SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
Construction Scheduling: Preparation, Liability, and Claims
0 references·9 citing·41 second hop
Construction Scheduling: Preparation, Liability, and Claims (1991)Construction Scheduling: Preparation, Lia…Investigating Causes of Delay in U.S. Construction Projects. (2017)Investigating Causes of Delay…Analysis Methods in Time-Based Claims (2008)Analysis Methods in Time-Base…An investigation into the use of construction delay and disruption analysis methodologies (2008)An investigation into the use…Preallocation of Total Float in the Application of a Critical Path Method Based Construction Contract (2007)Preallocation of Total Float …Selection of Appropriate Schedule Delay Analysis Method: Analytical Hierarchy Process (AHP) (2006)Selection of Appropriate Sche…Comparative Study of University Courses on Critical-Path Method Scheduling (2006)Comparative Study of Universi…Critical Path Method with Multiple Calendars (2005)Critical Path Method with Mul…Improving existing delay analysis techniques for the establishment of delay liabilities (2004)Improving existing delay anal…“Claimsmanship”: Current Perspective (1993)“Claimsmanship”: Current Pers…Project Management With Cpm, Pert and Precedence Diagramming (1983)Productivity improvement in construction (1988)Earned value in project management (2003)Construction delay analysis techniques (1996)Construction delays in a fast-growing economy: Comparing Thailand with other economies (1996)Factors of Non-Excusable Delays That Influence Contractors' Performance (1998)Significant factors causing delay in the UAE construction industry (2006)Isolated Collapsed But-For Delay Analysis Methodology (2009)Factors influencing the selection of delay analysis methods in construction projects in UAE (2018)Network analysis for planning and scheduling (1970)Construction Project Scheduling (1991)Project Management in Construction: Software Use and Research Directions (2001)A chronographic method for construction project planning (2006)Real-Time Construction Schedule Analysis of Long-Distance Diversion Tunnels Based on Lithological Predictions Using a Markov Process (2014)The Nature of Managerial Work (1974)Case Study Research: Design and Methods (1984)Decisions with Multiple Objectives: Preferences and Value Tradeoffs. (1994)Appropriate delay analysis techniques to analyse delays in road construction projects in Sri Lanka (2016)Design for occupational safety and health: key attributes for organisational capability (2019)Identification and assessment of disruption claim management risks in construction projects: a life cycle-based approach (2022)Building construction cost data (1943)Selecting a delay analysis method in resolving construction claims (2005)A Computerized Method for Delay Risk Assessment Based on Fuzzy Set Theory using MS Project™ (2018)Hybrid fuzzy-system dynamics approach for quantification of the impacts of construction claims (2019)An overview of the analytic hierarchy process and its applications (1990)Analytical hierarchy process (1994)Causes of construction delay: traditional contracts (2002)Designing an integrated AHP based decision support system for supplier selection in automotive industry (2016)Total Float Traded as Commodity (1991)FLORA: New Forensic Schedule Analysis Technique (2008)Construction Law Handbook 2009 (2009)A method for project schedule delay analysis (2018)Wolf-Bird Optimizer (WBO): A novel metaheuristic algorithm for Building Information Modeling-based resource tradeoff (2023)A comparative study of causes of time overruns in Hong Kong construction projects (1997)Causes of delay and cost overruns in construction of groundwater projects in a developing countries; Ghana as a case study (2003)Causes of delay in large construction projects (2006)Factor Analysis of Construction Delays in the U.S. Construction Industry (2017)Major Factors Causing Delay in the Delivery of Manufacturing and Building Projects in Saudi Arabia (2019)A comparative study of machine learning regression models for predicting construction duration (2023)Record keeping for contemporaneous delay analysis: a model for effective event management (2006)Collaborative incentive contracts: stimulating competitive behaviour without competition (2014)
this work references cited by second hop

References

No references inside the corpus for this window.

Cited by

  • 2008Analysis Methods in Time-Based Claims50 cited
  • 1993“Claimsmanship”: Current Perspective43 cited
  • 2017Investigating Causes of Delay in U.S. Construction Projects.41 cited
  • 2007Preallocation of Total Float in the Application of a Critical Path Method Based Construction Contract41 cited
  • 2004Improving existing delay analysis techniques for the establishment of delay liabilities36 cited
  • 2005Critical Path Method with Multiple Calendars31 cited
  • 2008An investigation into the use of construction delay and disruption analysis methodologies29 cited
  • 2006Selection of Appropriate Schedule Delay Analysis Method: Analytical Hierarchy Process (AHP)25 cited
  • 2006Comparative Study of University Courses on Critical-Path Method Scheduling24 cited

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work