SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
Proactive Approach for Reducing Non-Value Adding Activities Due to Time-Space Conflicts
6 references·0 citing·20 second hop
Proactive Approach for Reducing Non-Value Adding Activities Due to Time-Space Conflicts (1998)Proactive Approach for Reducing Non-Value…SCaRC: Space-Constrained Resource-Constrained Scheduling System (1997)SCaRC: Space-Constrained Reso…Modeling Work Space to Schedule Repetitive Floors in Multistory Buildings (1994)Modeling Work Space to Schedu…Interaction between Subcycles: One Key to Improved Methods (1993)Interaction between Subcycles…Time Space Scheduling Method (1982)Time Space Scheduling MethodConstruction Planning—Beyond the Critical Path (1980)Construction Planning—Beyond …VPM Scheduling for High-Rise Buildings (1975)VPM Scheduling for High-Rise …Normal Accidents: Living with High Risk Technologies (1985)Productivity improvement in construction (1988)The machine that changed the world (1992)Competing Construction Management Paradigms (2003)Role of Inventory Buffers in Construction Labor Performance (2005)Investigating the relationship between planning reliability and project performance (2008)HVLS: Horizontal and Vertical Logic Scheduling for Multistory Projects (1994)Object-Oriented Scheduling for Repetitive Projects with Soft Logics (2005)Schedule optimization for scattered repetitive projects (2021)New Generation of Planning Structures (1993)Resource-driven scheduling of repetitive activities (1998)Time/cost optimization using hybrid evolutionary algorithm in construction project scheduling (2008)Formal Development of Line‐of‐Balance Technique (1990)Work Continuity Constraints in Project Scheduling (2005)Optimizing linear project scheduling with multi-skilled crews (2012)Criticism of CPM for Project Planning Analysis (1984)Comparison of Linear Scheduling Model and Repetitive Scheduling Method (2003)Productivity Scheduling Method: Linear Schedule Analysis with Singularity Functions (2009)Improvement Algorithm for Limited Space Scheduling (2001)Critical Space Analysis (2006)
this work references cited by second hop

References

  • 1980Construction Planning—Beyond the Critical Path123 cited
  • 1993Interaction between Subcycles: One Key to Improved Methods120 cited
  • 1994Modeling Work Space to Schedule Repetitive Floors in Multistory Buildings114 cited
  • 1975VPM Scheduling for High-Rise Buildings107 cited
  • 1982Time Space Scheduling Method96 cited
  • 1997SCaRC: Space-Constrained Resource-Constrained Scheduling System65 cited

Cited by

No citing works inside the corpus for this window.

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work