SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
An improved exponential EWMA chart for monitoring time between events
16 references·2 citing·33 second hop
An improved exponential EWMA chart for monitoring time between events (2022)An improved exponential EWMA chart for mo…An Overview of Control Charts for High‐quality Processes (2016)An Overview of Control Charts…Exponential CUSUM Charts with Estimated Control Limits (2013)Exponential CUSUM Charts with…Control Charts Based on the Exponential Distribution: Adapting Runs Rules for the t Chart (2013)Control Charts Based on the E…Optimal Design of a CUSUM Chart for a Mean Shift of Unknown Size (2010)Optimal Design of a CUSUM Cha…Properties of the exponential EWMA chart with parameter estimation (2009)Properties of the exponential…A control chart for the Gamma distribution as a model of time between events (2007)A control chart for the Gamma…A study of EWMA chart with transformed exponential data (2006)A study of EWMA chart with tr…Optimization design of control charts based on Taguchi's loss function and random process shifts (2004)Optimization design of contro…Robustness of the time between events CUSUM (2003)Robustness of the time betwee…Some effective control chart procedures for reliability monitoring (2002)Some effective control chart …Cumulative quantity control charts for monitoring production processes (2000)Cumulative quantity control c…Designs of One- and Two-Sided Exponential EWMA Charts (1998)Designs of One- and Two-Sided…Design of Optimal Exponential CUSUM Control Charts (1994)Design of Optimal Exponential…A Control Chart for Parts-Per-Million Nonconforming Items (1994)A Control Chart for Parts-Per…Quality control techniques for “Zero Defects” (1984)Quality control techniques fo…Quality Control Techniques for "Zero Defects" (1983)Quality Control Techniques fo…Combined Shewhart–EWMA and Shewhart–CUSUM monitoring schemes for time between events (2024)Combined Shewhart–EWMA and Sh…Monitoring processes with multiple dependent production lines using time between events control charts (2023)Monitoring processes with mul…CONTINUOUS INSPECTION SCHEMES (1954)Optimal Stopping Times for Detecting Changes in Distributions (1986)Introduction to Statistical Quality Control (2005)An Evaluation of a GLR Control Chart for Monitoring the Process Mean (2010)A comparison study of effectiveness and robustness of control charts for monitoring process mean (2011)Mixed CUSUM-EWMA chart for monitoring process dispersion (2016)Counted Data CUSUM's (1985)The Economic Design of Control Charts: A Unified Approach (1986)Detecting a Shift in Fraction Nonconforming Using Run-Length Control Charts with 100% Inspection (1991)An economically designed, integrated quality and maintenance model using an adaptive Shewhart chart (2008)The Shewhart Control Chart—Tests for Special Causes (1984)Introduction to Statistical Quality Control (1992)The Use of Control Charts in Health-Care and Public-Health Surveillance (2006)A control chart for an exponential distribution using multiple dependent state sampling (2014)Designing of a new monitoring t-chart using repetitive sampling (2014)Research Issues and Ideas in Statistical Process Control (1999)Application of statistical process control in healthcare improvement: systematic review (2007)A Review of Some Sampling and Aggregation Strategies for Basic Statistical Process Monitoring (2019)Models and monitoring of zero‐inflated processes: The past and current trends (2019)Simultaneous monitoring of magnitude and time-between-events data with a Max-EWMA control chart (2020)Statistical Quality Control (1990)Optimal Limits for Attributes Control Charts (1997)On the Performance of Geometric Charts with Estimated Control Limits (2002)Exponentially Weighted Moving Average Control Schemes: Properties and Enhancements (1990)Statistical Surveillance. Optimality and Methods (2003)Guaranteed Conditional Performance of Control Charts via Bootstrap Methods (2013)Guaranteed Conditional Performance of Control Charts via Bootstrap Methods (2016)Designing production systems for quality: Research opportunities from an automotive industry perspective (2003)Some procedures for decision making in controlling high yield processes (1992)A Review and perspective on surveillance of Bernoulli processes (2011)Improvement Detection by Control Charts for High Yield Processes (1993)A quality monitoring and decision‐making scheme for automated production processes (1999)Comparison of control charts for low defective rate (2009)
this work references cited by second hop

References

  • 2002Some effective control chart procedures for reliability monitoring271 cited
  • 1983Quality Control Techniques for "Zero Defects"186 cited
  • 1994A Control Chart for Parts-Per-Million Nonconforming Items171 cited
  • 1998Designs of One- and Two-Sided Exponential EWMA Charts169 cited
  • 2000Cumulative quantity control charts for monitoring production processes161 cited
  • 1984Quality control techniques for “Zero Defects”142 cited
  • 2013Control Charts Based on the Exponential Distribution: Adapting Runs Rules for the t Chart141 cited
  • 2016An Overview of Control Charts for High‐quality Processes139 cited
  • 2010Optimal Design of a CUSUM Chart for a Mean Shift of Unknown Size125 cited
  • 2007A control chart for the Gamma distribution as a model of time between events123 cited
  • 2013Exponential CUSUM Charts with Estimated Control Limits116 cited
  • 2004Optimization design of control charts based on Taguchi's loss function and random process shifts114 cited
  • 1994Design of Optimal Exponential CUSUM Control Charts100 cited
  • 2003Robustness of the time between events CUSUM90 cited
  • 2009Properties of the exponential EWMA chart with parameter estimation72 cited

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work

  • 2006A study of EWMA chart with transformed exponential data72 cited
  • Cited by

    • 2023Monitoring processes with multiple dependent production lines using time between events control charts12 cited
    • 2024Combined Shewhart–EWMA and Shewhart–CUSUM monitoring schemes for time between events10 cited