Multi-objective stochastic project scheduling with alternative execution methods: An improved quantum-behaved particle swarm optimization approach
16 references·0 citing·36 second hop
Multi-objective stochastic project scheduling with alternative execution methods: An improved quantum-behaved particle swarm optimization approach (2022)Multi-objective stochastic project schedu…Multi-objective multi-mode resource constrained project scheduling problem using Pareto-based algorithms (2019)Multi-objective multi-mode re…A survey of hybrid metaheuristics for the resource-constrained project scheduling problem (2019)A survey of hybrid metaheuris…A robust optimization approach for the multi-mode resource-constrained project scheduling problem (2019)A robust optimization approac…Resource-constrained project scheduling problem: review of past and recent developments (2018)Resource-constrained project …A tabu search procedure for the resource-constrained project scheduling problem with alternative subgraphs (2018)A tabu search procedure for t…A purely proactive scheduling procedure for the resource-constrained project scheduling problem with stochastic activity durations (2015)A purely proactive scheduling…Multi-mode resource-constrained project scheduling problems with non-preemptive activity splitting (2014)Multi-mode resource-constrain…A review of methods and algorithms for optimizing construction scheduling (2013)A review of methods and algor…Multi-mode resource-constrained discrete time–cost-resource optimization in project scheduling using non-dominated sorting genetic algorithm (2012)Multi-mode resource-constrain…Multi-mode resource-constrained project scheduling using RCPSP and SAT solvers (2011)Multi-mode resource-constrain…A genetic algorithm for the preemptive and non-preemptive multi-mode resource-constrained project scheduling problem (2009)A genetic algorithm for the p…Supply chain design under uncertainty using sample average approximation and dual decomposition (2008)Supply chain design under unc…Scheduling projects with stochastic activity duration to maximize expected net present value (2008)Scheduling projects with stoc…Particle swarm optimization-based schemes for resource-constrained project scheduling (2004)Particle swarm optimization-b…PSPLIB - A project scheduling problem library (1997)PSPLIB - A project scheduling…Chance-Constrained Programming (1959)Chance-Constrained ProgrammingA Branch-and-Bound Procedure for the Multiple Resource-Constrained Project Scheduling Problem (1992)Characterization and Generation of a General Class of Resource-Constrained Project Scheduling Problems (1995)Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation (1996)Project scheduling under uncertainty: Survey and research potentials (2004)A competitive genetic algorithm for resource-constrained project scheduling (1998)An effective shuffled frog-leaping algorithm for resource-constrained project scheduling problem (2011)On the performance of bee algorithms for resource-constrained project scheduling problem (2011)Critical-Path Planning and Scheduling: Mathematical Basis (1961)Using Genetic Algorithms to Solve Construction Time-Cost Trade-Off Problems (1997)A survey of variants and extensions of the resource-constrained project scheduling problem (2009)A review of methods, techniques and tools for project planning and control (2018)Time–cost–quality trade-off analysis for planning construction projects (2019)Latin hypercube sampling-based NSGA-III optimization model for multimode resource constrained time–cost–quality–safety trade-off in construction projects (2020)Introduction to Stochastic Programming (1998)The Sample Average Approximation Method for Stochastic Discrete Optimization (2002)Introduction to Stochastic Programming (2011)Supply chain network design under uncertainty: A comprehensive review and future research directions (2017)Supply chain risk management and artificial intelligence: state of the art and future research directions (2018)Smart “Predict, then Optimize” (2021)Resource-constrained project scheduling: Notation, classification, models, and methods (1999)Experimental investigation of heuristics for resource-constrained project scheduling: An update (2005)Project scheduling with finite or infinite number of activity processing modes – A survey (2010)An updated survey of variants and extensions of the resource-constrained project scheduling problem (2021)Heuristic Algorithms for the Resource-Constrained Project Scheduling Problem: Classification and Computational Analysis (1999)A novel Multiple Objective Symbiotic Organisms Search (MOSOS) for time–cost–labor utilization tradeoff problem (2015)Analysis of interacting uncertainties in on-site and off-site activities: Implications for hybrid construction (2016)Activity networks: Project planning and control by network models (1977)Fuzzy sets (1996)The sustainable project management: A review and future possibilities (2018)A mathematical model for project scheduling and material ordering problem with sustainability considerations: A case study in Iran (2019)Deterministic Equivalents for Optimizing and Satisficing under Chance Constraints (1963)Optimization under uncertainty: state-of-the-art and opportunities (2003)Stochastic Programming (2010)Construction and evaluation framework for a real-life project database (2014)Memetic algorithm for solving resource constrained project scheduling problems (2019)Extensions of the resource-constrained project scheduling problem (2023)
this work references cited by second hop

References

  • 1959Chance-Constrained Programming2,757 cited
  • 1997PSPLIB - A project scheduling problem library1,309 cited
  • 2019A survey of hybrid metaheuristics for the resource-constrained project scheduling problem348 cited
  • 2009A genetic algorithm for the preemptive and non-preemptive multi-mode resource-constrained project scheduling problem316 cited
  • 2008Supply chain design under uncertainty using sample average approximation and dual decomposition269 cited
  • 2012Multi-mode resource-constrained discrete time–cost-resource optimization in project scheduling using non-dominated sorting genetic algorithm215 cited
  • 2004Particle swarm optimization-based schemes for resource-constrained project scheduling181 cited
  • 2013A review of methods and algorithms for optimizing construction scheduling148 cited
  • 2018Resource-constrained project scheduling problem: review of past and recent developments148 cited
  • 2011Multi-mode resource-constrained project scheduling using RCPSP and SAT solvers132 cited
  • 2015A purely proactive scheduling procedure for the resource-constrained project scheduling problem with stochastic activity durations127 cited
  • 2019A robust optimization approach for the multi-mode resource-constrained project scheduling problem123 cited
  • 2019Multi-objective multi-mode resource constrained project scheduling problem using Pareto-based algorithms118 cited

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work

2008
Scheduling projects with stochastic activity duration to maximize expected net present value
98 cited
  • 2014Multi-mode resource-constrained project scheduling problems with non-preemptive activity splitting96 cited
  • 2018A tabu search procedure for the resource-constrained project scheduling problem with alternative subgraphs94 cited
  • Cited by

    No citing works inside the corpus for this window.