SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
Optimization method of power grid material warehousing and allocation based on multi-level storage system and reinforcement learning
1 references·1 citing·9 second hop
Optimization method of power grid material warehousing and allocation based on multi-level storage system and reinforcement learning (2023)Optimization method of power grid materia…Supplier selection process in an integrated construction materials management model (2014)Supplier selection process in…Demand Forecasting and Allocation Optimization of Green Power Grid Supply Chain Based on Machine Learning Algorithm: A Study Based on the Whole-Process Data of Power Grid Materials (2025)Demand Forecasting and Alloca…Multiple Attribute Decision Making: Methods and Applications (1981)Causes of delay in large construction projects (2006)Multi-criteria decision making approaches for supplier evaluation and selection: A literature review (2009)A supplier selection model for hospitals using a combination of artificial neural network and fuzzy VIKOR (2017)A risk-based integrated decision-making model for green supplier selection (2019)The impact of Engineering, Procurement and Construction (EPC) Phases on Project Performance: A Case of Large-scale Residential Construction Project (2019)Carbon price prediction based on modified wavelet least square support vector machine (2020)Low-carbon strategy, entrepreneurial activity, and industrial structure change: Evidence from a quasi-natural experiment (2023)The impact of climate change on corporate ESG performance: The role of resource misallocation in enterprises (2024)
this work references cited by second hop

References

  • 2014Supplier selection process in an integrated construction materials management model136 cited

Cited by

  • 2025Demand Forecasting and Allocation Optimization of Green Power Grid Supply Chain Based on Machine Learning Algorithm: A Study Based on the Whole-Process Data of Power Grid Materials11 cited

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work