SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
Optimizing time, cost, environmental impact, and client satisfaction in sustainable construction projects using LHS-NSGA-III: a multi-objective approach
16 references·1 citing·38 second hop
Optimizing time, cost, environmental impact, and client satisfaction in sustainable construction projects using LHS-NSGA-III: a multi-objective approach (2024)Optimizing time, cost, environmental impa…Development of time–cost trade-off optimization model for construction projects with MOPSO technique (2024)Development of time–cost trad…Construction time–cost–resources–quality trade-off optimization using NSGA-III (2023)Construction time–cost–resour…Fuzzy-multi-mode Resource-constrained Discrete Time-cost-resource Optimization in Project Scheduling Using ENSCBO (2021)Fuzzy-multi-mode Resource-con…Development of Multi-Objective Scheduling Model for Construction Projects Using Opposition-Based NSGA III (2021)Development of Multi-Objectiv…Latin hypercube sampling-based NSGA-III optimization model for multimode resource constrained time–cost–quality–safety trade-off in construction projects (2020)Latin hypercube sampling-base…Integrating Quality and Safety in Construction Scheduling Time-Cost Trade-Off Model (2020)Integrating Quality and Safet…A robust time-cost-quality-energy-environment trade-off with resource-constrained in project management: A case study for a bridge construction project (2020)A robust time-cost-quality-en…Time–cost–quality trade-off analysis for planning construction projects (2019)Time–cost–quality trade-off a…Identifying and Measuring Engineering, Procurement, and Construction (EPC) Key Performance Indicators and Management Strategies (2019)Identifying and Measuring Eng…A many-objective optimization model for construction scheduling (2019)A many-objective optimization…Time-Cost Trade-off Optimization of Construction Projects using Teaching Learning Based Optimization (2018)Time-Cost Trade-off Optimizat…Resource-constrained project scheduling problem: review of past and recent developments (2018)Resource-constrained project …Overall multiobjective optimization of construction projects scheduling using particle swarm (2016)Overall multiobjective optimi…Fuzzy Resource Constraint Project Scheduling Problem Using CBO and CSS Algorithms (2016)Fuzzy Resource Constraint Pro…Multi-mode resource-constrained discrete time–cost-resource optimization in project scheduling using non-dominated sorting genetic algorithm (2012)Multi-mode resource-constrain…A Comparison of Three Methods for Selecting Values of Input Variables in the Analysis of Output from a Computer Code (1979)A Comparison of Three Methods…A user-centric machine learning framework for predicting multi-modal accessibility in transit-oriented development zones for sustainable urban construction in tier-2 Indian cities (2026)A user-centric machine learni…Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation (1996)Heuristic Algorithms for the Resource-Constrained Project Scheduling Problem: Classification and Computational Analysis (1999)Experimental investigation of heuristics for resource-constrained project scheduling: An update (2005)A novel Multiple Objective Symbiotic Organisms Search (MOSOS) for time–cost–labor utilization tradeoff problem (2015)Analysis of interacting uncertainties in on-site and off-site activities: Implications for hybrid construction (2016)Optimization of Resource Allocation and Leveling Using Genetic Algorithms (1999)Applying a Genetic Algorithm-Based Multiobjective Approach for Time-Cost Optimization (2004)Time-Cost-Quality Trade-Off Analysis for Highway Construction (2005)Multi-objective multi-mode resource-constrained project scheduling with fuzzy activity durations in prefabricated building construction (2021)Activity networks: Project planning and control by network models (1977)Fuzzy sets (1996)A survey of variants and extensions of the resource-constrained project scheduling problem (2009)The sustainable project management: A review and future possibilities (2018)A mathematical model for project scheduling and material ordering problem with sustainability considerations: A case study in Iran (2019)Using Genetic Algorithms to Solve Construction Time-Cost Trade-Off Problems (1997)A novel multi criteria decision making model for optimizing time–cost–quality trade-off problems in construction projects (2014)Optimizing time–cost in generalized construction projects using multiple-objective social group optimization and multi-criteria decision-making methods (2020)A guide to the project management body of knowledge (PMBOK guide) (2004)Time-cost-quality-environmental impact trade-off resource-constrained project scheduling problem with DEA approach (2020)Resource-constrained time–cost-quality-energy-environment tradeoff problem by considering blockchain technology, risk and robustness: a case study of healthcare project (2022)Time-cost trade-off optimization model for retrofitting planning projects using MOGA (2024)Multiobjective Decision Making: Theory and Methodology (1983)Robust solutions of Linear Programming problems contaminated with uncertain data (2000)A robust optimization approach to closed-loop supply chain network design under uncertainty (2010)Fuzzy Detection System for Rumors Through Explainable Adaptive Learning (2021)Robust optimization of risk-aware, resilient and sustainable closed-loop supply chain network design with Lagrange relaxation and fix-and-optimize (2021)Risk Factors That Lead to Time and Cost Overruns of Building Projects in Saudi Arabia (2022)Analysing factors affecting delays in Indian construction projects (2011)Discrete OBNSGA III method-based robust multi-objective scheduling model for civil construction projects (2023)Modelling the resource constrained time-cost-quality-safety risk-environmental impact trade-off using opposition-based NSGA III (2023)Optimizing construction time, cost, and quality: a hybrid AHP-NSGA-III model for enhanced multi-objective decision making (2024)Critical-path planning and scheduling (1959)NSGA-III based optimization model for balancing time, cost, and quality in resource-constrained retrofitting projects (2024)Optimizing trade-off between time, cost, and carbon emissions in construction using NSGA-III: an integrated approach for sustainable development (2024)Development of discrete opposition-based NSGA-III model for optimizing trade-off between discrete time, cost, and resource in construction projects (2024)Importance measures in global sensitivity analysis of nonlinear models (1996)Latin hypercube sampling and the propagation of uncertainty in analyses of complex systems (2003)Adaptive sparse polynomial chaos expansion based on least angle regression (2010)
this work references cited by second hop

References

  • 1979A Comparison of Three Methods for Selecting Values of Input Variables in the Analysis of Output from a Computer Code3,766 cited
  • 2012Multi-mode resource-constrained discrete time–cost-resource optimization in project scheduling using non-dominated sorting genetic algorithm215 cited
  • 2018Resource-constrained project scheduling problem: review of past and recent developments148 cited
  • 2020A robust time-cost-quality-energy-environment trade-off with resource-constrained in project management: A case study for a bridge construction project141 cited
  • 2018Time-Cost Trade-off Optimization of Construction Projects using Teaching Learning Based Optimization119 cited
  • 2020Latin hypercube sampling-based NSGA-III optimization model for multimode resource constrained time–cost–quality–safety trade-off in construction projects112 cited
  • 2019Time–cost–quality trade-off analysis for planning construction projects102 cited
  • 2016Overall multiobjective optimization of construction projects scheduling using particle swarm90 cited
  • 2024Development of time–cost trade-off optimization model for construction projects with MOPSO technique82 cited
  • 2020Integrating Quality and Safety in Construction Scheduling Time-Cost Trade-Off Model75 cited
  • 2019A many-objective optimization model for construction scheduling74 cited
  • 2023Construction time–cost–resources–quality trade-off optimization using NSGA-III70 cited
  • 2021Fuzzy-multi-mode Resource-constrained Discrete Time-cost-resource Optimization in Project Scheduling Using ENSCBO

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work

69 cited
  • 2019Identifying and Measuring Engineering, Procurement, and Construction (EPC) Key Performance Indicators and Management Strategies60 cited
  • 2016Fuzzy Resource Constraint Project Scheduling Problem Using CBO and CSS Algorithms59 cited
  • 2021Development of Multi-Objective Scheduling Model for Construction Projects Using Opposition-Based NSGA III59 cited
  • Cited by

    • 2026A user-centric machine learning framework for predicting multi-modal accessibility in transit-oriented development zones for sustainable urban construction in tier-2 Indian cities4 cited