Challenges in Electrical Infrastructure Permitting: A Case Study of Substation Development in South Sumatra
1 references·1 citing·4 second hop
Challenges in Electrical Infrastructure Permitting: A Case Study of Substation Development in South Sumatra (2025)Challenges in Electrical Infrastructure P…Risk management of hydropower projects for sustainable development: a review (2020)Risk management of hydropower…Legal Dynamics in the Permitting Process for Extra High Voltage Overhead Line Development in South Sumatra (2025)Legal Dynamics in the Permitt…A Guide to the project management body of knowledge (1996)Global threats to human water security and river biodiversity (2010)Economic and Political Weekly (2017)The current and future states of MCDM methods in sustainable supply chain risk assessment (2024)
this work references cited by second hop

References

  • 2020Risk management of hydropower projects for sustainable development: a review94 cited

Cited by

  • 2025Legal Dynamics in the Permitting Process for Extra High Voltage Overhead Line Development in South Sumatra9 cited