SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
Capital Budgeting Valuation
0 references·3 citing·15 second hop
Capital Budgeting Valuation (2011)Capital Budgeting ValuationUncertain mean-variance model for dynamic project portfolio selection problem with divisibility (2018)Uncertain mean-variance model…Managerial Private Benefits and Overinvestment (2014)Managerial Private Benefits a…Expanded model of the project portfolio selection problem with divisibility, time profile factors and cardinality constraints (2014)Expanded model of the project…Three Problems in Rationing Capital (1955)Creating project plans to focus product development. (1992)An integrated framework for project portfolio selection (1999)Dynamic assessment modelling for project portfolio benefits (2021)An Extended Model of Dynamic Project Portfolio Selection Problem Considering Synergies between Projects (2022)Theory of the firm: Managerial behavior, agency costs and ownership structure (1976)Agency Costs of Free Cash Flow, Corporate Finance, and Takeovers (1986)Agency costs of free cash flow, corporate finance, and takeovers (1996)Subsidy competition, industrial land price distortions and overinvestment: empirical evidence from China’s manufacturing enterprises (2017)Overinvestment, leverage and financial system liquidity: A challenging approach (2018)Economic Theory and the Construction Industry (1974)Constructing and evaluating balanced portfolios of R&D projects with interactions: A DEA based methodology (2005)Project portfolio selection problems: Two decades review from 1999 to 2019 (2019)Multi-period portfolio selection with mental accounts and realistic constraints based on uncertainty theory (2020)A clustering‐based review on project portfolio optimization methods (2021)
this work references cited by second hop

References

No references inside the corpus for this window.

Cited by

  • 2018Uncertain mean-variance model for dynamic project portfolio selection problem with divisibility44 cited
  • 2014Expanded model of the project portfolio selection problem with divisibility, time profile factors and cardinality constraints37 cited
  • 2014Managerial Private Benefits and Overinvestment23 cited

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work