An optimization model for construction project scheduling by considering CO2 emissions with multi-mode resource constraints under interval-valued fuzzy uncertainty
16 references·1 citing·36 second hopsampled
An optimization model for construction project scheduling by considering CO2 emissions with multi-mode resource constraints under interval-valued fuzzy uncertainty (2022)An optimization model for construction pr…Energy consumption, carbon dioxide emissions, information and communications technology, and gross domestic product in Iranian economic sectors: A panel causality analysis (2018)Energy consumption, carbon di…A tabu search procedure for the resource-constrained project scheduling problem with alternative subgraphs (2018)A tabu search procedure for t…Driving forces of Iran's CO2 emissions from energy consumption: An LMDI decomposition approach (2017)Driving forces of Iran's CO2 …Solving stochastic resource-constrained project scheduling problems by closed-loop approximate dynamic programming (2015)Solving stochastic resource-c…Minimizing the expected makespan of a project with stochastic activity durations under resource constraints (2015)Minimizing the expected makes…Project scheduling with finite or infinite number of activity processing modes – A survey (2010)Project scheduling with finit…A survey of variants and extensions of the resource-constrained project scheduling problem (2009)A survey of variants and exte…Fuzzy critical chain method for project scheduling under resource constraints and uncertainty (2007)Fuzzy critical chain method f…Perspectives in Modern Project Scheduling (2006)Perspectives in Modern Projec…Heuristic Procedures for Reactive Project Scheduling (2006)Heuristic Procedures for Reac…Experimental investigation of heuristics for resource-constrained project scheduling: An update (2005)Experimental investigation of…Project scheduling under uncertainty: Survey and research potentials (2004)Project scheduling under unce…Fuzzy risk analysis based on similarity measures of generalized fuzzy numbers (2003)Fuzzy risk analysis based on …Experimental evaluation of state-of-the-art heuristics for the resource-constrained project scheduling problem (2000)Experimental evaluation of st…The versatile project-based organization: governance and operational control (1999)The versatile project-based o…Resource-constrained project scheduling: Notation, classification, models, and methods (1999)Resource-constrained project …An integrated chance-constrained stochastic model for a preemptive multi-skilled multi-mode resource-constrained project scheduling problem: A case study of building a sports center (2023)An integrated chance-constrai…PSPLIB - A project scheduling problem library (1997)A genetic algorithm for the preemptive and non-preemptive multi-mode resource-constrained project scheduling problem (2009)An updated survey of variants and extensions of the resource-constrained project scheduling problem (2021)Fuzzy sets (1965)Fuzzy Sets and Systems - Theory and Applications (1980)Fuzzy sets (1996)A genetic algorithm-based method for scheduling repetitive construction projects (2009)Six decades of project management research: Thematic trends and future opportunities (2016)A robust optimization approach for the multi-mode resource-constrained project scheduling problem (2019)Critical-Path Planning and Scheduling: Mathematical Basis (1961)Characterization and Generation of a General Class of Resource-Constrained Project Scheduling Problems (1995)On Uncertainty, Ambiguity, and Complexity in Project Management (2002)Multiproject Scheduling with Limited Resources: A Zero-One Programming Approach (1969)Ant colony optimization for resource-constrained project scheduling (2002)A survey of hybrid metaheuristics for the resource-constrained project scheduling problem (2019)Multiple Attribute Decision Making: Methods and Applications (1981)A new approach for fuzzy risk analysis based on similarity measures of generalized fuzzy numbers (2007)Fuzzy risk analysis based on interval-valued fuzzy numbers (2008)Group multi-criteria decision making based upon interval-valued fuzzy numbers: An extension of the MULTIMOORA method (2012)Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation (1996)Robust Discrete Optimization and Its Applications (1997)Robust Discrete Optimization and Its Applications. (1998)Robust and reactive project scheduling: a review and classification of procedures (2004)Energy consumption and economic growth: The case of oil exporting countries (2006)CO2 emissions, energy consumption and economic growth nexus in MENA countries: Evidence from simultaneous equations models (2013)Factors that influence carbon emissions due to energy consumption in China: Decomposition analysis using LMDI (2014)Carbon emissions, the industrial structure and economic growth: Evidence from heterogeneous industries in China (2020)Factors influencing carbon emissions from China's electricity industry: Analysis using the combination of LMDI and K-means clustering (2021)The drivers of declining CO2 emissions trends in developed nations using an extended STIRPAT model: A historical and prospective analysis (2021)Some Tests of Specification for Panel Data: Monte Carlo Evidence and an Application to Employment Equations (1991)Another look at the instrumental variable estimation of error-components models (1995)Initial conditions and moment restrictions in dynamic panel data models (1998)Linking Information Communication Technology, trade globalization index, and CO2 emissions: evidence from advanced panel techniques (2020)Dynamic association between ICT, renewable energy, economic complexity and ecological footprint: Is there any difference between E-7 (developing) and G-7 (developed) countries? (2022)Environmental impact of information and communication technology: Unveiling the role of education in developing countries (2022)Resource-constrained multi-project scheduling: Priority rule performance revisited (2010)
this work references cited by second hop· second hop is a sample of the most-cited connections

References

  • 1999Resource-constrained project scheduling: Notation, classification, models, and methods1,501 cited
  • 2004Project scheduling under uncertainty: Survey and research potentials995 cited
  • 2009A survey of variants and extensions of the resource-constrained project scheduling problem904 cited
  • 2005Experimental investigation of heuristics for resource-constrained project scheduling: An update754 cited
  • 2000Experimental evaluation of state-of-the-art heuristics for the resource-constrained project scheduling problem505 cited
  • 2003Fuzzy risk analysis based on similarity measures of generalized fuzzy numbers427 cited
  • 2018Energy consumption, carbon dioxide emissions, information and communications technology, and gross domestic product in Iranian economic sectors: A panel causality analysis372 cited
  • 2010Project scheduling with finite or infinite number of activity processing modes – A survey282 cited
  • 2017Driving forces of Iran's CO2 emissions from energy consumption: An LMDI decomposition approach272 cited
  • 2007Fuzzy critical chain method for project scheduling under resource constraints and uncertainty201 cited
  • 1999The versatile project-based organization: governance and operational control133 cited
  • 2006Heuristic Procedures for Reactive Project Scheduling123 cited
  • 2015Solving stochastic resource-constrained project scheduling problems by closed-loop approximate dynamic programming118 cited

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work

  • 2006Perspectives in Modern Project Scheduling116 cited
  • 2015Minimizing the expected makespan of a project with stochastic activity durations under resource constraints98 cited
  • 2018A tabu search procedure for the resource-constrained project scheduling problem with alternative subgraphs94 cited
  • Cited by

    • 2023An integrated chance-constrained stochastic model for a preemptive multi-skilled multi-mode resource-constrained project scheduling problem: A case study of building a sports center24 cited