SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
Time and Cost Performance in Construction Projects in Southern and Central Regions of Peninsular Malaysia
0 references·7 citing·25 second hop
Time and Cost Performance in Construction Projects in Southern and Central Regions of Peninsular Malaysia (2012)Time and Cost Performance in Construction…CAUSES AND EFFECTS OF POOR COMMUNICATION IN THE CONSTRUCTION INDUSTRY IN THE MENA REGION (2022)CAUSES AND EFFECTS OF POOR CO…A Study on Factors Causing Cost Overrun of Construction Projects in Sarawak, Malaysia (2020)A Study on Factors Causing Co…Exploring the best ANN model based on four paradigms to predict delay and cost overrun percentages of highway projects (2019)Exploring the best ANN model …Construction Delays in Indonesia, Malaysia, Thailand, and Vietnam (2019)Construction Delays in Indone…Improving Project Budget Estimation Accuracy and Precision by Analyzing Reserves for Both Identified and Unidentified Risks (2018)Improving Project Budget Esti…Analysis of schedule deviations in road construction projects and the effects of project physical characteristics (2017)Analysis of schedule deviatio…Effects of Construction Projects Schedule Overruns: A Case of the Gauteng Province, South Africa (2015)Effects of Construction Proje…Survey Methods in Social Investigation. (1958)Causes of delay in large construction projects (2006)Causes and effects of delays in Malaysian construction industry (2007)Organizational and economic feasibility of construction projects through the perfection of construction scheduling (2017)Deep Multilayer Perceptron Neural Network for the Prediction of Iranian Dam Project Delay Risks (2023)Delay in Decision-Making Affecting Construction Projects: A Sustainable Decision-Making Model for Mega Projects (2023)Cost escalation and schedule delays in road construction projects in Zambia (2008)Underestimating Costs in Public Works Projects: Error or Lie? (2002)A guide to the project management body of knowledge (PMBOK guide) (2004)Impact of aleatoric, stochastic and epistemic uncertainties on project cost contingency reserves (2022)Robust and resilience budget allocation for projects with a risk-averse approach: A case study in healthcare projects (2022)Factors influencing construction time and cost overruns on high-rise projects in Indonesia (1997)Causes of delay and cost overruns in construction of groundwater projects in a developing countries; Ghana as a case study (2003)Infrastructure And Economic Development In Sub-Saharan Africa (2008)Machine learning - based framework for construction delay mitigation (2021)Critical Success Factors for Different Project Objectives (1999)Analysing causal relationships between delay factors in construction projects (2019)Key drivers for adopting design build: A comparative study between project stakeholders (2020)Modeling the Causes and Mitigation Measures for Cost Overruns in Building Construction: The Case of Higher Education Projects (2024)What Causes Cost Overrun in Transport Infrastructure Projects? (2004)Risk factors causing cost overruns in road networks (2022)Modified Mamdani-fuzzy inference system for predicting the cost overrun of construction projects (2023)Evaluating Structural Equation Models with Unobservable Variables and Measurement Error (1981)Using PLS Path Modeling for Assessing Hierarchical Construct Models: Guidelines and Empirical Illustration1 (2009)A primer on partial least squares structural equation modeling (PLS-SEM) (2014)
this work references cited by second hop

References

No references inside the corpus for this window.

Cited by

  • 2015Effects of Construction Projects Schedule Overruns: A Case of the Gauteng Province, South Africa53 cited
  • 2020A Study on Factors Causing Cost Overrun of Construction Projects in Sarawak, Malaysia44 cited
  • 2022CAUSES AND EFFECTS OF POOR COMMUNICATION IN THE CONSTRUCTION INDUSTRY IN THE MENA REGION41 cited
  • 2018Improving Project Budget Estimation Accuracy and Precision by Analyzing Reserves for Both Identified and Unidentified Risks39 cited
  • 2019Construction Delays in Indonesia, Malaysia, Thailand, and Vietnam39 cited
  • 2017Analysis of schedule deviations in road construction projects and the effects of project physical characteristics31 cited
  • 2019Exploring the best ANN model based on four paradigms to predict delay and cost overrun percentages of highway projects30 cited

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work