SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
Traffic forecasting risk study update 2005: through ramp-up and beyond
0 references·8 citing·24 second hop
Traffic forecasting risk study update 2005: through ramp-up and beyond (2005)Traffic forecasting risk study update 200…Impact of new passenger rail stations on ridership demand and passenger characteristics: Hiawatha service case study (2020)Impact of new passenger rail …Anticipating vehicle traffic increase on improved inter-urban roads: evidence from three decades of transport projects in developing regions (2020)Anticipating vehicle traffic …Financing of public private partnerships: Transactional evidence from Australian toll roads (2017)Financing of public private p…Private concession contracts for toll roads in Spain: analysis and recommendations (2010)Private concession contracts …Post-construction evaluation of traffic forecast accuracy (2010)Post-construction evaluation …Patronage Ramp-Up Analysis Model Using a Heuristic F -Test (2010)Patronage Ramp-Up Analysis Mo…Understanding and Accommodating Risk and Uncertainty in Toll Road Projects (2009)Understanding and Accommodati…Actual vs. Forecasted Toll Usage: A Case Study Review (2009)Actual vs. Forecasted Toll Us…What Causes Cost Overrun in Transport Infrastructure Projects? (2004)How (In)accurate Are Demand Forecasts in Public Works Projects?: The Case of Transportation (2005)Risk allocation in the private provision of public infrastructure (2006)Empirical Evidence for Renegotiation of PPP Contracts in the Road Sector (2014)Understanding pitfalls in the application of PPPs in transport infrastructure in Portugal (2015)Efficiency Assessment of Public-Private Partnership (PPP) Projects: The Case of Russia (2018)Twenty-one sources of error and bias in transport project appraisal (1998)RETRACTED: Inaccuracy in Traffic Forecasts (2005)Ridership Ramp-Up? Initial Ridership Variation on New Rail Transit Projects (2019)Are public transit investments based on accurate forecasts? An analysis of the improving trend of transit ridership forecasts in the United States (2024)Megaprojects and Risk (2003)Mega-projects: the changing politics of urban public investment (2004)Stability analysis of activity-based models: case study of the Tel Aviv transportation model (2014)The propagation of uncertainty through travel demand models: An exploratory analysis (2002)A Bivariate Multinomial Probit Model for Trip Scheduling: Bayesian Analysis of the Work Tour (2012)Evaluation of a Strategic Road Pricing Scheme Accounting for Day-to-Day and Long-Term Demand Uncertainty (2014)Risk management by SPV partners in toll road public private partnerships (2018)Principles of Project Finance (2002)Error and optimism bias in toll road traffic forecasts (2009)Still Stuck in Traffic: Coping with Peak-Hour Traffic Congestion (2004)Empirical evidence on induced traffic (1996)Road Traffic Demand Elasticity Estimates: A Review (2004)Risk Analysis of Traffic and Revenue Forecasts for Road Investment Projects (1998)Analysis of Route Choice Decisions by Long-Haul Truck Drivers (2005)
this work references cited by second hop

References

No references inside the corpus for this window.

Cited by

  • 2010Private concession contracts for toll roads in Spain: analysis and recommendations56 cited
  • 2009Understanding and Accommodating Risk and Uncertainty in Toll Road Projects39 cited
  • 2017Financing of public private partnerships: Transactional evidence from Australian toll roads37 cited
  • 2020Impact of new passenger rail stations on ridership demand and passenger characteristics: Hiawatha service case study9 cited
  • 2010Post-construction evaluation of traffic forecast accuracy9 cited
  • 2010Patronage Ramp-Up Analysis Model Using a Heuristic F -Test8 cited
  • 2009Actual vs. Forecasted Toll Usage: A Case Study Review8 cited
  • 2020Anticipating vehicle traffic increase on improved inter-urban roads: evidence from three decades of transport projects in developing regions4 cited

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work