SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
Modified Mamdani-fuzzy inference system for predicting the cost overrun of construction projects
16 references·0 citing·43 second hop
Modified Mamdani-fuzzy inference system for predicting the cost overrun of construction projects (2023)Modified Mamdani-fuzzy inference system f…Machine learning-aided engineering services' cost overruns prediction in high-rise residential building projects: Application of random forest regression (2022)Machine learning-aided engine…Time and cost overruns in the UAE construction industry: a critical analysis (2018)Time and cost overruns in the…Time Delay and Cost Overrun in Qatari Public Construction Projects (2016)Time Delay and Cost Overrun i…Identification and assessment of risk factors affecting construction projects (2015)Identification and assessment…Predicting construction cost overruns using text mining, numerical data and ensemble classifiers (2014)Predicting construction cost …A knowledge-based risk mapping tool for cost estimation of international construction projects (2014)A knowledge-based risk mappin…Developing Fuzzy Enterprise Risk Management Maturity Model for Construction Firms (2013)Developing Fuzzy Enterprise R…Using fuzzy multiple criteria decision making approach to enhance risk assessment for metropolitan construction projects (2012)Using fuzzy multiple criteria…Risk Management in the Construction Industry Using Combined Fuzzy FMEA and Fuzzy AHP (2010)Risk Management in the Constr…Evaluation of Risk Factors Leading to Cost Overrun in Delivery of Highway Construction Projects (2010)Evaluation of Risk Factors Le…A fuzzy approach to construction project risk assessment (2010)A fuzzy approach to construct…Fuzzy Monte Carlo Simulation and Risk Assessment in Construction (2009)Fuzzy Monte Carlo Simulation …Using fuzzy risk assessment to rate cost overrun risk in international construction projects (2007)Using fuzzy risk assessment t…Application of a fuzzy based decision making methodology to construction project risk assessment (2007)Application of a fuzzy based …Causes of delay in large construction projects (2006)Causes of delay in large cons…A fuzzy approach to construction project risk assessment and analysis: construction project risk management system (2001)A fuzzy approach to construct…Fuzzy sets (1965)Multiple Attribute Decision Making: Methods and Applications (1981)Fuzzy sets (1996)Towards a better modelling and assessment of construction risk: Insights from a literature review (2013)Project Complexity and Risk Management (ProCRiM): Towards modelling project complexity driven risk paths in construction projects (2016)Fuzzy-set qualitative comparative analysis (fsQCA) in business and management research: A contemporary overview (2022)A Guide to the project management body of knowledge (1996)A rough TOPSIS Approach for Failure Mode and Effects Analysis in Uncertain Environments (2013)A novel multiple-criteria decision-making-based FMEA model for risk assessment (2018)Risk Assessment Using a New Consulting Process in Fuzzy AHP (2019)The Varimax Criterion for Analytic Rotation in Factor Analysis (1958)Group Techniques for Program Planning: A Guide to Nominal Group and Delphi Processes (1976)Relation of sample size to the stability of component patterns. (1988)Preliminary Study on Causative Factors Leading to Construction Cost Overrun (2011)From Construction Megaproject Management to Complex Project Management: Bibliographic Analysis (2013)Risk Assessment and Allocation in Highway Construction Projects in the UAE (2015)Risk Management and Construction (1993)Large engineering project risk management using a Bayesian belief network (2008)Risk assessment model selection in construction industry (2010)A simulation-based risk network model for decision support in project risk management (2011)A scaling method for priorities in hierarchical structures (1977)The Analytic Hierarchy Process (1985)Current research trends and application areas of fuzzy and hybrid methods to the risk assessment of construction projects (2017)A review of occupational health and safety risk assessment approaches based on multi-criteria decision-making methods and their fuzzy versions (2018)A review of artificial intelligence based risk assessment methods for capturing complexity-risk interdependencies (2019)Modelling global risk factors affecting construction cost performance (2003)Energy investment risk assessment for nations along China’s Belt & Road Initiative (2017)A fuzzy extension of Saaty's priority theory (1983)Fuzzy hierarchical analysis (1985)Applications of the extent analysis method on fuzzy AHP (1996)Fuzzy analytic hierarchy process with interval type-2 fuzzy sets (2014)Fuzzy Multicriteria Decision-Making: A Literature Review (2015)A novel spherical fuzzy analytic hierarchy process and its renewable energy application (2019)Regularization Neural Network for Construction Cost Estimation (1998)A Hybrid MCDM Technique for Risk Management in Construction Projects (2018)Delays and cost increases in the construction of private residential projects in Kuwait (2005)Critical Factors Affecting Schedule Performance: Evidence from Indian Construction Projects (2006)Significant factors causing delay in the UAE construction industry (2006)DEMATEL-ANP Risk Assessment in Oil and Gas Construction Projects (2017)The Current Risk Management Practices and Knowledge in the Construction Industry (2022)Causes and effects of delays in Malaysian construction industry (2007)Delay and cost overruns in Vietnam large construction projects: A comparison with other selected countries (2008)Analysing factors affecting delays in Indian construction projects (2011)
this work references cited by second hop

References

  • 2006Causes of delay in large construction projects1,721 cited
  • 2007Application of a fuzzy based decision making methodology to construction project risk assessment537 cited
  • 2010A fuzzy approach to construction project risk assessment464 cited
  • 2007Using fuzzy risk assessment to rate cost overrun risk in international construction projects374 cited
  • 2010Risk Management in the Construction Industry Using Combined Fuzzy FMEA and Fuzzy AHP341 cited
  • 2001A fuzzy approach to construction project risk assessment and analysis: construction project risk management system322 cited
  • 2010Evaluation of Risk Factors Leading to Cost Overrun in Delivery of Highway Construction Projects242 cited
  • 2009Fuzzy Monte Carlo Simulation and Risk Assessment in Construction204 cited
  • 2015Identification and assessment of risk factors affecting construction projects201 cited
  • 2012Using fuzzy multiple criteria decision making approach to enhance risk assessment for metropolitan construction projects199 cited
  • 2018Time and cost overruns in the UAE construction industry: a critical analysis173 cited
  • 2014Predicting construction cost overruns using text mining, numerical data and ensemble classifiers164 cited
  • 2016Time Delay and Cost Overrun in Qatari Public Construction Projects140 cited
  • 2022Machine learning-aided engineering services' cost overruns prediction in high-rise residential building projects: Application of random forest regression

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work

132 cited
  • 2013Developing Fuzzy Enterprise Risk Management Maturity Model for Construction Firms131 cited
  • 2014A knowledge-based risk mapping tool for cost estimation of international construction projects127 cited
  • Cited by

    No citing works inside the corpus for this window.