SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
A comparison of different methods for estimating the average inventory level in a (Q,R) system with backorders
10 references·0 citing·34 second hop
A comparison of different methods for estimating the average inventory level in a (Q,R) system with backorders (2002)A comparison of different methods for est…An integrated introduction to spreadsheet and programming skills for operational research students (2000)An integrated introduction to…Inventory management and production planning and scheduling (1999)Inventory management and prod…Tractable (Q, R) Heuristic Models for Constrained Service Levels (1997)Tractable (Q, R) Heuristic Mo…On Properties of Stochastic Inventory Systems (1992)On Properties of Stochastic I…New algorithms for (Q,r) systems with complete backordering using a fill‐rate criterion (1985)New algorithms for (Q,r) syst…Simple approximations for the reorder point in periodic and continuous review (s, S) inventory systems with service level constraints (1984)Simple approximations for the…Operations Research in Production Planning, Scheduling and Inventory Control. (1975)Operations Research in Produc…A comparison and evaluation of approximate continuous review inventory model (1975)A comparison and evaluation o…Principles of Operations Research. (1970)Principles of Operations Rese…Analysis of Inventory Systems. (1964)Analysis of Inventory Systems.Decision Systems for Inventory Management and Production Planning (1979)Approximating a Point Process by a Renewal Process, I: Two Basic Methods (1982)A combined forecast—inventory control procedure for spare parts (2000)Inventory models with minimal service level constraints (2001)Comparative analysis on value of information sharing in supply chains (2005)Planning Production, Inventories, and Work Force. (1962)The performance of two popular service measures on management effectiveness in inventory control (1999)Achieving a Long-Term Service Target with Periodic Demand Signals: A Newsvendor Framework (2010)Periodic review inventory systems with a service level criterion (2013)Principles of Operations Research. (1970)Approximation techniques for several stochastic inventory models (1981)RETRACTED: A comparison of different methods for estimating the average inventory level in a (Q,R) system with backorders (2002)Shortage decision policies for a fluid production model with MAP arrivals (2016)The Fifth Discipline (1990)Timetabling County Cricket Fixtures Using a Form of Tabu Search (1994)A fair method for resetting the target in interrupted one-day cricket matches (1998)An approximate method for generating symmetric random variables (1972)Enhancement of Theory of Constraints replenishment using a novel generic buffer management procedure (2003)On the strategy of supply chain collaboration based on dynamic inventory target level management: A theory of constraint perspective (2012)Inventory policies and safety stock optimization for supply chain planning (2018)The single-period (news-vendor) problem: literature review and suggestions for future research (1999)Flow Coordination and Information Sharing in Supply Chains: Review, Implications, and Directions for Future Research (2002)Supply Chain Coordination with Contracts (2003)A JOINT ECONOMIC‐LOT‐SIZE MODEL FOR PURCHASER AND VENDOR (1986)Lot Sizing with Random Yields: A Review (1995)Customer-Order Information, Leadtimes, and Inventories (1995)An Inventory-Location Model: Formulation, Solution Algorithm and Computational Results (2002)A Joint Location-Inventory Model (2003)An Introductory Tutorial on Stochastic Linear Programming Models (1999)Integrated single vendor single buyer model with stochastic demand and variable lead time (2003)What Can Be Learned from Classical Inventory Models? A Cross-Industry Exploratory Investigation (2007)Concepts for advanced simulation methodologies (1979)Distributed decision making––a unified approach (2003)A robust optimization model for multi-site production planning problem in an uncertain environment (2006)
this work references cited by second hop

References

  • 1999Inventory management and production planning and scheduling2,787 cited
  • 1964Analysis of Inventory Systems.2,345 cited
  • 1975Operations Research in Production Planning, Scheduling and Inventory Control.585 cited
  • 1970Principles of Operations Research.347 cited
  • 1992On Properties of Stochastic Inventory Systems272 cited
  • 1984Simple approximations for the reorder point in periodic and continuous review (s, S) inventory systems with service level constraints127 cited
  • 1997Tractable (Q, R) Heuristic Models for Constrained Service Levels59 cited
  • 1985New algorithms for (Q,r) systems with complete backordering using a fill‐rate criterion39 cited
  • 1975A comparison and evaluation of approximate continuous review inventory model25 cited
  • 2000An integrated introduction to spreadsheet and programming skills for operational research students11 cited

Cited by

No citing works inside the corpus for this window.

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work