SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
Development of Deployment Strategy for an Integrated BRT System
0 references·3 citing·4 second hop
Development of Deployment Strategy for an Integrated BRT System (2006)Development of Deployment Strategy for an…Efficient Space Dedication to Bus Rapid Transit and Light Rail Systems (2013)Efficient Space Dedication to…Launching Bus Rapid Transit with Only One Dedicated Lane for Two-Way Bus Traffic on Congested Corridors (2009)Launching Bus Rapid Transit w…Feasibility of One-Dedicated-Lane Bus Rapid Transit/Light-Rail Systems and Their Expansion to Two-Dedicated-Lane Systems: A Focus on Geometric Configuration and Performance Planning (2009)Feasibility of One-Dedicated-…Bus Rapid Transit: An Overview (2002)Characteristics of Bus Rapid Transit Projects: An Overview (2002)CHARACTERISTICS OF BUS RAPID TRANSIT FOR DECISION-MAKING (2004)Bus Rapid Transit--The Eugene-Springfield, OR, USA, Experience (2006)
this work references cited by second hop

References

No references inside the corpus for this window.

Cited by

  • 2009Feasibility of One-Dedicated-Lane Bus Rapid Transit/Light-Rail Systems and Their Expansion to Two-Dedicated-Lane Systems: A Focus on Geometric Configuration and Performance Planning5 cited
  • 2009Launching Bus Rapid Transit with Only One Dedicated Lane for Two-Way Bus Traffic on Congested Corridors3 cited
  • 2013Efficient Space Dedication to Bus Rapid Transit and Light Rail Systems2 cited

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work