
  • 2008Phase I Statistical Process Control Charts: An Overview and Some Results180 cited
  • 2019A genetic programming hyper-heuristic approach for the multi-skill resource constrained project scheduling problem166 cited
  • 2014Multi-mode resource constrained multi-project scheduling and resource portfolio problem148 cited
  • 2012A multi-agent system for distributed multi-project scheduling: An auction-based negotiation approach147 cited
  • 2006A market-based multi-agent system model for decentralized multi-project scheduling143 cited
  • 2016A multi-objective invasive weeds optimization algorithm for solving multi-skill multi-mode resource constrained project scheduling problem123 cited
  • 2008A heuristic solution framework for the resource constrained (multi-)project scheduling problem with sequence-dependent transfer times120 cited
  • 2007A multi‐agent system for the decentralized resource‐constrained multi‐project scheduling problem114 cited
  • 2016Combining Monte-Carlo and hyper-heuristic methods for the multi-mode resource-constrained multi-project scheduling problem113 cited

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work

  • 2006Multi-project scheduling using an heuristic and a genetic algorithm102 cited
  • 2013A multi-agent system for decentralized multi-project scheduling with resource transfers96 cited
  • 2017Hybrid Differential Evolution and Greedy Algorithm (DEGR) for solving Multi-Skill Resource-Constrained Project Scheduling Problem91 cited
  • Cited by

    No citing works inside the corpus for this window.