SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
A flow-based tabu search algorithm for the RCPSP with transfer times
15 references·7 citing·27 second hop
A flow-based tabu search algorithm for the RCPSP with transfer times (2015)A flow-based tabu search algorithm for th…Project Scheduling with Time Windows and Scarce Resources: Temporal and Resource-Constrained Project Scheduling with Regular and Nonregular Objective Functions (2012)Project Scheduling with Time …A survey of variants and extensions of the resource-constrained project scheduling problem (2009)A survey of variants and exte…Managing and modelling general resource transfers in (multi-)project scheduling (2008)Managing and modelling genera…A heuristic solution framework for the resource constrained (multi-)project scheduling problem with sequence-dependent transfer times (2008)A heuristic solution framewor…Perspectives in Modern Project Scheduling (2006)Perspectives in Modern Projec…Complex Scheduling (2006)Complex SchedulingExperimental investigation of heuristics for resource-constrained project scheduling: An update (2005)Experimental investigation of…Project Scheduling with Time Windows and Scarce Resources (2003)Project Scheduling with Time …Insertion techniques for static and dynamic resource-constrained project scheduling (2003)Insertion techniques for stat…Project Scheduling: A Research Handbook (2002)Project Scheduling: A Researc…Experimental evaluation of state-of-the-art heuristics for the resource-constrained project scheduling problem (2000)Experimental evaluation of st…A polynomial activity insertion algorithm in a multi-resource schedule with cumulative constraints and multiple modes (2000)A polynomial activity inserti…PSPLIB - A project scheduling problem library (1997)PSPLIB - A project scheduling…Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation (1996)Serial and parallel resource-…Semi-active, active, and non-delay schedules for the resource-constrained project scheduling problem (1995)Semi-active, active, and non-…Simultaneous scheduling of multiple construction projects considering supplier selection and material transportation routing (2022)Simultaneous scheduling of mu…New closed-loop approximate dynamic programming for solving stochastic decentralized multi-project scheduling problem with resource transfers (2021)New closed-loop approximate d…Multi-Objective multi-skill resource-constrained project scheduling problem with skill switches: Model and evolutionary approaches (2021)Multi-Objective multi-skill r…A branch-and-bound embedded genetic algorithm for resource-constrained project scheduling problem with resource transfer time of aircraft moving assembly line (2020)A branch-and-bound embedded g…Fuzzy resource-constrained project scheduling with multiple routes: A heuristic solution (2019)Fuzzy resource-constrained pr…A bi-objective robust resource allocation model for the RCPSP considering resource transfer costs (2019)A bi-objective robust resourc…Space-Time Repetitive Project Scheduling Considering Location and Congestion (2018)Space-Time Repetitive Project…Multiproject Scheduling with Limited Resources: A Zero-One Programming Approach (1969)Resource-Constrained Project Scheduling with Time-Resource Tradeoffs: The Nonpreemptive Case (1982)A Branch-and-Bound Procedure for the Multiple Resource-Constrained Project Scheduling Problem (1992)An exact algorithm for project scheduling with multiple modes (1997)Formulation and Tabu Search Algorithm for the Resource Constrained Project Scheduling Problem (2002)Event-based MILP models for resource-constrained project scheduling problems (2009)Ant colony optimization for resource-constrained project scheduling (2002)A genetic algorithm for the preemptive and non-preemptive multi-mode resource-constrained project scheduling problem (2009)An updated survey of variants and extensions of the resource-constrained project scheduling problem (2021)Resource-constrained project scheduling: Notation, classification, models, and methods (1999)An integrated survey of deterministic project scheduling (2001)Project scheduling under uncertainty: Survey and research potentials (2004)Resource-constrained multi-project scheduling: Priority rule performance revisited (2010)Characterization and Generation of a General Class of Resource-Constrained Project Scheduling Problems (1995)A competitive genetic algorithm for resource-constrained project scheduling (1998)A hybrid genetic algorithm for the resource-constrained project scheduling problem (2007)Proactive heuristic procedures for robust project scheduling: An experimental analysis (2007)Solving the Multi-Mode Resource-Constrained Project Scheduling Problem with genetic algorithms (2003)Project Scheduling—Theory and Practice (2005)Skilled workforce scheduling in Service Centres (2007)Robust and reactive project scheduling: a review and classification of procedures (2004)A survey of hybrid metaheuristics for the resource-constrained project scheduling problem (2019)Heuristic Algorithms for the Resource-Constrained Project Scheduling Problem: Classification and Computational Analysis (1999)A new efficient simulated annealing algorithm for the resource-constrained project scheduling problem and its multiple mode version (2003)Heuristic Procedures for Reactive Project Scheduling (2006)Project selection, scheduling and resource allocation with time dependent returns (2007)A practical approach to project scheduling: considering the potential quality loss cost in the time–cost tradeoff problem (2011)
this work references cited by second hop

References

  • 1997PSPLIB - A project scheduling problem library1,309 cited
  • 2009A survey of variants and extensions of the resource-constrained project scheduling problem901 cited
  • 2005Experimental investigation of heuristics for resource-constrained project scheduling: An update754 cited
  • 2002Project Scheduling: A Research Handbook716 cited
  • 1996Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation701 cited
  • 2000Experimental evaluation of state-of-the-art heuristics for the resource-constrained project scheduling problem503 cited
  • 2003Project Scheduling with Time Windows and Scarce Resources305 cited
  • 2003Insertion techniques for static and dynamic resource-constrained project scheduling294 cited
  • 1995Semi-active, active, and non-delay schedules for the resource-constrained project scheduling problem222 cited
  • 2006Complex Scheduling187 cited
  • 2000A polynomial activity insertion algorithm in a multi-resource schedule with cumulative constraints and multiple modes125 cited
  • 2008A heuristic solution framework for the resource constrained (multi-)project scheduling problem with sequence-dependent transfer times120 cited
  • 2006Perspectives in Modern Project Scheduling116 cited
  • 2012Project Scheduling with Time Windows and Scarce Resources: Temporal and Resource-Constrained Project Scheduling with Regular and Nonregular Objective Functions

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work

97 cited
  • 2008Managing and modelling general resource transfers in (multi-)project scheduling85 cited
  • Cited by

    • 2019Fuzzy resource-constrained project scheduling with multiple routes: A heuristic solution56 cited
    • 2021Multi-Objective multi-skill resource-constrained project scheduling problem with skill switches: Model and evolutionary approaches51 cited
    • 2018Space-Time Repetitive Project Scheduling Considering Location and Congestion50 cited
    • 2022Simultaneous scheduling of multiple construction projects considering supplier selection and material transportation routing45 cited
    • 2019A bi-objective robust resource allocation model for the RCPSP considering resource transfer costs44 cited
    • 2021New closed-loop approximate dynamic programming for solving stochastic decentralized multi-project scheduling problem with resource transfers39 cited
    • 2020A branch-and-bound embedded genetic algorithm for resource-constrained project scheduling problem with resource transfer time of aircraft moving assembly line38 cited