Multiple-Project Scheduling with Controllable Project Duration and Hard Resource Constraint: Some Solvable Cases
6 references·0 citing·27 second hop
Multiple-Project Scheduling with Controllable Project Duration and Hard Resource Constraint: Some Solvable Cases (2001)Multiple-Project Scheduling with Controll…Resource-constrained project scheduling: Notation, classification, models, and methods (1999)Resource-constrained project …Resource-constrained project scheduling: A survey of recent developments (1998)Resource-constrained project …Resource-constrained multi-project scheduling with tardy costs: Comparing myopic, bottleneck, and resource pricing heuristics (1993)Resource-constrained multi-pr…Resource Allocation Problems: Algorithmic Approaches (1989)Resource Allocation Problems:…Resource-Constrained Project Scheduling with Time-Resource Tradeoffs: The Nonpreemptive Case (1982)Resource-Constrained Project …Multiobjective network scheduling with efficient use of renewable and nonrenewable resources (1981)Multiobjective network schedu…Multiproject Scheduling with Limited Resources: A Zero-One Programming Approach (1969)Characterization and Generation of a General Class of Resource-Constrained Project Scheduling Problems (1995)PSPLIB - A project scheduling problem library (1997)Experimental evaluation of state-of-the-art heuristics for the resource-constrained project scheduling problem (2000)An integrated survey of deterministic project scheduling (2001)A new efficient simulated annealing algorithm for the resource-constrained project scheduling problem and its multiple mode version (2003)Problems and methods with multiple objective functions (1971)Project Scheduling under Resource Constraints—Historical Review and Categorization of Procedures (1973)An Efficient Integer Programming Algorithm with Network Cuts for Solving Resource-Constrained Scheduling Problems (1978)Hierarchical models for multi-project planning and scheduling (1993)NONPREEMPTIVE MULTI-MODE RESOURCE-CONSTRAINED PROJECT SCHEDULING (1993)Fuzzy project scheduling system for software development (1994)A Comparison of Heuristic and Optimum Solutions in Resource-Constrained Project Scheduling (1975)Multi-Project Scheduling: Categorization of Heuristic Rules Performance (1982)Analysis of the characteristics of projects in diverse industries (1998)A heuristic solution framework for the resource constrained (multi-)project scheduling problem with sequence-dependent transfer times (2008)Simulation-Based Multiagent Approach for Scheduling Modular Construction (2012)Activity networks: Project planning and control by network models (1977)A Comparison of Exact Approaches for Solving the Multiple Constrained Resource, Project Scheduling Problem (1984)A survey on the resource-constrained project scheduling problem (1995)Pluralism in Project Management: Navigating the Crossroads of Specialization and Fragmentation (2010)Ant colony optimization for resource-constrained project scheduling (2002)On Uncertainty, Ambiguity, and Complexity in Project Management (2002)A survey of variants and extensions of the resource-constrained project scheduling problem (2009)Decentralized Information Processing in the Theory of Organizations (1999)Dynamics of bid optimization in online advertisement auctions (2007)Heuristic method for robust optimization model for green closed-loop supply chain network design of perishable goods (2019)
this work references cited by second hop

References

  • 1999Resource-constrained project scheduling: Notation, classification, models, and methods1,501 cited
  • 1989Resource Allocation Problems: Algorithmic Approaches619 cited
  • 1998Resource-constrained project scheduling: A survey of recent developments562 cited
  • 1982Resource-Constrained Project Scheduling with Time-Resource Tradeoffs: The Nonpreemptive Case456 cited
  • 1981Multiobjective network scheduling with efficient use of renewable and nonrenewable resources144 cited
  • 1993Resource-constrained multi-project scheduling with tardy costs: Comparing myopic, bottleneck, and resource pricing heuristics126 cited