this work references cited by second hopReferences
- 1981Multiple Attribute Decision Making8,633 cited
- 1986Optimal Lot Sizing, Process Quality Improvement and Setup Cost Reduction1,161 cited
- 2016Collaborative Filtering Bandits291 cited
- 2001Production lot sizing with the reworking of imperfect quality items produced287 cited
- 2004Optimal manufacturing batch size with rework process at a single-stage production system249 cited
- 2003Determining the optimal lot size for the finite production model with random defective rate, the rework process, and backlogging222 cited
- 2014An economic production quantity model with random defective rate, rework process and backorders for a single stage production system191 cited
- 2019Modelling And optimal lot-sizing of the replenishments in constrained, multi-product and bi-objective EPQ models with defective products: Generalised Cross Decomposition182 cited
- 2015Product inspection policy for an imperfect production system with inspection errors and warranty cost166 cited
- 2009Economic production quantity model with imperfect-quality items, two-way imperfect inspection and sales return166 cited
- 2009A note on “Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns”121 cited
- 2006Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns109 cited
- 2014Manufacturing setup cost reduction and quality improvement for the distribution free continuous-review inventory model with a service level constraint
Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work