SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
Critical path planning under uncertainty
5 references·5 citing·33 second hop
Critical path planning under uncertainty (1985)Critical path planning under uncertaintyDesigning approximation schemes for stochastic optimization problems, in particular for stochastic programs with recourse (1986)Designing approximation schem…Introduction to Operations Research. (1968)Introduction to Operations Re…Introduction to Operations Research (1968)Introduction to Operations Re…Programming Under Uncertainty: The Equivalent Convex Program (1966)Programming Under Uncertainty…Critical-Path Planning and Scheduling: Mathematical Basis (1961)Critical-Path Planning and Sc…Gas and oil project time-cost-quality tradeoff: Integrated stochastic and fuzzy multi-objective optimization applying a memetic, nondominated, sorting algorithm (2017)Gas and oil project time-cost…Modeling project time–cost trade-off in fuzzy random environment (2014)Modeling project time–cost tr…A genetic algorithm-based optimizing approach for project time-cost trade-off with uncertain measure (2014)A genetic algorithm-based opt…Optimization models and a GA-based algorithm for stochastic time-cost trade-off problem (2009)Optimization models and a GA-…An effective methodology for the stochastic project compression problem (2007)An effective methodology for …Chance-Constrained Programming (1959)Resource-Constrained Project Scheduling with Time-Resource Tradeoffs: The Nonpreemptive Case (1982)A Multiperiod Multiobjective Portfolio Selection Model With Fuzzy Random Returns for Large Scale Securities Data (2020)Using Genetic Algorithms to Solve Construction Time-Cost Trade-Off Problems (1997)Project-Scheduling Problem With Random Time-Dependent Activity Duration Times (2010)Network analysis algorithm for the solution of discrete time-cost trade-off problem (2016)Project crashing using a fuzzy multi-objective model considering time, cost, quality and risk under fast tracking technique: A case study (2018)Activity networks: Project planning and control by network models (1977)Characterization and Generation of a General Class of Resource-Constrained Project Scheduling Problems (1995)Project scheduling under uncertainty: Survey and research potentials (2004)Project scheduling with finite or infinite number of activity processing modes – A survey (2010)Application of a Technique for Research and Development Program Evaluation (1959)Critical-path planning and scheduling (1959)An integrated survey of deterministic project scheduling (2001)On the Solution of Two-stage Linear Programs under Uncertainty (1961)Stochastic models and methods of optimization (1976)A Solution Method for Multistage Stochastic Programs with Recourse with Application to an Energy Investment Problem (1980)A disaggregation algorithm for the optimization of stochastic planning models (1997)A Network Flow Computation for Project Cost Curves (1961)Multiple Objective Social Group Optimization for Time–Cost–Quality–Carbon Dioxide in Generalized Construction Projects (2021)Wolf-Bird Optimizer (WBO): A novel metaheuristic algorithm for Building Information Modeling-based resource tradeoff (2023)Stochastic Linear Programming (1976)The value of the stochastic solution in stochastic linear programs with fixed recourse (1982)Monte Carlo (importance) sampling within a benders decomposition algorithm for stochastic linear programs (1992)Minimax analysis of stochastic problems (2002)Stochastic Linear Programming (2010)Robust sample average approximation (2017)A Health-Status Index and its Application to Health-Services Outcomes (1970)A game theory approach to measuring the performance reliability of transport networks (2000)The total cost of logistics in supplier selection, under conditions of multiple sourcing, multiple criteria and capacity constraint (2001)Determining Optimal Police Patrol Areas with Maximal Covering and Backup Covering Location Models (2007)An Anytime Algorithm for Optimal Coalition Structure Generation (2009)Deep Uncertainty (2013)
this work references cited by second hop

References

  • 1968Introduction to Operations Research3,405 cited
  • 1968Introduction to Operations Research.1,082 cited
  • 1961Critical-Path Planning and Scheduling: Mathematical Basis902 cited
  • 1986Designing approximation schemes for stochastic optimization problems, in particular for stochastic programs with recourse252 cited
  • 1966Programming Under Uncertainty: The Equivalent Convex Program149 cited

Cited by

  • 2009Optimization models and a GA-based algorithm for stochastic time-cost trade-off problem56 cited
  • 2017Gas and oil project time-cost-quality tradeoff: Integrated stochastic and fuzzy multi-objective optimization applying a memetic, nondominated, sorting algorithm40 cited
  • 2014A genetic algorithm-based optimizing approach for project time-cost trade-off with uncertain measure37 cited
  • 2007An effective methodology for the stochastic project compression problem37 cited
  • 2014Modeling project time–cost trade-off in fuzzy random environment35 cited

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work