SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
Operations management : analysis for decisions
0 references·3 citing·16 second hop
Operations management : analysis for decisions (1972)Operations management : analysis for deci…Economic acceptance sampling plans in complex multi-stage production systems (1992)Economic acceptance sampling …Exponential smoothing: The state of the art (1985)Exponential smoothing: The st…A General Contingency Theory of Management (1977)A General Contingency Theory …The Compound Hypergeometric Distribution and a System of Single Sampling Inspection Plans Based on Prior Distributions and Costs (1960)Allocation of Screening Inspection Effort—A Dynamic-Programming Approach (1964)Statistical Theory of Sampling Inspection by Attributes. (1984)Construction of minimum cost reliability acceptance sampling plans for multistage process (2021)The Social Psychology of Organizations. (1979)The Management of Innovation (1994)The Performance Implications of Fit among Business Strategy, Marketing Organization Structure, and Strategic Behavior (2005)Entrepreneurial orientation and the business performance of SMEs: a quantitative study from the Netherlands (2011)TOWARD A THEORY OF PARADOX: A DYNAMIC EQUILIBRIUM MODEL OF ORGANIZING. (2011)Academy of Management Journal (2013)Forecasting Sales by Exponentially Weighted Moving Averages (1960)Time Series Analysis: Forecasting and Control (1977)Forecasting Economic Time Series (2000)Modeling and Forecasting Vehicular Traffic Flow as a Seasonal ARIMA Process: Theoretical Basis and Empirical Results (2003)Automatic Time Series Forecasting: The forecast Package for R (2008)Forecasting at Scale (2017)
this work references cited by second hop

References

No references inside the corpus for this window.

Cited by

  • 1985Exponential smoothing: The state of the art1,480 cited
  • 1977A General Contingency Theory of Management364 cited
  • 1992Economic acceptance sampling plans in complex multi-stage production systems8 cited

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work