SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
THE EFFECTIVENESS OF HIGH-OCCUPANCY VEHICLE FACILITIES
0 references·4 citing·12 second hop
THE EFFECTIVENESS OF HIGH-OCCUPANCY VEHICLE FACILITIES (1988)THE EFFECTIVENESS OF HIGH-OCCUPANCY VEHIC…Suggested Procedures for Evaluating the Effectiveness of Freeway HOV Facilities (2018)Suggested Procedures for Eval…EFFECTS OF CHANGING HOV LANE OCCUPANCY REQUIREMENTS: EL MONTE BUSWAY CASE STUDY (2002)EFFECTS OF CHANGING HOV LANE …Systems‐Level Evaluation of Automated Urban Freeways (1994)Systems‐Level Evaluation of A…INTERNATIONAL HIGH-OCCUPANCY VEHICLE FACILITIES (1992)INTERNATIONAL HIGH-OCCUPANCY …A Goals-Achievement Matrix for Evaluating Alternative Plans (1968)Performance evaluation for bus transit (1985)Urban public transportation systems and technology (1987)High-Occupancy Vehicle Monitoring and Evaluation Framework (1999)Operating High-Occupancy Vehicle Lanes: Issues for Consideration (2000)Telematics-Based Traffic Law Enforcement and Network Management System for Connected Vehicles (2021)Transportation demand analysis (1983)Discrete Choice Analysis (1985)Cities and automobile dependence : a sourcebook (1991)A DESCRIPTION OF HIGH-OCCUPANCY VEHICLE FACILITIES IN NORTH AMERICA (1990)A New Approach to HOV Entry Requirements: MassHighway’s 3+ /Limited 2+ Sticker Program (1998)JANE'S URBAN TRANSPORT SYSTEMS 1985 (1985)
this work references cited by second hop

References

No references inside the corpus for this window.

Cited by

  • 2018Suggested Procedures for Evaluating the Effectiveness of Freeway HOV Facilities14 cited
  • 1994Systems‐Level Evaluation of Automated Urban Freeways6 cited
  • 2002EFFECTS OF CHANGING HOV LANE OCCUPANCY REQUIREMENTS: EL MONTE BUSWAY CASE STUDY4 cited
  • 1992INTERNATIONAL HIGH-OCCUPANCY VEHICLE FACILITIES4 cited

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work