SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
A Methodology for Ranking of Causes of Delay for Residential Construction Projects in Indian Context
3 references·8 citing·34 second hop
A Methodology for Ranking of Causes of Delay for Residential Construction Projects in Indian Context (2013)A Methodology for Ranking of Causes of De…Causes of delay and cost overruns in construction of groundwater projects in a developing countries; Ghana as a case study (2003)Causes of delay and cost over…Causes of Delay in Large Building Construction Projects (1995)Causes of Delay in Large Buil…Attributes of UK construction clients influencing project consultants' performance (1994)Attributes of UK construction…Critical success factors of construction projects in Jordan: an empirical investigation (2022)Critical success factors of c…Systematic processing framework for analyzing the factors of construction projects’ delays in Egypt (2021)Systematic processing framewo…Extraction of underlying factors causing construction projects delay in Nigeria (2021)Extraction of underlying fact…Causes of delay in construction projects in Oman (2018)Causes of delay in constructi…4P delays in project management (2018)4P delays in project manageme…Investigating Causes of Delay in U.S. Construction Projects. (2017)Investigating Causes of Delay…RII & IMPI: EFFECTIVE TECHNIQUES FOR FINDING DELAY IN CONSTRUCTION PROJECT (2016)RII & IMPI: EFFECTIVE TECHNIQ…THE CHANGING FACE OF COMPOUND HOUSES IN GHANA AND ITS EFFECT ON RENTAL VALUE: A CASE STUDY OF SELECTED NEIGHBORHOODS IN KUMASI, GHANA (2015)THE CHANGING FACE OF COMPOUND…Public planning: The inter-corporate dimension (1974)Project management in construction (1985)Compressing construction durations: lessons learned from Hong Kong building projects (2002)The analytic network process (ANP) approach to location selection: a shopping mall illustration (2005)Financial statement analysis (2007)Causes of Delay in the Planning and Design Phases for Construction Projects (2010)Reasons for delays in public projects in Turkey (1985)Project Characteristics for Successful Public-Sector Design-Build (1997)A guide to the project management body of knowledge (PMBOK guide) (2004)Causes of delay in large construction projects (2006)Causes and effects of delays in Malaysian construction industry (2007)Risk analysis by integrated fuzzy expected value method and fuzzy failure mode and effect analysis for an elevated metro rail project of Ahmedabad, India (2020)A comparative study of causes of time overruns in Hong Kong construction projects (1997)Factor Analysis of Construction Delays in the U.S. Construction Industry (2017)Major Factors Causing Delay in the Delivery of Manufacturing and Building Projects in Saudi Arabia (2019)A comparative study of machine learning regression models for predicting construction duration (2023)Delays in construction projects: The case of Jordan (2007)Causes of Delay in Building Construction Projects in Egypt (2008)Sampling Methods in Research Methodology; How to Choose a Sampling Technique for Research (2016)A Review on Significant Factors Causing Delays in Saudi Arabia Construction Projects (2022)The major problems between main contractors and subcontractors in construction projects in Egypt (2022)An Index of Factorial Simplicity (1974)A Beginner’s Guide to Factor Analysis: Focusing on Exploratory Factor Analysis (2013)What you Should Know about Megaprojects and Why: An Overview (2014)An analysis of critical factors for adopting machine learning in manufacturing supply chains (2023)Investigation of Project Delays: Towards a Sustainable Construction Industry (2023)Social Research Methods (2013)Project management : a systems approach to planning, scheduling, and controlling (1995)Project Success: A Multidimensional Strategic Concept (2001)The “real” success factors on projects (2002)Delay and cost overruns in Vietnam large construction projects: A comparison with other selected countries (2008)Cost and time control of construction projects: inhibiting factors and mitigating measures in practice (2010)The effect of relationship management on project performance in construction (2011)The significant factors causing delay of building construction projects in Malaysia (2007)
this work references cited by second hop

References

  • 2003Causes of delay and cost overruns in construction of groundwater projects in a developing countries; Ghana as a case study799 cited
  • 1995Causes of Delay in Large Building Construction Projects545 cited
  • 1994Attributes of UK construction clients influencing project consultants' performance271 cited

Cited by

  • 2022Critical success factors of construction projects in Jordan: an empirical investigation49 cited
  • 2021Extraction of underlying factors causing construction projects delay in Nigeria48 cited
  • 2017Investigating Causes of Delay in U.S. Construction Projects.41 cited
  • 20184P delays in project management37 cited
  • 2021Systematic processing framework for analyzing the factors of construction projects’ delays in Egypt35 cited
  • 2018Causes of delay in construction projects in Oman29 cited
  • 2016RII & IMPI: EFFECTIVE TECHNIQUES FOR FINDING DELAY IN CONSTRUCTION PROJECT27 cited
  • 2015THE CHANGING FACE OF COMPOUND HOUSES IN GHANA AND ITS EFFECT ON RENTAL VALUE: A CASE STUDY OF SELECTED NEIGHBORHOODS IN KUMASI, GHANA3 cited

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work