SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
Construction Law Handbook 2009
0 references·3 citing·14 second hop
Construction Law Handbook 2009 (2009)Construction Law Handbook 2009Transforming project delivery: integrated project delivery (2022)Transforming project delivery…Comparative Study on the Use of Output Specifications for Australian and U.K. PPP/PFI Projects (2013)Comparative Study on the Use …Preallocation of Total Float in the Application of a Critical Path Method Based Construction Contract (2007)Preallocation of Total Float …Review of Psychometric theory (2nd ed.). (1979)Public Private Partnerships: The Worldwide Revolution In Infrastructure Provision And Project Finance (2004)Public-Private Partnerships: Principles of Policy and Finance (2007)Model for predicting the success of public–private partnership infrastructure projects in developing countries: a case of Ghana (2018)STAKEHOLDERS’ PERSPECTIVES ON THE SUCCESS CRITERIA FOR PUBLIC-PRIVATE PARTNERSHIP PROJECTS (2018)Relationships among Value-for-Money Drivers of Public–Private Partnership Infrastructure Projects (2019)Construction Scheduling: Preparation, Liability, and Claims (1991)Total Float Traded as Commodity (1991)FLORA: New Forensic Schedule Analysis Technique (2008)A method for project schedule delay analysis (2018)Wolf-Bird Optimizer (WBO): A novel metaheuristic algorithm for Building Information Modeling-based resource tradeoff (2023)The Strategic Management of Large Engineering Projects: Shaping Institutions, Risks, and Governance (2001)Megaprojects and Risk (2003)Making sense of the multi-party contractual arrangements of project partnering, project alliancing and integrated project delivery (2012)
this work references cited by second hop

References

No references inside the corpus for this window.

Cited by

  • 2013Comparative Study on the Use of Output Specifications for Australian and U.K. PPP/PFI Projects43 cited
  • 2007Preallocation of Total Float in the Application of a Critical Path Method Based Construction Contract41 cited
  • 2022Transforming project delivery: integrated project delivery31 cited

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work